A laundry area looks like a small line item on a residential bill of quantities until the first site meeting turns it into an argument about appliance dimensions, door swings, waterproofing and who supplies what. Documenting a Laundry & Storage Combo properly before order placement is the cheapest way to keep that argument off site.

The Laundry & Storage Combo sits in our Laundry Integration collection and is specified for residential bathroom projects. Like every item in that collection, its layout, finish and dimensions are set per project rather than picked from a fixed catalogue size. That flexibility is exactly why the paperwork matters: nothing is standard until your documentation says it is.

Why this line item causes more variation orders than its value suggests

A combined laundry and storage unit touches more trades than a wardrobe or a vanity does. It carries appliances, water supply and waste, sometimes a deep stainless basin, and it sits next to tiled wet areas and cabinetry that must align to the same finished floor level. When any of those interfaces is left undocumented, the correction appears later as a variation order, a delayed tile set-out, or an appliance that arrives on site and does not fit the opening drawn three months earlier.

The unit also tends to be procured late. Kitchen cabinetry attracts attention early, bathroom joinery gets its own package, and the laundry is treated as an afterthought — often released for manufacture after the wet-area waterproofing has already been set out. Documenting it at the same time as the kitchen and bathroom packages removes most of that risk.

The eight items to record before you place the order

1. The appliance schedule, with model numbers

Record the exact washer and dryer models, or state clearly that the appliances are still to be selected and that the carcass will be built to declared maximum envelope dimensions. Note whether the machines are side by side or stacked, whether doors open left or right, and whether the unit must allow the doors to swing fully open for loading. A single missing model number is enough to change a carcass width.

2. Clearances, not just outer dimensions

Capture the finished external size of the unit, and separately the clear opening for each appliance bay. Record allowances for hoses, waste connections, ventilation to the dryer, and any clearance the appliance manufacturer requires behind the machine. If the unit is recessed into a niche, record the niche size at three heights — floor, mid and ceiling — because finished surfaces rarely hold to a single dimension.

3. Benchtop level and basin position

If the combination includes a worktop, document its height above finished floor level and the material. If it includes a deep laundry trough or undermount basin, record the tapware type, spout reach and whether the mixer is wall mounted or deck mounted. These decisions change the carcass structure and the wall backing, so they cannot be settled after panels are cut.

4. Storage layout by item, not by shelf count

State what has to be stored: brooms and mops at full height, detergents in a ventilated compartment, linen on shelves, an ironing board flat against a door. That list drives shelf heights, drawer bank positions and whether doors or open niches are used. Where the storage requirement extends beyond the laundry itself, matching units from the Santerson Corner Storage range can be documented in the same schedule so that finishes and profiles carry through.

5. Material and finish for a damp room

A laundry is a wet environment with intermittent high humidity. Document the substrate, the surface material and the edge treatment, and confirm which finishes are offered for the collection. Record the finish reference in writing rather than relying on a sample named in an email; samples travel badly between offices.

6. Services coordination drawing

Ask for, and archive, one coordinated sketch showing water in, waste out, the electrical outlets, and the dryer vent path relative to the carcass. It does not need to be a formal services drawing — it needs to show who is cutting which opening and at what dimension.

7. Site conditions and access

Record finished floor levels, wall alignment, the route from the loading point to the room, lift or stair dimensions, and whether the unit is delivered assembled or built on site. A one-piece unit that cannot reach its room becomes two units, and that decision costs more when it surfaces at delivery.

8. Approvals and sign-off trail

Keep the approved shop drawing, the finish sample reference, the appliance schedule and the purchase order under one document number with revision dates. When a change is issued, record who authorised it and when. That single file is what resolves a dispute four months later.

What to put in the specification sheet

FieldWhat good looks like
Unit referenceOne code per unit, repeated on drawing, order and delivery note
AppliancesBrand, model, dimensions, door swing, venting need
ClearancesAppliance bay openings and rear service gaps, dimensioned
Benchtop / basinHeight above FFL, material, tapware type and position
Storage briefList of stored items with required heights
FinishWritten finish code plus approved sample reference
InterfacesTiling, waterproofing, ceiling and skirting hand-offs named by trade
Access routeLift or stair size, assembled or flat-packed delivery
RevisionsDate, author and reason for every change

How made-to-measure production changes the paperwork

With a made-to-measure supplier, the shop drawing is the contract. Because dimensions, layout and finish are confirmed per project, the approved drawing replaces catalogue data as the controlling document — which means an unsigned or unversioned drawing is not a minor administrative slip, it is an unprotected scope. Confirm that production does not start until the signed drawing and the finish reference are both on file.

Related units in the same collection should be documented together rather than as separate small orders. Compact Laundry Solutions covers tight layouts where a full combination unit will not fit, and Wall Mounted Cabinets picks up the storage that cannot sit on the floor. Documented as one schedule, these units share finishes, hardware and delivery windows; documented separately, they arrive in different shipments with mismatched profiles.

Practical test before releasing the order: can a site supervisor who has never seen the design draw the correct unit from your documentation alone, and can an appliance installer connect it without asking a question? If either answer is no, the file is not finished.

A short pre-order checklist

  • Appliance models confirmed, or maximum envelope dimensions stated in writing
  • Niche and clear-opening dimensions taken on site at three heights
  • Benchtop height, basin and tapware position fixed
  • Storage brief written as a list of items to be stored
  • Finish code recorded against an approved sample
  • Services sketch showing water, waste, power and dryer vent
  • Delivery access route measured and stated
  • Shop drawing signed, dated and version-controlled
  • Interfaces named by trade: tiling, waterproofing, ceiling, skirting

Dimensions, layouts and finish options for the Laundry Integration collection are confirmed project by project. Send your room dimensions, appliance choices and storage brief and we will return a shop drawing for review before anything goes into production.

Send us your laundry schedule. Share the room dimensions, appliance models and what needs to be stored, and our team will prepare a made-to-measure Laundry & Storage Combo drawing for your project. As a China-based manufacturer of furniture and building materials serving villa, hospitality and office projects, we coordinate cabinetry with the rest of the fit-out package and arrange door-to-door delivery.