A request for quote for bronze glass wardrobes usually comes back with a number that means very little. Two suppliers, two quite different prices, and no clear idea of what either one actually covers. The gap is rarely the wardrobe itself — it is the information the buyer left out. Wardrobes in this family are made to measure, so a quotation can only ever be as precise as the brief behind it.
If you are sourcing built-in wardrobes for a villa renovation, an apartment batch or a hotel room floor, the checklist below is what we ask our own project team to complete before a price is requested. Send it in the first message and the quotes that come back can be compared line by line.
Start with the opening, not the elevation
Bronze-tinted glass front panels are specified most often on sliding-door wardrobes in bedrooms, walk-in robes and hallway joinery. The tint reads warmer than clear glass and hides fingerprints and dust better than a mirror surface, which is why it keeps appearing in high-use rooms and in guest accommodation where housekeeping cycles are frequent.
Before any dimension goes into the enquiry, settle two decisions that change the price structure completely:
- Door operation. Sliding doors need a track allowance and a clear, unobstructed run along the front of the unit; hinged doors need clearance in front of the wardrobe. A glass sliding door wardrobe and a hinged version of the same cabinet are not interchangeable quotes.
- Fitted or freestanding. A built-in unit is packed out to wall, ceiling and skirting on site; a freestanding carcass arrives complete. The scribing allowance, the finishing detail and who carries that labour all sit differently in each case.
Give dimensions a factory can build from
Made-to-measure work is priced by panel area, not by a nominal "1800 mm wardrobe". For every unit in the enquiry, provide:
- Width, height and depth measured at high, middle and low points — record all three if they differ. Out-of-square walls are normal on renovation sites, not exceptions.
- The finished floor level, and whether floor coverings are already laid. Carpet or tile built up afterwards eats into a door run.
- Ceiling condition: flat, raked, corniced, or with a bulkhead. Note downlights, air grilles and light switches that fall inside the wardrobe envelope.
- Obstructions — skirting depth, architraves, door handles, radiators, pipes, power points and any pillar the carcass has to scribe around.
- Room-by-room quantity and a unit reference for each wardrobe, so a batch quote can be read line by line.
A simple dimensioned sketch removes most of the back-and-forth, even a hand drawing with measurements on it. Photographs of the wall from two angles help just as much.
Name the glass and the frame you actually want
"Bronze glass" describes a tint, not a build. In the quote request, split the specification into the parts that carry cost:
- Glass type and tint. Bronze, smoked or clear — each is available across the glass-door range, and neighbouring options such as smoked glass wardrobes are worth pricing side by side when several room types are involved.
- Glass treatment. Whether the panel is safety-graded, and whether you want a plain, ribbed or textured surface. Ribbed patterns diffuse light differently across a wide frontage.
- Framed or frameless front. An aluminium-framed glass front and an all-glass door are different assemblies, with different hardware, edge detailing and installation sequence.
- Frame finish. Bronze glass is usually paired with a dark or neutral frame; give the exact finish name rather than a colour description.
Specify the internal layout, not just the outside
The interior is where most of the usable value sits, and it is also where buyers under-specify most often. Ask for a quote against a defined internal plan:
- Number and length of hanging rails, single or double stacked.
- Drawer count and drawer type — shallow accessory drawers and deep linen drawers are priced differently.
- Open shelf zones, and whether any of them are to be lit.
- Specialist items: shoe shelving, accessory trays, valet rods, ironing boards, integrated hampers.
- Whether the layout changes between rooms. In a project batch, two bedroom types with different internals should be quoted as two configurations, not averaged into one figure.
If the layout is still open, ask for two or three internal options priced against the same external size. Comparing them at quote stage costs nothing; changing a cut panel on site does.
State the delivery, access and installation terms
When you are buying from an overseas manufacturer, the commercial terms belong in the same enquiry as the product details. Put these in writing from the start:
- Delivery basis. Say whether you want the goods quoted to port or delivered to site, and name the destination address. Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packing and container loading, so both options can be priced by the same team.
- Packaging expectation. Glass frontages travel on glazing bars or in crated vertical packs. Confirm how panels are packed and how spare panels are supplied.
- Site access. Stair width, lift dimensions, turning radius and parking all affect whether a full-height panel can be delivered intact. Flag this early — it can change panel sizing.
- Who installs. Local installer or supplier-supervised installation. If you want on-site guidance, ask for it in the quotation rather than negotiating it after delivery.
- Lead time and sequence. Give your required on-site date, and confirm which rooms come first if a batch is being phased.
What a complete enquiry looks like
A usable request for quote for bronze glass wardrobes normally contains, in one message:
- Project location, project type and the number of wardrobe units.
- Dimensioned drawings or sketches per unit, including floor and ceiling conditions.
- Door operation — sliding or hinged — and built-in or freestanding.
- Glass type, tint, treatment and frame finish.
- Internal layout per unit, with the alternatives you want priced.
- Hardware preference and any integrated lighting.
- Delivery basis, destination, site access notes and required on-site date.
- Reference images of the look you are working towards.
Suppliers price what they are told. Send that list and the returns can genuinely be read against each other, instead of being argued over after an order is placed.
How our wardrobe programme is quoted
SANTERSON has manufactured furniture and building materials for project work since 2008, and built-in wardrobes sit inside a wider fit-out range that also covers kitchen cabinetry, vanities, doors, wall panelling, lighting and flooring. Quoting wardrobes alongside the rest of a room package avoids the usual problem of three suppliers each reading the same drawing slightly differently.
For wardrobe enquiries we work from your drawings: sizing is made to measure, internal layout follows how the room is actually used, and finishes are confirmed before production starts. Our custom and OEM service covers bespoke material, finish and texture choices, so a bronze glass frontage can be matched to the frames, handles and joinery already specified for the project.
Send your drawings, unit quantities and required on-site date, and we will return an itemised quotation with internal layout options priced against the same external size.
Contact PHILLIP · Phone / WhatsApp +86-13928214007 · Email santerson@qq.com · Enquiry page