A request for quote is where a wardrobe order either becomes buildable or turns into an expensive misunderstanding. For Glass Open Wardrobes, the price you receive depends almost entirely on what you send us: opening dimensions, wall conditions, layout, materials and delivery arrangements. This guide lists exactly what a buyer should include so the quotation comes back complete, comparable and ready to approve.

Why the same design gets three different prices

Open wardrobes are made-to-measure. There is no standard unit to drop into an order sheet, so each quotation is calculated from your drawings and specification. When one buyer sends a room photo and another sends a dimensioned elevation with finish samples named, the two quotations cannot be compared at all — the second covers hardware, glass panels, wall fixings and packing that the first simply never mentioned.

Our Open Wardrobes collection is built to project-specific dimensions, layouts and finishes. That flexibility is the point, but it means the quotation follows the information. Send a complete brief and you get a firm price; send an incomplete one and you get a rough number that moves later.

1. Dimensions and site conditions

Give us the width, height and depth of every run, and say which figure is finished-wall to finished-wall. Height matters most for open wardrobes: a floor-to-ceiling run needs different support and wall fixings from a standalone unit.

  • Overall run length, height and depth, plus the thickness of any skirting, cornice or plaster buildup you want the carcass to clear.
  • Whether the unit is built into a recess, fixed against a finished wall, or free-standing in the room — this changes the structure, not just the look. If it stands alone, say which Freestanding Open Wardrobes arrangement you are working from.
  • Floor and wall finish types, so we can confirm anchorage details before production.
  • Obstructions: switches, sockets, air grilles, doors that swing into the run, uneven floors.
Send a simple sketch with measurements rather than only a photograph. A photo shows taste; a sketch shows buildability.

2. Layout and internal configuration

Tell us how the wardrobe will actually be used, bay by bay. Hanging length for long garments, shelf heights for folded stock, drawer counts, shoe and accessory zones, lighting pockets — each decision affects panel count, hardware and price.

  • Number of bays and the width you want for each.
  • Hanging versus shelving split, and whether any bay needs double hanging.
  • Drawer quantity and type, plus any pull-out accessories.
  • Display niches or illuminated sections, if the design shows them.

If your layout is still open, say so and send the room drawings. Our Interior Design Services team can return a space layout, furniture arrangement and 3D rendering before you commit to a specification.

3. Materials, finishes and glass specification

For an open wardrobe with glass elements, "glass" is not a specification. State the glass type and colour tone, the frame material and finish, and the carcass and door-adjacent panel material. Where you are comparing our Metal Frame Open Wardrobes against a timber-framed alternative, name the frame finish you expect so both quotations describe the same build.

  • Glass: clear, frosted, smoked or ribbed; tempered where the application requires it; preferred panel thickness if your designer has specified one.
  • Frame and profile: metal or timber, colour or coating, slim or standard sightline.
  • Carcass and interior panels: board type, decorative finish, edge treatment.
  • Hardware: brand or grade, soft-close requirement, handle or handleless.
  • Reference samples or product codes you have already approved on site.

Material and finish choices are exactly where custom and OEM work pays off. If you need a bespoke texture, colour match or your own branding on the components, describe it in the enquiry and we will confirm feasibility, tooling and minimum order quantity before quoting — see Custom & OEM Service.

4. Quantities, phasing and project type

State the number of units per room type and how many rooms or floors are involved. A villa owner ordering one bedroom run and a developer ordering forty identical runs need different documentation, packing and delivery plans, and the unit price follows that.

  • Quantity per type, with a room-by-room schedule where possible.
  • Whether the order is phased across site handover stages.
  • Project type and location — residential villa, apartment, hospitality or office.
  • Any approval milestones your client or consultant imposes before production release.

5. Drawings, samples and reference images

Attach what you already have: architectural floor plans, elevations, a joinery schedule, mood boards or photographs of the look you are working toward. Reference images help us understand intent; dimensioned drawings let us quote. Both together remove most of the back-and-forth.

6. Delivery, installation and after-sales terms

Be explicit about logistics in the same enquiry, because packing grade, container loading and site access all carry cost. Tell us the destination port or site address, your preferred Incoterms, whether you need door-to-door delivery, and whether installation is by your own trades or by us.

  • Delivery term and destination, including site access constraints and lift or stair limitations.
  • Installation responsibility and any snagging or inspection process you require.
  • Warranty scope you expect in writing, and spare-parts needs for phased work.
  • Target on-site date, so production can be scheduled backwards from it.

Our Logistics & Door-to-Door Delivery and Installation & After-sales Support services can be packaged with the order, or left to your local team — just say which you want priced.

What a complete enquiry looks like

ItemProvideWhy it changes the price
DimensionsWidth, height, depth per run; recess or free-standingCarcass structure, wall fixings, panel sizes
LayoutBays, hanging and shelf split, drawer countPanel count, hardware quantity
Glass and frameGlass type and tone, profile material and finishGlass grade and profile cost
Carcass finishBoard type, decorative finish, edge detailMaterial and finishing time
HardwareGrade, soft close, handle styleComponent supplier and unit rate
Quantity and phasingUnits per type, rooms, phasesBatching, packing, unit price
LogisticsIncoterms, destination, site accessPacking grade and freight
InstallationWho installs, snag process, warranty scopeService scope included in the quote

Five questions to answer before you hit send

  • Can a factory read my dimensions without calling me back?
  • Have I named the glass and frame finish, or just written "glass"?
  • Is the quantity per room type clear enough to batch production?
  • Have I stated who installs and where the goods must arrive?
  • Have I given a target on-site date rather than "asap"?

If any answer is no, add that detail first. One extra line in the enquiry routinely saves a week of clarification.

Send your brief to SANTERSON

SANTERSON manufactures made-to-measure built-in furniture and building materials for villa, hospitality and office projects, with production, custom/OEM work, logistics and site coordination under one contract. Send us your drawings, quantities and finish preferences for Built-in Furniture, and we will return a specification-level quotation rather than an estimate. For whole-apartment or whole-villa packages, our Turnkey Interior Project Solutions cover design through handover.

Talk to us about your wardrobe enquiry: santerson@qq.com · Phone/WhatsApp +86-13928214007 (PHILLIP) · Contact