A paneled hinged wardrobe rarely fails at the drawing stage. It fails in the gap between what the design intent says and what the site, the trade sequence and the purchase order actually allow. Before a project team releases a wardrobe package for production, the following items need to be confirmed in writing — not verbally, and not left to the installer's judgement on site.

1. Confirm the opening, not the nominal room dimension

Hinged wardrobe doors only work if the geometry around them is settled. Before approval, the team should have a measured survey of the actual opening: finished floor level, finished wall faces, ceiling or bulkhead height, and the position of skirting, architraves, services and any pipework that will be covered by the carcass. Slab-to-slab dimensions are not enough, because screed, tiling and plaster change the numbers that matter.

  • Who measured, when, and against which drawing revision
  • Tolerance allowance for out-of-plumb walls and uneven floors
  • Whether the unit is scribed to the wall or front-aligned with a reveal
  • Clearance for door swing in front of beds, vanities, corridors and room doors

2. Confirm the panel construction and the door elevation together

"Paneled" covers a wide range of details that look similar on a mood board and behave differently in production. The approval sheet should state the panel type — raised, recessed or flat moulded — the frame and infill construction, the moulding profile, and whether panels run full height or are split by a rail. Splitting decisions affect visual proportion and long-term movement, so they belong on the shop drawing rather than in an email thread.

Our Paneled Hinged Wardrobes are made to measure with material and finish options and a layout tailored to each project, which means the same elevation can be built several different ways. The point is not to standardise it away — it is to fix the version you want before cutting begins. Related layouts in the same collection, such as Classic Wooden Hinged Wardrobes and Shaker Panel Wardrobe, are useful comparisons when a project needs a consistent door language across bedrooms, dressing rooms and cabinetry.

3. Confirm the finish system and its limits

Finish approval should name more than a colour. For painted or lacquered panels, confirm the substrate, the number of coats, sheen level, and whether the same colour is being matched across wardrobes, internal doors and vanity units from different production batches. Veneer and wood options need grain direction agreed — matching, running or random — because that decision cannot be reversed after the panels are cut.

  • A signed physical sample, not a screen render or PDF swatch
  • Sheen level recorded in writing, since "satin" means different things across suppliers
  • Edge and profile finish on mouldings, where colour usually reads darker than the flat face
  • Which surfaces are visible from the doorway versus hidden carcass faces

4. Confirm hardware, hinge loading and door size

Tall paneled doors are heavy, and hinge specification follows from door height, width, panel construction and material. Confirm the hinge type and count, the load rating, whether soft close is required, and how the handle or integrated pull will be fixed — through-fixing or blind-fixing changes both the appearance and the drilling sequence. Also confirm the gap pattern between doors and from door to frame, since a consistent shadow line is what makes a run of hinged doors read as joinery rather than furniture.

Where the design places a wardrobe next to room Decorative Interior Doors, check that door heights, thresholds and reveals are coordinated so the joinery and the openings share one logic.

5. Confirm the interior layout against how the space will be used

Exterior approval usually gets the attention; interiors get value-engineered late. Fix the hanging heights, drawer positions, shelf spans and any lighting before production, because these are the details occupants notice every day. For a hotel or serviced-apartment programme, confirm whether layouts are identical across room types or varied by unit — repeating an error across forty rooms is far more expensive than correcting it once.

  • Hanging heights for short and long garments, plus shelf spans that will not sag
  • Drawer banks versus doors at the base of the run
  • Integrated lighting: sensor type, cable route, transformer location and service access
  • Mirrors, glass or open display niches, and how they are fixed and replaced

6. Confirm interface trades and the site sequence

Wardrobes sit at the junction of several trades, and slippage almost always comes from an unassigned responsibility. Decide who sets out the unit, who supplies and installs skirting and architrave, who fills and touches up after hanging, and who protects the finished doors while other work continues nearby. Confirm the order: flooring in before or after installation, when electrical first fix and testing are complete, and whether the room is dry and clean enough for joinery delivery.

Practical rule: if a detail is not on the shop drawing or in the specification, it will be decided on site by whoever arrives first. Approving the wardrobe means approving those decisions in advance.

7. Confirm packaging, delivery route and handling to floor level

Made-to-measure joinery is unforgiving of a damaged panel. Confirm panel-by-panel packing, labelling that matches the room schedule, and the physical route from the vehicle to the room — lift dimensions, stair widths, corridor turns and door thresholds. For international programmes this also covers freight mode, customs paperwork and container loading, which our Logistics & Door-to-Door Delivery service coordinates from the factory through to site handover.

8. Confirm who signs off what, and when

Before production release, the package should carry a named approver for each decision: measurements, elevation, finish sample, hardware schedule, interior layout, and site readiness. A single consolidated approval sheet avoids the common failure mode where the architect signs the elevation, the contractor accepts the dimensions, and nobody owns the finish sample.

As a one-stop furniture and building materials supplier, we handle wardrobe and cabinetry packages alongside the internal doors, wall panelling, vanities, lighting and flooring they sit against, which reduces the number of separate approvals a project team has to run. Our Custom & OEM Service covers bespoke dimensions, finishes and layouts, and Installation & After-sales Support covers on-site fixing and snagging once the units arrive.

Approval checklist before release

  • Measured survey against the current drawing revision, with tolerances stated
  • Shop drawing showing panel type, moulding profile, splits and door sizes
  • Signed physical finish sample with sheen level recorded
  • Hardware schedule: hinges, load rating, soft close, handle fixing method
  • Interior layout confirmed for each room type or unit
  • Trade interfaces and site sequence assigned to named parties
  • Packing, labelling and handling route to floor level verified
  • Named sign-off for every decision above

If you are putting together a wardrobe or full joinery package for a villa, hotel or apartment programme, send us the drawings and room schedule and we will return shop drawings, finish options and a consolidated specification for approval. Project enquiries go through our contact page.