A flush wall aligned door looks simple from the finished side. That is exactly the problem: because there is no visible frame, casing or architrave to fall back on, every measurement, hardware choice and wall detail has to be settled before the panel is cut. Below is the confirmation list we work through with architects, builders and project buyers before a Flush Wall Aligned Doors order goes into production.
1. Opening sizes, and how they were taken
Made-to-measure sizing is the starting point, but a flush aligned door is less forgiving than a standard cased opening. For each opening we ask for:
- Structural opening width and height at three points across the span, not one nominal dimension repeated on a drawing.
- Finished floor level to finished ceiling level, with the floor build-up (screed, adhesive, tile or timber) stated so the drop is calculated against the completed surface.
- Wall thickness and the wall build-up, because the concealed frame has to sit inside it without packing out or reducing the reveal.
- Squareness and plumb of the surrounding structure, plus the tolerance you expect us to absorb on site.
Where several doors share one corridor, we confirm each opening individually. Identical dimensions on a plan rarely mean identical openings once the substrate is up.
2. How flush the finish actually needs to be
"Flush" covers several different details, and they are not interchangeable:
- Wall-plane flush — the door face sits in the same plane as the finished wall on one side or both. This is what a Flush Wall Aligned Doors specification normally means, and it decides which side the hinges sit on.
- Panel-line flush with panelling — the door is aligned with a reveal or groove in surrounding panelling. Here the door travels with the panel layout, so we need the panel setting-out drawing, not just the door schedule.
- Recessed or shadow-gap detail — a deliberate gap around the leaf instead of a continuous joint, which changes the frame section.
For villas and hotel rooms where doors disappear into a paneled wall, we usually pair these with Integrated Door & Paneling so the leaf, panelling and reveal are drawn, produced and finished as one package rather than coordinated between two suppliers.
3. Hardware, and what is inside the wall
Concealed hardware is specified before the panel is made, because it cannot be changed afterwards without rework:
- Concealed hinge type and quantity, set against the leaf size and weight we are producing.
- Concealed or minimal-handle option — see Handleless Concealed Doors where no visible handle is wanted, and the pull profile or finger recess that replaces it.
- Lock case, latch, cylinder or privacy set, with the key or access requirement confirmed per room type.
- Door stop and hold-open arrangement, plus the swing direction and clearance in front of the opening once furniture is placed.
- Wall substrate behind the frame. Plasterboard, masonry and steel stud behave differently, and the fixing method has to be agreed with the site team before the frame arrives.
4. Finish, and where the door will live
Material and finish options are confirmed per project, and we recommend a physical sample approval rather than a colour code on a schedule:
- Painted, lacquered, veneered or laminated face, matched to the adjoining wall finish — including sheen level, which is what gives away a mismatch under raking light.
- The joint treatment between door face and wall, agreed with the painting or finishing trade before handover.
- Room conditions: bathrooms, laundries and pool-adjacent corridors need a different build-up and edge treatment from a bedroom corridor.
- Fire, acoustic or privacy performance where the project requires it. If your specification calls for a rated door, tell us at enquiry stage; the leaf construction and hardware change accordingly.
5. Quantities, phasing and site sequence
Flush aligned doors are one of the last items installed and one of the first things a client criticises, so the schedule matters:
- A door schedule with an opening-by-opening reference number that matches the setting-out drawings used on site.
- Production released in phases where wet trades are still working, so finished leaves are not sitting in a dusty building.
- Delivery route and storage on site — full-height panels need access that many sites discover too late.
- Who installs: our team under guidance, or your joinery crew with our fixing details. Either way the sequence is frames first, wall finish second, leaves last.
| Item to confirm | What we need from you | Settled before |
|---|---|---|
| Opening dimensions | Measured openings, finished floor levels, wall build-up | Frame manufacture |
| Flush detail | Cross-section or reference drawing of the wall-to-door joint | Frame section selection |
| Hardware set | Hinge, lock and handle preference, access requirement per room | Panel preparation |
| Finish | Approved physical sample, sheen level, joint treatment | Surface finishing |
| Performance | Any fire, acoustic or moisture requirement in the specification | Leaf construction |
| Schedule and phasing | Numbered door schedule, delivery windows, installer of record | Production release |
- Openings measured on site at the completed build-up, not taken from a structural drawing alone.
- A section detail showing how the door face meets the finished wall.
- Hardware list with swing direction and access type for every opening.
- Finish sample approved against the adjoining wall, in the light of the actual room.
- Numbered door schedule tied to the setting-out drawings.
How this fits a wider fit-out
Doors rarely stand alone. When they are produced alongside cabinetry, panelling and other joinery in one package — as with our Custom Built-in Kitchen Cabinets and whole-project joinery work — the veneer, lacquer and reveal language carries across the building, and one supplier carries the coordination. As a one-stop furniture and building materials supplier, we handle these doors together with design coordination, custom/OEM production, door-to-door logistics and on-site support, which removes the usual argument between the wall contractor and the door supplier about who owns the tolerance.
Dimensions, hardware sets and finish selections are confirmed for each project before manufacture. Send your door schedule and opening measurements and we will return a specification to check against yours.
Working on a villa, hotel or residential project in Australia? Send us your door schedule and opening measurements and we will return a full specification for review before anything goes into production.