A full height storage wall looks simple on a drawing and fails on site for predictable reasons: an unrecorded floor height, a service run nobody measured, a door swing that was never drawn. Before we build one for your project, here is the measurement set and the decision list we work from when we specify Santerson Full Height Storage Walls.
Why a storage wall needs more inputs than a wardrobe
A freestanding unit can be swapped if the opening is wrong. A full height storage wall runs from floor to ceiling, so every error becomes fixed: an out-of-level slab shows as a taper along the top reveal, and a shallow wall kills the carcass depth you specified. The wall also carries several different jobs at once, closed cupboards, open display niches for objects, drawer banks for smaller items, sometimes media storage behind or beside a screen.
Santerson Full Height Storage Walls sits in our Integrated Storage Walls collection and is made to measure, with the layout, dimensions, materials and finishes set per project. That flexibility only pays off if the inputs arrive complete. The list below is what we ask architects, contractors and developers to send.
Measurements to take before a quotation is realistic
- Finished floor to finished ceiling height, at both ends and in the middle of the run. Slabs are rarely level. Three readings tell us whether the top of the wall needs a scribe, a shadow gap or an upstand, and how much of the height goes into the built-in furniture rather than the cabinetry.
- Overall run length plus the width of every bay you want closed, open or left empty. Give us the widths as a chain along the wall rather than one total figure.
- Room depth at the top and bottom of the run. A 50 mm variance changes whether sliding fronts can clear each other.
- Obstructions: skirting, architraves, radiators, downlights, air grilles, switches, thermostat, sprinkler heads, curtain boxes. Photograph them with a tape in frame.
- Service positions: power and data outlets, TV position and cable route, any integrated lighting feed. For media walls we need the screen size, mounting method and where the connections land.
- Adjacent finishes and how the wall should meet them, flush, recessed or with a shadow gap.
- Door and circulation clearances in front of the wall, including any door that swings across it.
Send drawings in DWG or PDF with dimensions marked on plan and elevation. If the space is still a shell, say so plainly; we will flag what cannot be confirmed yet instead of guessing.
Decisions to make alongside the measurements
The open-to-closed ratio. Count what you actually keep within reach: books, glassware, linen, luggage, day bags. Closed fronts hide clutter and hold their look over years of hotel or family use; Santerson Open Display Niches carry the objects you want on show, and niches are where integrated lighting earns its keep. We usually suggest fixing this ratio per bay rather than for the whole wall.
The front system. Hinged doors need clearance in front of them. Sliding fronts save that clearance and read as a wall when closed, which is why Santerson Sliding Storage Panels work well in rooms with a tight circulation path. Handleless fronts change the reveal detail and the hardware, so decide early.
The interior fit. Adjustable shelving handles books and boxes; drawer units suit smaller items; tall bays take hanging storage. Tell us what goes in each bay and we set shelf heights around it rather than at a default pitch.
Materials and finishes. Substrate, front finish, edge detail and hardware are specified per project, matched to the joinery, wall panelling and flooring around them. Send the surrounding finishes early so the storage wall does not arrive as a separate language.
On dimensions, materials, hardware and finish performance: the figures that matter are the ones for your configuration. We confirm those in writing against the approved shop drawing before production, rather than publishing generic numbers that may not match what you install.
How the information moves through the project
Our workflow runs consultation, design and planning, production, logistics, installation and after-sales. For a storage wall this means: your measurements and brief come in, we return a layout with elevations and a quotation, you confirm details, then we manufacture and coordinate door-to-door delivery to site, with installation guidance on hand. As a China-based furniture and building materials manufacturer working on villas, hospitality and office projects, we usually build the storage wall alongside the rest of the built-in joinery, which keeps reveals, finishes and hardware consistent across the job.
Where a project needs bespoke sizes, textures or branding, our custom and OEM service covers prototyping and finish development. Where several apartments or villas repeat, we work from one approved prototype and replicate the configuration bay by bay.
A short checklist before you send an enquiry
- Three floor-to-ceiling heights along the run, plus total length and per-bay widths.
- Room depth at top and bottom of the run.
- Photos of obstructions with a tape visible.
- Positions for power, data, screen and any integrated lighting.
- What each bay stores, and your preferred open-to-closed split.
- Front type: hinged, sliding or handleless.
- Surrounding finishes, samples or references.
- Delivery location, access constraints and install programme.
Send those inputs and we will come back with a layout, elevations and a quotation for your wall. Tell us the room dimensions, what each bay needs to hold, and how far the fronts must clear each other, and we can specify Santerson Full Height Storage Walls around your space. Enquiries reach our team through the contact page.