A swim spa enquiry looks simple from the outside: pick a model, send an email, wait for a price. In practice the quote you get back depends almost entirely on what you already know about your site. Two buyers can ask about the same Outdoor Swim Spa WS-130BⅢ and receive very different proposals, because one has measured the pad, checked the power supply and decided how the unit will be lifted into place, while the other is still working that out. The preparation below is what we ask project owners, contractors and procurement teams to gather before the first conversation, so the answer you receive is a real budget figure rather than a rough estimate.
Start with the model card, not the brochure
WS-130BⅢ sits in our configurable outdoor swim and hydrotherapy range. The published catalogue entry lists an overall shell of 9950 × 3000 × 1430 mm, a control system, a swim training system, one water pump, one filter pump, twenty jets, seven LED lights and a total power figure of 10.85 kW. Those numbers are a starting point for a discussion, not an order specification: equipment fitted to the final configuration can change, so treat each line as something to confirm in writing for your unit.
| Item | Catalogue entry for WS-130BⅢ |
| Overall dimensions | 9950 × 3000 × 1430 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump / filter pump | 1 pc / 1 pc |
| Jets | 20 pcs |
| LED lights | 7 |
| Total power | 10.85 kW |
A useful habit is to print this table, mark what your project actually needs and send the marked copy with your enquiry. It removes most of the back and forth that delays quotations.
Six things to settle before you write
- The site condition. Confirm whether the spa will sit on a prepared slab, a deck, a sunken pit or a rooftop terrace, and send the level dimensions of that area with clearance on all sides for maintenance access. Shell size is not the same as installation footprint.
- Access and lifting. Tell us how a roughly ten-metre shell reaches the final position: open garden side, side passage, crane, or hoist over a wall. This single detail changes both the delivery plan and the packaging we quote.
- Power supply. State the available supply at the spa location, including phase, voltage and the distance from the meter or distribution board. Electrical requirements vary by fitted equipment, so we need your site data before recommending cable size, protection or a dedicated circuit.
- Intended use. Daily lap swimming, guest recreation at a hotel or resort, or a therapy programme all point to different jet layouts and water treatment choices. Describe who will use the spa and how often.
- Options you want priced. The catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options. Availability and compatibility vary by model, so list what you expect and let us confirm what fits this unit.
- Delivery terms. Give the destination port or site address, your preferred Incoterms and any target date tied to a construction programme. Our services cover freight forwarding, customs paperwork and door-to-door delivery, but transit arrangements are quoted per project.
Choose the right configuration before asking for options
The 130B shell is offered in more than one build. The WS-130BⅢ catalogue entry shows a swim training system with twenty jets, seven LED lights and 10.85 kW total power, while the WS-130BⅢ-U entry lists four water pumps, twenty-three jets, five LED lights and 11.85 kW, with the swim training system not shown in that specification. Same footprint, different behaviour in the water. If your brief is counter-current swimming against a fixed unit, say so early; if it is jet massage and hydrotherapy seating, say that instead. Comparing these two pages side by side before you write helps you ask about the equipment you actually care about.
Where our team fits into the process
SANTERSON has been manufacturing furniture and building materials in China since 2008, and swim spas are one part of a wider catalogue that also covers outdoor furniture, wall panels, lighting, ceramics and interior fixtures. For a villa or resort project that matters practically: the pool deck, sun loungers, pergola, changing-room joinery and the spa itself can be coordinated through one supplier, which keeps finishes matched and reduces the number of vendors on site. Our stated services run from design consultation and material selection through production, logistics, installation support and after-sales.
If you are specifying several elements at once, sending the full room or landscape drawing with your spa enquiry lets us flag conflicts early, such as a lounger layout that blocks filter access or a deck finish that cannot take the point loads. That coordination is where a one-stop furniture and building materials supplier saves money compared with sourcing each item separately.
A note on verification. Before signing, ask for the confirmed equipment list of your configuration in writing, the electrical specification matched to your supply, the packaging and lifting plan, and the scope of after-sales support at your location, including spare parts availability. Terms such as warranty length, response times and local installer cover are quoted per project and per region, so get them stated in the contract rather than assumed from a brochure.
A short checklist to paste into your enquiry
- Model of interest: WS-130BⅢ or WS-130BⅢ-U, and why
- Site photos, level plan and access route for delivery
- Power supply details at the spa location
- Desired options: heat pump, UV sterilisation, sand filtration, insulation, steps
- Quantity, destination address and preferred Incoterms
- Programme dates for delivery and installation
Send those six items and a supplier can return a quotation that holds up when the concrete is poured. Send only a model number and you will get a price for something you may have to change later.
Planning a pool deck, resort spa or villa wellness area? Tell us your site conditions and configuration and we will prepare a specification and quotation for WS-130BⅢ. Contact SANTERSON to start the conversation.