A frosted glass aluminium frame wardrobe looks finished the moment the last panel clicks into place — and it stays finished only if the plan behind it was written before production started. Glazed fronts show every out-of-plumb wall, and an aluminium frame leaves almost no room to correct a measurement later. That is why we treat the installation plan as part of the product, not an afterthought. Below is what we put into that plan on our own made-to-measure projects, and what your site team needs from it before a single panel arrives on site.

Why Glazed Wardrobes Reward Planning Better Than Solid Doors

Solid timber or laminated doors forgive small errors: a sash can be planed, a hinge recess moved. A frosted glass aluminium frame wardrobe behaves differently on three counts, and each one belongs in the plan:

  • Glass is cut once. Panels are cut and edged to the opening. Re-cutting means a new panel and a new lead time, so the recorded dimensions have to be right the first time.
  • Frames transfer load to the fixing surface. The frame carries the weight of the glass, so the wall or floor it is anchored to has to be described in the plan — material, flatness and what it can accept.
  • Frosted glass reveals alignment. Its surface diffuses light rather than reflecting a sharp image, which makes gaps, shadow lines and uneven reveal widths between doors more visible, not less.

The plan is therefore a coordination document between the factory and the site. When both read the same numbers, the on-site work reduces to assembly.

1. The Survey Record — Measured, Not Drawn

Every dimension in the plan should trace back to a dated site survey, not to a design drawing. For each wardrobe run we record:

  • Height at three points along the run — floor level in a room is rarely consistent across four metres.
  • Width at top, middle and bottom, plus the diagonal, so out-of-square walls are known before the frame is sized.
  • Plumb and level reference lines, marked on site and photographed, with the deviation noted for each wall.
  • Obstructions: skirting boards, architraves, downlights, ceiling cornices, air grilles, door swings, light switches and handle clearance.
  • Finished floor level and finished wall finish, stated explicitly, because a 12 mm difference between the surveyed state and the completed state changes every opening.

State in the plan whether dimensions are as-surveyed or finished. If tiling, plastering or joinery is still to come, the survey date and the expected change must both appear.

2. Layout and Internal Zoning Agreed Before Glass Is Ordered

Frosted glass hides contents while showing silhouette, so internal zoning is decided with the client at plan stage rather than on site. Our frosted glass aluminium frame wardrobes are built to project-specific layout, so the plan carries:

  • Hanging sections, shelf heights, drawer banks and shoe or accessory storage drawn to the client's actual wardrobe inventory.
  • Door count, opening direction and the handle or profile pull on each elevation.
  • Which bays are glass-fronted and which are solid — a common mix in villa bedrooms, where linen storage sits beside display shelving.
  • Internal lighting positions, cable routes and the transformer or driver location, with access to it left clear.

3. Material, Finish and Glass Specification Sheet

The plan should name what is being installed in terms a site supervisor can check on delivery. Our aluminium frame glass wardrobes specification covers:

  • Frame profile and finish — aluminium frame, colour or anodised finish, and the profile type (sliding, hinged or framed panel).
  • Glass type and degree of frost — frosted, clear, bronze or smoked are all offered in this family; the plan states which one applies to each elevation.
  • Carcase board material, edge treatment and colour reference, matched to the joinery package on the same project.
  • Hardware schedule — hinges, slides, soft-close devices, hanging rails and any integrated lighting, listed with quantities per bay.

Where a project mixes finishes across levels or rooms, one specification sheet per room prevents a single shared sheet from being read incorrectly on site.

4. Interface Details: What the Wardrobe Meets On Site

Most call-backs we hear about originate at an interface, not in the product. The plan should carry a simple detail for each of these:

InterfaceWhat the plan must state
FloorWhether the frame sits on the finished floor or a recessed track, and the load path into the slab or timber bearers.
CeilingGap allowance for cornice or shadow gap, plus whether the top rail is fixed to a ceiling bearer or to the side panels.
Side wallsFixing substrate behind plasterboard or cladding, and the packer or scribe width used to absorb wall deviation.
Adjoining joineryWho supplies the transition — kitchen, vanity or media wall — and where the line between trades falls.
ServicesPositions of power outlets, data points and lighting circuits that must not be drilled into.

5. Tolerances, Sequencing and Site Readiness

A plan is only useful if it says what has to be true before the delivery date. We list site readiness as a checklist the client's builder signs off:

  • Wet trades, painting and floor finishes complete, with the room clean and dry.
  • The surveyed reference lines still visible and unobstructed at delivery.
  • Clear access from the lift or entry to the room, including panel length against corridor turns and lift doors.
  • A stated tolerance range for each opening, agreed in writing — with who adjusts what if a wall moves outside it.

Sequencing matters as much as readiness. Glass-fronted wardrobes go in late in the programme, after works that could damage a glazed front, and internal lighting is connected only once its driver location is fixed and accessible.

6. Delivery, Handling and Assembly Sequence

The plan should follow the goods from the container to the room:

  • Packaging schedule and piece count per bay, so the site team can check the delivery against the plan rather than a generic packing list.
  • Glass handling route and storage position — upright, supported, out of traffic — before installation begins.
  • Assembly order: frame aligned and anchored, then shelves and drawers, then glass panels last, then hardware adjustment.
  • Named responsibility for each step when the site team installs and we supply, so no step is assumed by both sides.

7. Snag List, Adjustment and Handover

The final page of the plan is the acceptance record: door alignment and reveal widths, smooth travel on every slide and hinge, soft-close function, glass clean and free of edge chips, lighting circuits tested, and internal fittings installed to the zoning drawing. Each item is signed off with the date and the person responsible. We also keep spare parts and replacement components available for glazed fronts and hardware, which is only practical when the specification sheet in the plan matches what was actually built.

Our scope on these projects runs from design consultation and made-to-measure production through door-to-door delivery, installation support and after-sales service, so the plan we work to during production is the same one handed to the site team at handover. See our installation and after-sales support and custom and OEM service pages for how that coordination is arranged.

Frosted glass aluminium frame wardrobe with made-to-measure layout
Frosted glass panels in an aluminium frame, built to project-specific dimensions and finish.

Planning Questions Worth Answering Before You Order

Which frost level suits a bedroom with limited natural light?

Frosted glass passes diffused light into the room while obscuring contents, so it reads lighter than a solid door in a narrow corridor or windowless walk-in. Compare it against frosted glass wardrobes with hinged doors on the same project brief before fixing the elevation.

Sliding or hinged?

Decide this in the plan, not at delivery. Sliding fronts need track depth and clear floor run; hinged fronts need swing clearance from the bed edge or opposite wall. The chosen mechanism changes frame size, panel dimensions and the fixing detail.

Who measures, and when?

The plan names one party responsible for the final survey after all wet trades are complete. Made-to-measure sizing means that survey is the last chance to change a dimension without re-cutting glass.