Floating modular systems look simple on a drawing: a run of wall-hung carcasses, some open shelving, a few closed units. The risk sits underneath the elevation. Load paths, substrate conditions, service runs and finish approvals are decided long before production starts, and most of them are settled in the specification stage rather than on site.
This article sets out what procurement teams should confirm before placing an order for Santerson Floating Modular Systems, and how those checks fit into a wider package when the same supplier is also providing joinery, flooring, lighting and bathroom fixtures. The examples assume a villa or hospitality project delivered internationally, where wall conditions, freight and installation responsibility all sit in different contracts.
1. Confirm the product scope before comparing prices
The Modular Living Systems collection includes more than one configuration type. Alongside floating systems, the range lists Santerson Closed Modular Units, Santerson Mixed Open & Closed Systems and Santerson Floor to Ceiling Modular Systems. Shelving is catalogued separately under Modular Shelving Systems, including Santerson Floating Modular Shelves and Santerson Metal Frame Modular Systems.
Two quotations that appear comparable often cover different scopes. Before pricing, record for each run:
- the exact catalogue page or product name the quotation refers to, and whether it is a living system or a shelving system;
- overall length, height and depth of every bay, plus which bays are open, closed or mixed;
- which items are included in the unit price: back panels, shelves, drawers, doors, interior lighting, plinths, brackets and face frames;
- what is excluded: on-site making-up, architraves, scribe cuts, local wall repairs and any structural packing.
2. Fix the wall condition question early
A floating system transfers its weight and the weight of its contents into the wall behind it. That single fact generates most of the disputes on real projects, because the party responsible for the substrate is rarely the party manufacturing the cabinetry.
- Substrate and fixings. Establish what the finished wall build-up will be at the time of installation: masonry, framed studwork with lining, plasterboard, timber battening or an existing finished surface. Ask the manufacturer to state the fixing method and bracket type they require for that build-up, and who supplies the structural framing or backing plates.
- Level and plane. Floating runs reveal every deviation in a wall. Agree tolerance limits for flatness and verticality, and decide who carries the cost of packing, scribing or re-plastering when the site falls outside them.
- Load duty. State what each bay is expected to carry: books and ceramics, media equipment, wet-adjacent storage, or display items. Shelf spans and shelf-pin centres should follow that duty rather than a default catalogue layout.
3. Do not let services arrive after the carcasses do
Integrated lighting and media runs turn a joinery item into an electrical one. Where the design includes interior lighting, cable routes or equipment ventilation, settle these before production:
- which party provides and installs the transformers, drivers and isolators, and where they will be accessible for maintenance;
- the position of every outlet, data point and cable penetration, dimensioned on the joinery drawing rather than the electrical drawing alone;
- heat and ventilation provision behind enclosed bays that house equipment;
- who signs off the completed connection locally, since the manufacturer's scope usually stops at supplied components.
Where a project also specifies Santerson Integrated Lighting Systems or Santerson Integrated Cabinet Lighting, cross-check the two drawing sets against each other. Mismatched driver locations are a common and entirely avoidable site variation.
4. Specify finishes as physical approvals, not names
A finish name in an email is not a specification. Veneer matched across a run of doors, a lacquered panel and adjacent wall panelling will only read as one system if the samples were approved together.
- Approve physical samples for each surface: veneer or laminate grain direction, lacquer sheen level, edge banding, hardware finish and glass tint.
- Record the approved sample reference on the production drawing, with the date and the person who signed it.
- Order all bays of one run in a single production batch. Reorders made weeks later can vary in veneer cut and lacquer sheen even when the specified name is identical.
- Keep one approved sample after shipment; it is the only reliable reference during handover inspection.
5. Check how a made-to-measure order behaves in transit
These systems ship as componentised panels, and damaged or mis-labelled panels cannot be replaced quickly on an overseas schedule. Procurement teams should ask for the packing approach before the order is released:
| Item to confirm | Why it matters |
|---|---|
| Pack list keyed to bay numbers | Installers can lay out each bay against the drawing instead of identifying panels by size. |
| Panel protection and edge protection | Floating carcass edges and lacquered faces show transport damage first. |
| Container loading plan | Long panels must not be loaded against heavier joinery or stone items in a mixed container. |
| Documentation set | Commercial invoice, packing list and origin documents should match the pack list exactly to avoid clearance delays. |
| Spare hardware allowance | Pins, hinges, brackets and handles are cheap to include and expensive to ship separately. |
SANTERSON's logistics service covers freight forwarding, customs paperwork, packaging and container loading through to door-to-door delivery. The commercial terms still need confirming project by project: Incoterms, the named delivery point, insurance cover and who unloads and moves crates to the floor. Assuming a delivery extends further than the agreed term is one of the most frequent causes of disputed variation costs.
6. Define installation responsibility in writing
Floating systems are unforgiving if installed out of plane. Decide before order confirmation who performs the fixing and finishing, and what handover inspection looks like:
- Whether on-site installation is provided by the supplier or carried out by local trades under supervision, and which drawings each party works from.
- The sequence relative to other trades: painting and floor finishes complete, services first fix approved, then joinery installed.
- A snag list signed at handover covering alignment, door and drawer adjustment, fixing security and finish damage, with the remedy agreed for each item.
- What after-sales support covers in practice: which components are supported, for how long, and how replacement parts reach site.
7. Buying as one package reduces coordination risk
Floating modular systems rarely stand alone. In a villa or hotel room they sit against wall panelling, under ceiling lines, next to wardrobes and opposite media walls. When those items come from different suppliers, tolerance decisions get made on site by whoever arrives first.
A single manufacturer covering joinery, built-in storage, wall and ceiling finishes, flooring and bathroom fixtures keeps those interfaces inside one drawing set and one production programme. As part of SANTERSON turnkey solutions, the same team handles design consultation, material selection, manufacturing, project coordination and installation support across the package. For buyers assembling several rooms at once, that structure is also what makes custom built-in kitchen cabinets, boutique style walk in wardrobes and floating modular runs match one another in veneer and hardware.
Pre-order checklist
- Product scope identified by catalogue page, with included and excluded items listed.
- Wall build-up, fixing method, backing provision and flatness tolerance agreed and signed.
- Load duty stated per bay; shelf spans set accordingly.
- Lighting, cable routes, driver positions and equipment ventilation resolved on the joinery drawing.
- Physical finish samples approved and referenced on production drawings; one run produced as one batch.
- Pack list, panel protection, loading plan and shipping documents confirmed before release.
- Incoterms, delivery point, unloading responsibility and installation party stated in the order.
- Handover snag process and after-sales support terms recorded before shipment.
Questions to send with your enquiry
Can you state a load rating for the floating carcass and shelves?
Ask for the duty per bay and the fixing requirement for your specific wall build-up. Published catalogue pages describe made-to-measure sizing and finish options rather than published load figures, so request the value for your configuration in writing.
What happens if the site wall is out of tolerance?
Agree a tolerance band and a remedy in advance: scribing, packing, or a shadow gap detail. Fixing this on paper costs little; fixing it after delivery becomes a variation.
Can the floating system be matched to existing joinery?
Provide approved samples or physical references for veneer, lacquer sheen and hardware. Matching by written colour name alone carries real variation risk across batches.
Who installs, and who supports defects after handover?
Get the installation party, warranty scope and replacement-part process into the order documents rather than a sales email. Site conditions and local trade availability differ by country, so confirm both for your delivery location.
Send your elevation drawings, wall build-up notes and finish references to SANTERSON's project team, and request a specification review against the checklist above before the order is released. As a China-based furniture and building materials manufacturer, SANTERSON supplies floating modular systems alongside joinery, flooring, lighting and bathroom fixtures for villa, hospitality and office projects.