An open wardrobe with a metal frame looks simple from the outside: uprights, rails, shelves, a few panels. That apparent simplicity is exactly why custom projects go wrong. Because there are no doors to hide tolerances, every junction, span and finish sits on show once the unit is installed. Before production starts, we ask project buyers, contractors and designers to lock down the points below. Each one is cheaper to settle on paper than to fix on site.
1. The measured opening, not the drawing dimension
Our Metal Frame Open Wardrobes are made to measure, which means the production file must reflect the room as it will be when the unit arrives, not as it appears on a design drawing. Before we cut anything, confirm:
- Finished floor levels, including the thickness of any flooring, screed or plinth that will be laid after the wardrobe is measured.
- Finished wall faces — plasterboard, render, tiling or stone cladding all change the clear width and depth.
- Floor-to-ceiling height at several points along the run, since slabs and ceilings are rarely level across a long wall.
- Skirting, architraves, cornices or rebates that the frame must clear or scribe around.
For walk-in and L-shaped runs we also ask which corner is fixed and where the mitre should sit, because that decision changes both the frame sizes and the shelf lengths.
2. What the frame actually has to carry
Open wardrobes have no door carcass to stiffen the assembly, so the frame profile and its fixings do all the structural work. Tell us the loading before we specify the section:
- Long-span hanging rails for coats and dresses need different support spacing than short rails for shirts.
- Deep shelves holding folded denim, towels or linens deflect over time if the span is too long for the panel material.
- Drawer banks and pull-out baskets need solid blocking or a dedicated frame bay; they cannot be hung from a light upright.
- Integrated lighting, mirrors or glass shelves add weight and need pre-planned wiring routes and bearing surfaces.
Where a run is taller than a standard room height or carries heavy loading, we can add intermediate posts, deeper sections or wall bracing. That decision belongs in the shop drawings, not in a site conversation on delivery day.
3. Wall substrate and fixing method
This is the most commonly missed item on open wardrobe projects. A metal frame fixed to a substrate that cannot take the load will move, no matter how well it was made.
| Substrate | What we need confirmed before production |
| Concrete or masonry | Standard anchor fixing; confirm whether the wall is to be tiled or rendered afterwards. |
| Stud partition / drywall | Position of vertical studs, or timber backing built into the wall at the fixing lines. This must be designed in before the wall is closed up. |
| Tiled or stone-clad wall | Whether fixings penetrate the finish or land in a pre-set recess, so we do not risk cracking the cladding on site. |
| Freestanding installation | If the wall cannot be drilled at all, a floor-standing frame with ceiling or side restraint is usually the better option — see our Freestanding Open Wardrobes. |
4. Frame finish and how it meets the other materials
On an open wardrobe the frame is the visible architecture of the piece, so its finish has to be specified alongside everything it touches:
- Frame colour and texture — powder-coated or metallic frames read differently against a matte wall than against a high-gloss one.
- Shelf and panel material, and whether the wood grain or veneer direction should run consistently across the whole run.
- Edge treatment where shelves meet uprights; exposed edges are visible from both sides in an open layout.
- Adjacent joinery — a wardrobe that stops short of a matching built-in furniture run needs the transition detail drawn, not improvised.
We produce samples for the frame finish and the panel material before full production. For multi-unit villa or hotel work we recommend approving one complete bay first: a sample bay shows the joint quality, the shelf depth in use and how the frame reads against your actual wall finish.
5. Internal layout confirmed against real storage needs
Open wardrobes reward planning because everything is fixed once built. Before sign-off we check the hanging heights, shelf depths and drawer positions against how the space will actually be used — long garments, suits, folded stacks, bags, bedding, or a mix across several bedrooms. If the same layout repeats across units, confirm it once and we standardise the production file; where room sizes differ, we keep the module identical and adjust only the end bays.
6. Site sequence, access and handover
- Which trade fixes the frame and which supplies the wall backing — this has to be in the programme before the walls are closed.
- Delivery route: lift sizes, stair widths and corridor turns decide whether a long upright arrives in one piece or is split with a joint detail agreed in advance.
- Installation stage relative to painting, flooring and lighting, so the frame is not damaged by other trades afterwards.
- Storage on site before installation, especially for panels and glass shelves.
If you are specifying open wardrobes for a villa, apartment or hospitality project, send us the drawings and the wall build-up, and we will come back with a specification that lists exactly what still needs confirming — before any metal is cut.