A swim spa specification is only useful to a buyer once it can be checked against the site. Before we quote the Outdoor Swim Spa WS-S08T1 / WS-S08T2, we ask project owners, contractors and designers for a short set of measurements and inputs: the clear opening at the delivery route, the finished footprint on the deck or in the ground, the electrical supply available, and how the spa will be used. The model pair sits in our configurable outdoor swim and hydrotherapy range, so the same enquiry also decides which equipment is included and which is optional.
Start With the Catalogue Footprint, Then Add Working Space
The catalogue lists both models at 7800 mm long, 2200 mm wide and 1500 mm high. Treat those numbers as the shell, not as the space you must provide. On site you need to plan three separate dimensions:
- Delivery path. Measure door widths, gate openings, lift or stair clearances and the turning radius at corners along the route from the truck to the final position. A spa that fits the pad can still fail at a side gate.
- Finished footprint. Allow room around the shell for steps, for the control and equipment access side, and for cleaning the cabinet exterior.
- Structural support. A filled shell of this size is a heavy point load. The slab, deck frame or recessed plinth must be designed by the local structural engineer for the actual installed weight, not estimated from the product page.
Tell us whether the unit will sit above ground on a deck or pad, be partly recessed into a plinth, or be sunk with the rim at finished floor level. Recessed work changes drainage, ventilation to the equipment side and access for service, so we need the section drawing before production.
Confirm Which Model Variant You Are Ordering
The listing covers WS-S08T1 and WS-S08T2 as one catalogue entry, and both share the 7800 x 2200 x 1500 mm shell. The differences between the variants sit in how the spa is set up and equipped, so we confirm the variant against your use case rather than assuming it from a model number. Send us the intended use and we will match it to the correct variant on the quotation.
Inputs That Define the Equipment Package
The following are shown for this listing in the catalogue. We list them so you can compare them with what your project actually needs, and confirm each item line by line on the order.
| Catalogue item | Shown for WS-S08T1 / WS-S08T2 |
|---|---|
| Overall dimensions | 7800 x 2200 x 1500 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pumps | 2 pcs |
| Filter pump | 1 pc |
| Jets | 50 pcs total |
| Lighting | 4 LED lights plus 28 small LED lights |
| Total power shown | 9.55 kW |
| Features shown | Water jets, LED lighting, ozone, swim training system |
The 9.55 kW figure is the total power shown for the configuration in the catalogue. Your installed load will differ once a heat pump, additional pumps or other options are added, so we reconcile that number with your supply before wiring is designed.
Electrical and Supply Information We Need
- Supply voltage, phase and frequency at the spa location, plus the available breaker and cable size.
- Where the isolator and consumer unit will sit relative to the spa, and who is responsible for final wiring and protection.
- Whether you want a heat pump for year-round water temperature, and what target water temperature you expect in your climate.
- Water fill source, drain location and whether an overflow or skimmer arrangement suits the surrounding finish.
Options to Decide at Enquiry Stage
Catalogue-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each option against the selected configuration before ordering rather than treating it as standard. Insulation and a heat pump matter most where the spa is used outside warm months; UV sterilization and sand filtration change the maintenance routine your facility team will follow.
Use Case Drives the Layout Brief
The swim training system and the jet count point to two different daily routines, and both can be served by this shell. A household or villa owner who swims laps in the morning and uses the jets in the evening sends us a different brief from a resort or clubhouse that runs scheduled sessions with several bathers at once. For hospitality and multi-unit residential work we also need:
- Expected bather count and daily operating hours, which affects filtration duty and maintenance intervals.
- Plant room or equipment access route for the facility team, and whether they need training on handover.
- Finishes around the spa, since coping, decking and steps are set out together with the spa dimensions.
Where a standard rectangular shell cannot follow the architecture, our Customizable Shape Outdoor Spa covers square, round, oval and curved hydrotherapy basins on an acrylic shell with structural reinforcement. We review those projects from your drawings rather than a catalogue code.
Send the Whole Package With Your Enquiry
A complete enquiry shortens the quotation cycle and avoids rework in production. Attach or state:
- Site plan and section showing the spa position, access route and finished levels.
- Delivery route measurements from the kerb to the final position.
- Electrical details as listed above.
- The option list you want priced, plus any finish or cladding preference for the cabinet exterior.
- Project location and the delivery terms you are working to.
As a China-based manufacturer of furniture and building materials, we handle swim spas as part of a wider project package, so the same team can also supply surrounding outdoor furniture and finishes. Our Swimming Pools and Swim Spas range covers other shells, from compact plunge and hydrotherapy basins to long swim channels, which is useful when one project needs different sizes at villa, clubhouse and gym levels. We also provide custom and OEM work, door-to-door logistics and installation support; we confirm scope, lead time and terms for your specific site in writing.
Send us your measurements and use case. Email santerson@qq.com or contact us on WhatsApp +86-13928214007 (PHILLIP) with your site plan, access route and supply details. We will return a configuration sheet for WS-S08T1 or WS-S08T2 that matches the dimensions and equipment your project can actually install.