A wall-mounted sideboard looks simple on a drawing: one floating cabinet, one clean shadow gap, one run of concealed storage. On site it is one of the hardest pieces of joinery to get right, because nothing touches the floor to absorb an error. The fixing line has to be straight, the wall has to carry the load, the doors have to clear the worktop below, and the finish has to match cabinetry made in a different batch. If any of those inputs is missing, the unit arrives correct and still does not fit.
At SANTERSON these units are made to measure rather than ordered off a shelf. Our Santerson Wall Mounted Sideboards are configured per project: dimensions, layout, material and finish are all specified by the buyer or their designer before production starts. The list below is the set of measurements and project inputs we ask for so a quotation, a drawing and an installed unit agree with each other.
Start With the Wall, Not the Cabinet
Before any cabinet dimension matters, the supporting structure does. A wall-mounted sideboard transfers its own weight plus the weight of contents, glassware and countertop items into the wall behind it, so we need to know what is behind the finish.
- Wall build-up: masonry, concrete, light-gauge steel with board cladding, or timber stud with plasterboard. This decides whether a batten frame, a concealed steel backing or a solid substrate is needed, and where blocking must be set out.
- Flatness and squareness of the run: the maximum deviation across the full length, measured with a laser line rather than a tape. A long scribe to hide a bow reads badly once concealed lighting is on.
- Finished floor level and finished ceiling level at both ends of the run, so height can be dimensioned from a datum instead of from an assumed floor.
- Setting-out datum: which wall face is the reference line, and how far the unit projects from it. This drives corridor clearances and door swings.
The Measurements That Define the Unit
These are the dimensions we need on the drawing. Where a number is still open, say so and give the range — an honest range produces a better quotation than an invented figure.
| Input | What to specify | Why it changes the build |
|---|---|---|
| Overall length, height, depth | Finished external size in millimetres, from datum lines | Sets carcass modules, transport packaging and whether the run is built in sections |
| Mounting height | Underside level above finished floor, and top level | Determines load path, fixing detail and how the unit reads against the worktop below |
| Projection from wall | Carcase depth plus door thickness and any countertop overhang | Affects circulation, seating clearance and handle or pull specification |
| Door and drawer layout | Number of doors, drawer stacks, open niches, appliance voids | Drives hinge type, drawer runner length and minimum carcass heights per module |
| Door swing and clearance | Adjacent walls, table edges, chair backs, switch plates | Prevents doors fouling a surface in daily use; decides handleless or handle detail |
| Countertop interface | Whether a stone top sits on the unit, its thickness and its edge return | Adds dead load to the wall fixing and changes the top rail detail |
| Integrated lighting | Niche positions, cable routes, driver access point, switching | Requires cut-outs and ventilation set out in production, not cut on site |
Project Inputs Beyond Dimensions
How the piece will be used
Storage for glassware needs different internal fitout than a buffet run holding tableware, or a bar section with a coffee machine on the top. Tell us what goes in and on the unit; we then set shelf spans, drawer widths and load-bearing hardware accordingly.
Finish matching and adjacent work
Sideboards rarely sit alone. Where the unit must match handleless minimalist kitchen cabinets, a run of panelling or a concealed door in the same wall, send the reference — a drawing number, an existing sample, or the product page for the matching line. Veneer direction, sheen level and edge detailing are decided against that reference, and matched panels are produced in one batch.
Services and lighting
Where concealed light is required in niches or under the unit, we need to know early. Integrated cabinet lighting affects carcass depth, cable routing and where a driver sits for later access. Electrical ratings and installation requirements are confirmed with the final configuration.
Site sequence and access
Give us the install date, which trades precede joinery, lift dimensions or stair access on the upper floors, and who will fix to the wall. A long sideboard that cannot reach the room through a lift or stairwell is delivered in sections and assembled in place — decided at order stage, not on delivery day.
How This Fits Our Process
SANTERSON works as a manufacturer and one-stop supplier for villa, hospitality and office projects, supplying furniture and building materials from the same factory. For a sideboard inside a wider fit-out, we coordinate it with the cabinetry, panelling, doors and lighting around it, so finishes and reveals carry across the wall instead of being ordered from four suppliers. The steps are the ones listed on our services pages: project brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up, with door-to-door delivery, installation support and after-sales service available.
A completed example of this wall-level coordination is our Dark Wood Minimalist Home project, where a wall-mounted sideboard with double-layer floating shelves was designed together with the stone worktop, concealed lighting and the adjoining tea room joinery.
A Short Checklist to Send With an Enquiry
- Room, wall and a marked-up elevation showing the intended run
- Overall length, height, depth, mounting height — in millimetres, from a stated datum
- Wall construction and where backing or blocking is already present
- Internal layout: doors, drawers, niches, appliance voids
- Countertop on or off, thickness and overhang
- Lighting positions, switching and driver access
- Finish reference to match, plus the project country and install window
Send the measurements and drawings you already have — even incomplete ones. We will review them with the wall condition and use case, then come back with a configuration and a quotation for the sideboards and the surrounding joinery in one package.