A swim spa does not fail in the showroom. It either arrives ready to set on the prepared base, or it arrives with a cracked shell, a bent cabinet edge and a control panel whose wiring harness has come loose. As a China furniture and building materials manufacturer, we see this most often on orders where the packing plan was never discussed — the buyer assumed standard export cartons, the factory shipped an out-of-gauge shell. For an order of Outdoor Swim Spa WS-PC07ST, packaging is not a line item on the invoice; it is the difference between a clean site handover and a claim that stalls the whole outdoor area of a project. Below is the list we ask buyers to confirm before production starts, so the packing plan is agreed in writing rather than discovered at the loading port.

Start from the unit you are actually shipping

WS-PC07ST sits in our configurable outdoor swim and hydrotherapy range. The catalogue records these figures for the standard configuration, and they drive every packaging decision that follows: overall footprint, lifting points, and how many separate consignments the order becomes. Confirm them against your own order before you brief the site team.

ModelWS-PC07ST
Catalogue dimensions7000 × 2400 × 1470 mm
Control system1 set
Swim training system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4
Total power6.55 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Two things in that table change the packing plan. First, a 7000 mm length with a 2400 mm width is an out-of-gauge profile for standard container stowage, so the shell and its cabinet are shipped as their own consignment rather than mixed with other goods. Second, the order carries separate assemblies — control system, swim training unit, filter pump, jets and LED fittings — that travel protected and, in most configurations, apart from the shell. Ask us for the packing list per consignment before you approve production: number of packages, each package's dimensions and gross weight, and which items are crated versus boxed.

Catalogue figures describe the standard configuration. Options such as heat pumps, UV sterilisation, sand filtration, insulation and steps are added to the same order but change the crate count and the total volume. Confirm the exact configuration you have ordered before treating any packing figure as final.

Confirm the shell and cabinet protection

The shell is the part that cannot be replaced on site without stopping the programme. When we discuss the packing plan with you, we settle these points in writing:

  • Shell support. The shell rests on a full-length bearing base inside the crate, not on four corner blocks, so handling loads spread along the length instead of concentrating at the ends.
  • Surface separation. A cushioning layer between the shell and the timber crate, with the cabinet panels wrapped individually so fixing hardware cannot chafe the finish in transit.
  • Crate construction. Timber crate with internal bracing and external strapping, plus corner protection on the cabinet edges where forklift tines make contact.
  • Marks on the outside. This-side-up and keep-dry markings, centre-of-gravity marks for lifting, and package numbers that match the packing list line by line.

Confirm how pumps, jets, lights and controls are packed

The filter pump, the six jets, the four LED fittings and the control system are the components most often damaged by compression rather than impact. They are packed in rigid boxes with cushioning on all faces, then secured inside the main consignment so they cannot shift against the crate wall. Three details matter for the electrician who later commissions the spa:

  • Each cable and harness is coiled, labelled and bagged, so it can be matched to its device without tracing wires back through a box.
  • The control system ships in a moisture-protected package, because it is the one item that cannot be repaired with spare parts from a local supplier.
  • Glass and acrylic components — jet faces and lens covers — are separated by dividers, never stacked face to face.

Confirm the freight plan between our factory door and your site

Packaging only earns its cost if the rest of the journey is planned around it. Our Furniture Logistics and Door-to-door Delivery service covers freight forwarding by sea, air and rail, customs documentation, container loading and shipment tracking. The page also lists commercial invoices, packing lists, certificates of origin and import permits. For a swim spa order you should confirm with us, before booking:

  • Loading method. Who lifts the crate into the container, and with what equipment — a forklift of adequate reach, or a crane with slings rather than chains.
  • Container type and stowage. Whether the shell goes in a standard 40-foot high cube, an open-top or flat-rack unit, and how it is lashed and blocked against the ends.
  • Cargo insurance. Who holds the cover, for what declared value, and which party files the claim if the crate arrives with visible damage.
  • Unloading at destination. Whether your site has access for the vehicle that arrives, and whether the crate can be opened on a flat, firm surface close to the final position.

Confirm what is inspected on arrival, before you sign

Write this short sequence into your site instructions so whoever receives the delivery follows it:

  • Photograph the crate on all six faces before any fastener is cut. Damage to the crate exterior is your first evidence for a claim.
  • Count packages against the packing list and check package numbers, not just the total.
  • Open the component boxes first and inspect the control system, pump, jets and LED fittings for shifted cushioning or cracked housings.
  • Inspect the shell along its length under raking light for stress marks, then check the cabinet edges and fixing points.
  • Record the configuration against your order — number of jets, LED fittings, control system and swim training unit — before any water is filled.

Where installation and after-sales fit into the plan

Packaging decisions made early reduce the work left for the site team. Our Furniture Installation and After-sales Support service lists on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance. Agree with us in advance which items we commission on site — electrical connection, the swim training unit, ozone and filtration — and which your local contractor handles, so nothing is opened or adjusted twice.

If WS-PC07ST sits within a wider outdoor package for a villa or resort, it is usually worth shipping the spa together with matching Outdoor Furniture for Villas and Resorts from the same programme. One coordinated packing plan, one delivery window and one snag list are easier to manage than three separate consignments arriving on different weeks.

Send us your configuration for Outdoor Swim Spa WS-PC07ST — model variant, options such as heat pump or sand filtration, destination port and site access — and we will return the packing plan with package count, dimensions, gross weights and stowage proposal for your approval. Contact PHILLIP on +86-13928214007, email santerson@qq.com, or use the form on our contact page. Enquiries receive a response within 24 hours.