Windows & Doors · Project Procurement · Australia

Decorative interior doors rarely fail in the showroom. They fail on site, when an opening is 15 mm out, a finish does not match the joinery sample, or a hinge set never cleared customs. If you are specifying Santerson Decorative Interior Doors for a villa, apartment or hospitality fit-out in Australia, the checklist below covers what to confirm before a purchase order is signed and again before the container is loaded.

1. Confirm what the product page actually promises

Santerson's interior door listings are configuration-based rather than fixed-specification catalogue items. The published description for this collection states that finish, layout and dimensions can be specified to suit each space and project, with made-to-measure sizing plus material and finish options, and it closes with an instruction to confirm dimensions and selected specifications for each project.

That wording has a practical consequence: the product page is not a specification sheet. Treat it as a starting point, and require a written, project-specific spec pack before pricing is final. A usable spec pack should record leaf size and thickness, frame and lining dimensions, core construction, face material and finish code, glazing type where relevant, ironmongery package, and the opening tolerance the door set is built to. If any of these are missing from the quotation, ask for them in writing rather than relying on a photo of a previous order.

2. Take site measurements yourself, and state who owns them

Made-to-measure joinery only works when the measurement record is trustworthy. For each opening, capture structural width and height at three points each, plus floor finish level, wall build-up on both reveal faces, and the position of any services that could interfere with linings or fixings.

Then settle, in the order documents, whose measurements govern production. Two common arrangements work well:

  • Buyer-supplied openings. Your builder or installer produces the opening schedule and accepts it as final; the factory builds to that schedule and you carry the site tolerance risk.
  • Coordinated openings. The factory issues an opening preparation guide, your builder builds to it, and both sides sign off the prepared openings before the doors are manufactured.

Whichever route you choose, get the prepared-opening record signed off on site before production starts. Re-making a single made-to-measure door set is cheaper than re-making six, but it still costs a shipping cycle.

3. Match the operating type to the wall, not just to the drawing

The same decorative intent can be delivered by several door types, and each one makes different demands on the wall it sits in. Within the Santerson range you can compare options across collections before locking a schedule:

Door typeWhere it worksWhat to verify with the supplier
Santerson Flush Interior DoorsStandard hinged leaves that sit flush with a finished wall faceWall build-up depth, lining detail, hinge mortising, and how the architrave-free edge meets plaster or panelling
Santerson Decorative Concealed DoorsDoors that read as part of the wall surface in villas and hotel corridorsConcealed hinge and pivot loading for the leaf size, gap setting, and whether the frame is supplied with the lining
Santerson Wooden Sliding DoorsCloakrooms, studies and pantry openings where swing clearance is lostTrack type and load rating, wall or ceiling support for the runner, pocket depth or surface-mounted reveal
Santerson Arched French DoorsFormal living volumes and reception spaces with a curved headArch radius and mullion layout, glazing specification, and how the arch head is framed into the opening
Integrated Door & PanelingConcealed doors in a clad wall, where door and panelling must share one finishWhether door, panelling and fixings are produced as one package with matched material batch

Ask the supplier to confirm, for each schedule item, that the wall type you have on site can carry the leaf weight and the hardware selected. This is the question that most often changes a detail drawing after the fact.

4. Lock finishes against physical samples, not screen images

Veneer, lacquer, melamine and wood-effect finishes all shift under different light. Australian interiors mix strong daylight with warm artificial light, and a wood tone that reads neutral in a studio photo can pull orange or grey in a north-facing room.

  • Order physical finish samples for every door colour or grain on the schedule, and view them on site against your flooring, joinery and skirting.
  • Record the finish by name and code in the order, not by photograph. Where a wood grain is specified, ask whether the veneer comes from a matched batch for the whole delivery.
  • Confirm the lacquer or laminate system and what cleaning regime the supplier recommends, so your handover manual matches how the doors are actually made.

5. Decide who supplies ironmongery, and check the loading

Decorative doors are heavy, and the hardware package is where a good door can still perform badly. For every item on the door schedule, state clearly whether Santerson or your local supplier provides hinges, pivots, handles, lock bodies, closers and strike plates. If ironmongery ships with the doors, confirm leaf weight per hinge, fire-rated or non-rated status of each fitting, and whether the finishes were ordered as one matched set.

If you intend to fit locally sourced hardware, send the cut-out and mortise dimensions to the factory before production. A door machined for one hinge pattern will not accept another without site work that is visible once painted or oiled.

6. Handle compliance questions with your own accredited consultant

Do this step locally. Door performance obligations in Australia, including any fire-rated or egress requirements, depend on the building classification, the specific path of travel and the state or territory authority having jurisdiction. Santerson's published material describes manufacturing, custom/OEM service, logistics and installation support; it is not a statement of Australian product certification. Before an order is placed, have your fire engineer, building surveyor or certifying consultant confirm what each opening requires, then hand those requirements to the supplier as written performance criteria rather than asking the factory to interpret the code for you.

7. Verify shipping terms and unpacking sequence

Santerson's logistics pages describe freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. For a door consignment, three details matter more than the freight rate:

  • Packaging method per item. Ask how leaves and frames are crated, whether edges are protected, and how glazed sets are separated from solid leaves in the container.
  • Incoterms and who clears customs. Confirm the quoted term, who prepares commercial invoices and packing lists, and who is the importer of record at the Australian port.
  • Container plan and offload sequence. Request the loading plan so doors can be unloaded in installation order. Frames installed before leaves arrive on site usually means a second trip by the installer.

Inspect every crate against the packing list within 48 hours of arrival, photograph any damage on the crate and the contents before signing release, and report shortages the same day. Late claims on a container that has already been opened on site are difficult to substantiate.

8. Get the installation sequence in writing

Santerson's service navigation lists installation and after-sales support alongside production and delivery. Before doors ship, confirm how installation is handled for your project: whether installers attend on site, whether your own joiner installs with remote guidance, or whether the two are combined. Then fix the sequence.

Interior doors should go in after wet trades have finished and floor finishes are laid, but before final painting touch-in and before heavy furniture arrives. Agree the site conditions you must provide — dry walls, settled floor levels, completed services — and agree the snag process: who inspects, what tolerance is acceptable for gaps and alignment, and how replacement items for damaged leaves are ordered.

A pre-order checklist you can send with your enquiry

  • Door schedule with item numbers, opening sizes at three points, floor finish levels and wall build-up
  • Written spec pack per item: core, face material, finish code, frame and lining detail, glazing, ironmongery package
  • Confirmation of who measures, who prepares openings and who signs off prepared openings
  • Physical finish samples approved on site, with codes recorded in the order
  • Locally confirmed performance requirements from your Australian consultant, issued as written criteria
  • Incoterms, importer of record, packaging method and container loading plan
  • Installation method, required site conditions, snag list format and replacement-parts route

See the doors in finished projects first

Santerson publishes Australian project references including villa work in Sydney, Melbourne, Perth and North Turramurra, alongside a turnkey scope that runs from design consultation and material selection through production, logistics and handover. Reviewing those cases is useful for judging finish direction and how doors sit with matched panelling and cabinetry. When you request them, ask for the door schedule and specification used on a comparable project rather than photographs alone; a documented schedule tells you far more about coordination quality than a styled interior shot.

Send one enquiry that answers all eight points above. A buyer who supplies an opening schedule, approved finish codes and locally confirmed performance criteria gets a firm price and a shorter production cycle. Start from the Decorative Interior Doors collection page, list each opening by item number, and ask the supplier to return a completed specification sheet per item before you commit to the order.