A swim spa that leaves the factory in good condition can still arrive with a cracked shell, a bent jet housing or a missing pump. On a compact unit such as Outdoor Swim Spa WS-PC01, most of that risk is settled before the crate is closed, not after. This guide sets out what a purchaser should confirm about packing, crating and container loading for this model, so the specification conversation and the shipping conversation happen at the same time.
Why the shell size drives the whole packing plan
The catalogue lists WS-PC01 at 3000 × 1050 mm, with a total power figure of 6.65 kW across two water pumps, one filter pump, 53 jets, one control system and one LED light. Those numbers matter to the freight discussion for two reasons.
First, the shell is a single large moulding with a finished interior face and a rim that carries the jets. It cannot be broken down into smaller modules, so it travels as one piece and needs full-perimeter support rather than corner protection alone. Second, the equipment set — pumps, filter, control system, ozone unit where fitted — is shipped alongside or mounted on the shell, and each of those items has its own damage mode: impellers seized by grit, wiring harnesses chafed, jet faces scratched.
Ask the supplier to state, in writing, how the shell and the equipment are separated for transit. A single line such as "shell on a timber skid, pumps and control system in a separate plywood box" is more useful than the word "export packing".
Six things to confirm before production starts
- Crate type and material. For this product class the usual answer is fumigated or heat-treated timber (plywood cases plus a base skid), matched to ISPM 15 marking requirements for timber packaging on international shipments. Confirm that the crate is marked, and ask which treatment applies if your destination imposes phytosanitary inspection.
- Shell support and cushioning. Confirm the shell sits on a continuous bearing surface rather than point supports, with foam or EPE between the moulding and any hard timber member, and that the finished interior face is protected from abrasion for the whole journey.
- How equipment is secured. Pumps, filter pump and control system should be individually boxed or blocked in place, not loose-strapped to the shell. Ask whether the jet faces are taped or capped.
- Weight and centre of gravity marked on the crate. A single-piece shell with a heavy machinery bay shifts its centre of gravity; it should be marked so the handler lifts it the right way, and so you can check that the lifting plan at site matches the crate markings.
- Lifting points and access route. Confirm the crated dimensions and gross weight against your site's access — gate width, turning radius, whether a forklift or crane is needed. A 3 m shell that clears a loading dock in a warehouse will not always clear a garden side-access in a villa retrofit.
- Container stowage plan. Ask how the unit will be loaded and secured — block bracing, dunnage bags, strapping to container anchor points — and whether it shares the container with other goods. Mixed loads are where most rim and jet damage originates.
How options change the packing list
The WS-PC01 catalogue lists configurable options including control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each option adds either bulk or a fragile item, so the packing list grows with the specification.
| Option | Packing consequence to confirm |
|---|---|
| Heat pump | Separate boxed unit; confirm it travels in its own carton inside the crate, and that refrigerant transport documentation is handled by the supplier. |
| Sand filtration | Bulkier than a cartridge filter; confirm whether the media is shipped dry and empty, and how the multiport valve is protected. |
| Insulation / cover | Bulky but low-risk; confirm it is packed so it can be opened first on site without opening the shell crate. |
| Steps | Loose component; confirm it is crated separately and listed as its own line on the packing list. |
| UV sterilisation | Glass or quartz sleeve inside; confirm it is boxed with cushioning rather than fitted loose in the machinery bay. |
Availability and compatibility of these options vary by model and configuration, so treat the option list as a starting point to be confirmed for the specific order.
Paperwork that has to match the crate
A packing dispute usually becomes visible as a customs or delivery problem, which is why the documents should describe the physical shipment exactly. Confirm before despatch that you will receive a commercial invoice, a packing list naming every crate and line item, and any certificate of origin or import permit your destination requires. Where the shipment includes timber crating, confirm the treatment marking is present, because an unmarked crate can be refused at the border.
SANTERSON's logistics service covers freight forwarding by sea, air and rail together with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Ask which of those stages you are buying on a given order, and which Incoterms apply — the same crate handled differently under FOB and under a delivered arrangement produces very different claim positions if it arrives damaged.
For an overview of how freight and packing sit inside the wider delivery scope, see Furniture Logistics and Door-to-door Delivery. If your swim spa is one line in a larger villa or hospitality order, coordinating it with the rest of the shipment through Turnkey Interior Project Solutions reduces the number of separate consignments arriving on different dates.
Inspection at delivery, before anything is signed for
- Photograph all four crate faces, including any damage marks, before the crate is opened. Note the container and seal numbers.
- Check the crate markings against the packing list line by line, including separately crated steps and boxed equipment.
- Open the equipment cartons first. Pumps, filter and control system are the items most likely to be internally damaged while looking fine externally.
- Inspect the shell for hairline cracks at the corners and around jet mountings, and check the rim for chips where strapping ran.
- Record any discrepancy on the delivery document itself, not only in an email afterwards. Claims filed against a clean receipt are difficult to pursue.
Once the unit is accepted, the next stage is siting, levelling, electrical connection and commissioning. The scope for that work — on-site installation, inspection and snagging, spare parts and maintenance support — is set out under Furniture Installation and After-sales Support. Agree in advance who supplies the electrical feed, who signs off the connection and what happens if a component fails after commissioning.
Short version of the packing checklist
- Crate material, treatment and marking stated in writing
- Continuous support for the shell, cushioning on the finished interior face
- Pumps, filter, control system and jets packed separately and blocked in place
- Gross weight, crated dimensions and centre of gravity marked and checked against site access
- Container stowage and securing method confirmed; mixed-load risk understood
- Packing list matches every physical crate, including options such as steps and heat pump
- Delivery inspection protocol agreed before despatch, not after
Confirming these details costs a few exchanges at quotation stage. Skipping them turns a 3000 mm shell into a freight claim. If you are specifying this model for a villa or resort project, send the site access photos and your required option set with your enquiry, and ask for the packing arrangement to be described in the same document as the technical specification.