A glass-front bar cabinet looks simple on a mood board and complicated on site. The glazing that makes the piece attractive is also what exposes uneven reveals, wrong door clearances and lighting that does not match the switch circuit. A product submittal is how we settle those questions before production starts, so the drawings, finishes and hardware you approve are the ones that reach the project.

This page sets out what a complete submittal package for Santerson Glass Front Bar Cabinets contains, who signs off each part, and what to check before you approve it. Use it as a checklist when you request a package from us or from another supplier — the same sections apply to Tall Bar Cabinets and to cabinetry elsewhere in the same joinery run.

Why the submittal comes before the order

Bar cabinets are made to measure for each space, with the layout, material and finish selected per project. That means there is no standard drawing to fall back on: every dimension, door swing and shelf position has to be drawn for your wall opening and confirmed by you. Once we cut board and temper glass to those numbers, a change costs material and time that a signature on a drawing would have avoided.

For the buyer, the submittal is also the document that lets you compare two quotations honestly. A cabinet priced without a stated glass type, frame section or hinge brand is not comparable with one that states them.

1. Shop drawings and dimensions

  • Elevation of each cabinet face, with overall height, width and depth marked on the drawing rather than quoted in an email.
  • Plan section showing the carcass in relation to the finished wall face, floor finish and any adjacent appliance or counter return.
  • Internal set-out: shelf heights, glass shelf positions, drawer stack, wine rack or bottle storage where required.
  • Door and drawer front sizes with the gap between fronts stated, plus which hand each door opens on.
  • Kick/plinth detail and how the unit is packed out to an uneven floor or wall.

2. Materials and finish schedule

List each surface separately, because a single phrase such as "oak veneer" does not tell a factory what to build:

ItemWhat the schedule must state
CarcassSubstrate board type and thickness, edge treatment, interior finish colour or laminate code
Door and drawer frontsConstruction (framed or slab), core, face material, grain direction, edge profile
FinishLacquer, veneer, laminate or acrylic, sheen level, colour reference from a physical sample
Glass frontGlass type and thickness, tint (clear, bronze, smoked, frosted), whether tempered, and the frame that holds it
MetalworkFrame or profile finish, handle or pull detail, matching to other ironmongery in the project
Worktop (if any)Material, thickness, edge profile, upstand and cut-out positions for sink, tap or appliances

Our Custom Furniture Materials and Finishes service covers bespoke finishes, textures and material selection, so where a design calls for a finish outside the standard palette we specify it in this schedule and send a sample for sign-off.

3. Hardware and glazing specification

State brands, model numbers and load ratings for hinges, slides and handles, together with the opening method — push-catch, handleless profile or pull — because that decision changes the door rebate. For glass fronts, record the frame system that retains the glass, the gasket or setting block detail, and the tempering requirement. If a soft-close specification matters to your client, it should be on the schedule, not left to the assembler.

4. Integrated lighting

Most glass-front bar cabinets are lit internally, so the submittal needs the same electrical detail as any other lit joinery: fitting type and position, colour temperature, driver location for service access, and how the circuit is switched — door-activated, touch or a wall switch on the project's lighting circuit. Where the cabinet sits in a wider run, coordinate this with Santerson Integrated Cabinet Lighting so driver positions and cable routes are consistent across units. A driver hidden behind a fixed panel is a maintenance problem on day one.

5. Site conditions and interfaces

  • Floor and wall finish build-up at the cabinet line, with the completed-level dimension given to us rather than the structural slab.
  • Position of services, sockets and switches that fall behind or beside the unit.
  • Protection requirements for glass during transit and storage on site.
  • Access route from the delivery point to the room, including lift size, stair turns and door widths.

6. Commercial terms and approvals

The package should close with a priced bill of quantities per unit, the production sequence for the units in your programme, packing and container loading plan, and the delivery terms quoted for the site. Our Furniture Logistics and Door-to-door Delivery service covers freight forwarding, customs documentation and door-to-door delivery; the specific Incoterms, duties and transit window for your port of entry are confirmed on the quotation rather than assumed. Installation scope, snagging and after-sales response should also be written into the same approval sheet.

Approval route

Typically the interior designer or architect reviews drawings and finish samples, the client approves appearance and layout, and the builder or fit-out contractor confirms site dimensions and services. We work to that route through our Interior Design Services team, which handles drawing coordination, production follow-up and on-site guidance.

What we do not put in a submittal: dimensions, glass thickness or finish names presented as fixed values for this product line. Glass-front bar cabinets are configured per project, so each number in the package is drawn from your opening and confirmed with you before sign-off.

Before you sign

  • Every dimension on the drawing carries a completed-level reference, not a structural one.
  • Glass type, tint and tempering are named, and the frame detail is drawn.
  • Finish colour has been approved against a physical sample, not a screen render.
  • Lighting driver positions and switching are shown on an electrical layout.
  • Hardware brands and opening methods are listed with no "or equivalent" wording.
Send us the room elevation, the finish reference and your programme dates, and we will return a submittal package for Santerson Glass Front Bar Cabinets with drawings, a finish schedule, hardware and lighting specification, and priced quantities — as part of our Custom Furniture Design and Prototyping service. Contact PHILLIP to start the drawing stage.