A wall-mounted display cabinet looks simple on a drawing until it arrives on site: the wall will not carry it, the recess is 40 mm out, the finish does not match the joinery beside it, and the lighting detail was never drawn. Because these cabinets are made to measure for each space, the quality of your request for quote decides how many rounds of revision the job needs. Below is the checklist we use when a buyer sends an enquiry about Santerson Wall Mounted Display Cabinets, and what each item changes in the price.

Start with the wall, not the cabinet

Wall-mounted units hang from the substrate, so the first thing a manufacturer needs is information about what they are being fixed to. Send the wall construction (stud timber framing, light-gauge steel, brick, block or reinforced concrete), the finished floor-to-ceiling height of the room, and a marked-up elevation showing where the cabinet should sit in relation to skirting, cornices, doors and switch plates.

Tell us what is behind the fixing zone. Concealed pipework, electrical conduits, structural noggins and insulation all affect whether we specify a French-cleat batten system, a concealed steel rail or a floor-support leg hidden inside the carcass. If the wall lining is plasterboard and the intended load is heavy glass shelving with ceramics or stone objects, say so at enquiry stage — that is when we add backing plates to the design rather than arguing about it after the first delivery.

Give dimensions as an opening, not a single number

Our display cabinets are supplied in made-to-measure sizes, so we work from the space you need to fill. A useful dimension set includes:

  • Overall width and height of the intended zone, plus the depth you want off the finished wall face.
  • Whether the unit is surface-mounted or recessed into a niche — for a recess, give the rough opening and the finished lining depth.
  • Where services, beams or window reveals cut across that opening, with distances from a fixed corner.
  • Adjacent fixed elements: door swings, radiator positions, ceiling downlights, the height of any countertop or sideboard below.
  • The finished floor level if the room is still being screeded, so we do not build to a level that changes by 30 mm later.

State what will be displayed and how much it weighs

Shelf spacing and shelf material follow from the objects. Books, porcelain, glassware, awards, sculptures and bottle displays each need different spans and load allowances. Tell us the item type, its approximate weight per shelf, and whether you want adjustable shelving or fixed compartments set to a specific height. For heavier items we adjust the shelf material, add intermediate supports or change the span; that decision belongs in the quotation, not on site.

Security matters as much as load. Say plainly which compartments need doors and what kind — hinged, sliding, glass-fronted or lockable — and which stay open. A glass front display cabinet reads lighter in a living room or lounge but needs gaskets, hinges rated for the door weight and a cleaning regime you are willing to keep to; a closed carcass hides clutter and costs less per metre.

Specify finish and material against a reference

Finish is where most quotes stall, because "matching the existing joinery" means nothing across an ocean. Choose from our available material and finish options — veneer, lacquer, acrylic, melamine or a painted panel — and back the choice with something we can check: a RAL or Pantone reference, a physical sample you post to our Foshan workshop, or a photograph of the surface in daylight together with its make and model code. Also state the sheen you expect (high gloss, satin, matte), since two identical colours in different sheens read as two different cabinets.

Where the cabinet has to match other built-in work in the same project — wardrobes, media walls, a sideboard — send the drawings for those items too. We produce the display cabinet on the same material batch and finishing line when it is ordered as part of the package, which is how colour consistency across a floor is actually achieved.

Deal with lighting in the enquiry, not after

If you want an illuminated display cabinet, the electrical detail has to be in the drawing we price. Specify the light position (shelf-edge, top cavity, vertical reveal or toe), colour temperature, whether the driver is hidden inside the carcass or on site, and where the switch or dimmer will sit. We then pre-wire the carcass, leave the correct tails, and tell your electrician what to connect — instead of a contractor chasing a cable through a finished cabinet two days before handover.

Where a project needs several cabinets in one building, send them as one enquiry with room-by-room schedules. Identical carcass construction across units lets us share fixings, jigs and finishing batches, which is where the real saving sits.

What our quotation will return

Once the information above is in your request for quote, we come back with shop drawings showing elevations and sections, the selected carcass and shelf construction, the fixing method for your wall type, a material and finish schedule, the lighting specification, and packaging details for the shipping method you intend to use. As a one-stop furniture and building materials supplier, we can carry the same detail through the other joinery in the project — wardrobes, media walls, vanities and panelling — so one drawing set governs all of it.

You sendIt determines
Wall build-up and fixing-zone notesCleat or rail system, need for backing plates, whether floor support is required
Rough opening plus finished lining depthCarcass size, scribe allowance, reveal detail against the wall finish
Object type and load per shelfShelf material, span, intermediate supports, adjustable or fixed shelving
RAL/Pantone code, sample or make-and-model referenceFinish batch, sheen, colour match against adjacent joinery
Lighting position and control preferenceCarcass pre-wiring, driver location, electrician's connection point
Site address and delivery terms you wantPackaging grade, crating, container loading plan and freight option

Logistics and installation details to include

Built-in cabinets are fragile in transit and awkward on site, so finish the enquiry with delivery facts: the project address, the floor and lift or stair access, whether the site is occupied, and your target handover date. Tell us your preferred terms — port, door-to-door, or delivery to a builder's hold — and we will match the crating and packing list to that route. Our furniture logistics and door-to-door delivery service covers freight forwarding by sea, air or rail with the customs paperwork, and we label every crate against the room schedule so the fitter on site knows which unit belongs where.

Finally, state who is installing. If you want our team involved through furniture installation and after-sales support, we send setting-out dimensions to your builder before the walls are closed up, so the battens and isolators arrive in the right place the first time.

Send the checklist with your next enquiry. A marked-up elevation, wall construction note, load list, finish reference and lighting preference is enough for us to return shop drawings and a firm price for wall-mounted display cabinets — and if the same project needs wardrobes, media walls or other built-in joinery, quote it as one package through our turnkey interior project solutions.