Why the Input List Matters Before a Single Panel Is Cut

A two-tone kitchen scheme looks simple on a rendering and complicated on site. Black panels against light grey reveal every uneven wall, every out-of-square corner and every appliance that was never dimensioned. Because our Black & Light Grey L-Shaped Kitchen Cabinets are made to order rather than assembled from stock modules, the quality of the finished installation is decided long before production starts — by the measurements and project inputs your team sends us.

This guide sets out exactly what we need from architects, builders, developers and procurement teams to quote and manufacture an L-shaped kitchen run with confidence: which dimensions are mandatory, which appliance details change the cabinet carcass, which finish decisions must be locked early, and how those inputs fit into our design, production and delivery workflow.

1. The Room Envelope: What to Measure First

An L-shaped run occupies two walls that meet at a corner, so the envelope survey controls everything downstream. Please supply the following for each kitchen or kitchenette in the project, taken from the finished surface levels rather than the structural slab.

InputHow to take itWhy it matters
Running length of each legFinished wall face to finished wall face, measured at both ends of the wall as well as the middleWalls are rarely parallel. Three readings show whether the corner is out of square and where a scribe or filler panel is needed.
Clear height to ceiling or soffitFinished floor to the lowest obstruction, at the start, middle and end of each legDetermines whether tall units can run full height, and where a bulkhead, duct or beam cuts in.
Corner geometryThe internal angle at the corner, plus the depth of the return on both sidesSets the corner carcass size and decides whether the corner is storage, worktop continuation or an appliance housing.
Positions of doors, windows and openingsFinished dimensions from each opening edge to the corner and to the adjacent wall endsSwing paths and window reveals limit where tall cabinets, hobs and sinks can sit.
Services locationsCentres and heights of water inlet, waste outlet, gas point, electrical outlets, switchboards and any extractor ductCarcass drilling and appliance housings are prepared in the factory; relocated services mean on-site modification.
Existing or planned floor and wall finishesThickness of the wall finish and the finished floor level relative to the sub-slabOur dimensions assume the levels you confirm. Plasterboard, tiling and screed thickness change the clear run length.

If a survey drawing exists, send it even when incomplete — a marked-up plan with photographs is more useful to our engineers than a clean rendering without dimensions.

2. Layout and Working Triangle Inputs

The L layout works because the wash, prepare and cook zones sit in a clear sequence along the two legs. Tell us how you intend to use the kitchen, since the zoning decision changes carcass heights, worktop continuity and storage mix.

  • Zone order on each leg. Confirm which leg carries the sink and which carries the hob and oven, and whether the corner between them stays clear as a preparation zone.
  • Worktop depth and thickness. Give the required depth for each run, including any extended breakfast bar or drop edge, plus your preferred worktop material so we can detail the support and upstand.
  • Appliance type by position. State whether each appliance is built-in, integrated or freestanding. Built-in ovens and a stacked oven arrangement need ventilated housings of specific internal dimensions, and a built-in refrigerator needs its door opening direction declared.
  • Tall unit allocation. Decide which tall units are pantry, which are appliance towers and which house the oven stack. This is the single biggest driver of the elevation drawing.
  • Display or closed storage. A glass display cabinet with warm LED lighting changes both the carcass specification and the electrical feed; decide early whether one leg carries glazing.

3. Storage Brief: Internal Fittings to Specify Room by Room

Internal partitions, drawer stacks and pull-out fittings are built into the carcass at the factory, so the storage brief belongs in the enquiry, not in a change order after production has begun. For each position, tell us:

  • The mix of drawers, shelves and pull-out trays, and which items the user stores there — tableware, pots, dry goods, small appliances or linen.
  • Whether corner access should use a carousel, pull-out racks or hinged doors with shelving, since each needs a different carcass width.
  • Appliance garages or pocket-door cupboards that hide countertop equipment, including the internal height needed for the tallest item.
  • Hardware expectations: hinge and drawer-slide type, soft-closing where required, handleless grooves or profile handles, and leg heights for plinths. Our custom built-in kitchen cabinets are supplied with matching hinges, drawer slide rails, support legs and connecting brackets on request, so hardware can be specified per project.
  • Any accessibility requirement — lowered worktop heights, pull-down rails or clear floor space beneath a unit.

4. Finish and Colour Inputs for a Two-Tone Scheme

Two-tone cabinetry is unforgiving of late decisions. Black flat panels against light grey flat panels put the colour break at eye level, where differences in sheen and grain direction are obvious under site lighting.

Decide which surfaces carry which colour

Send a simple elevation with each run labelled dark or light, including tall units, the plinth, the insides of any open shelving and the glass cabinet frames. Where the two colours meet at the corner, tell us whether the break should read as continuous or stepped.

Fix the surface finish before sampling

Matte, high gloss, acrylic, lacquer, melamine and wood veneer all behave differently under the same lamp. State the finish family for each colour, then confirm sheen level from a physical sample. Panel pages such as our two-tone wood and white modern kitchen cabinets show how a warm grain and a pale panel are paired; use those references to communicate the contrast you want rather than describing it in words alone.

Confirm the surrounding finishes

Worktop, splashback and flooring samples should travel with the cabinet sample. The product page for this model describes a marble stone backsplash as waterproof, oil-proof and easy to clean; if you are supplying that surface from another trade, send its thickness and edge detail so we can coordinate the joint.

5. Lighting, Electrical and Glass Display Details

Where a glass display cabinet with built-in warm LED lighting is part of the design, three inputs must reach us together: the location of the transformer or driver, the switching arrangement, and whether the feed is inside the carcass or in the wall behind it. Cabinet-integrated lighting wired after installation leaves visible cable runs, so we route and drill the carcass during manufacture once these details are confirmed. If you also want feature lighting on open shelving or under wall units, list those positions on the same drawing.

6. Project Context Inputs That Change the Specification

The same L-shaped plan is specified differently for a private villa, a serviced apartment and a boutique hotel kitchen. Include in your enquiry:

Project inputVilla or apartmentBoutique hotel or hospitality
Quantity of identical unitsOne-off layout, full design freedomRepeated layouts; we standardise the carcass and vary only the finish
User profileResidential cooking habitsStaff use, housekeeping, higher wear on handles and edges
Maintenance briefOwner preferenceCleaning regime; drives choice of panel surface and edge detailing
Approval processHomeowner sign-offArchitect, operator and brand-standard approvals; allow sample-review time
Site access for deliveryNormal residential accessLift sizes, service lifts and delivery windows affect how cabinets are packed and sub-assembled

For hospitality work we also supply the wider interior fixture package around the kitchen — vanities, wardrobes, wall panelling, doors and lighting — which is why many project teams treat us as a single hospitality furniture and building materials supplier instead of placing separate orders per trade.

7. How Your Inputs Move Through Our Process

SANTERSON has been manufacturing furniture and building materials in China since 2008, supplying project customers internationally. The workflow below is the one we run on cabinet enquiries, and it shows where each input you send is used.

  • Consultation. We review your drawings, quantities and target programme, then list the gaps that block an accurate quotation.
  • Design and planning. Our team prepares layouts and elevations against your dimensions and confirms storage, appliance and finish selections with you before anything is cut.
  • Production. Panels are machined to the approved drawings, carcasses drilled for services and hardware, and finishes applied to the approved sample. Quality control checks dimensions at each stage.
  • Logistics. Cabinets are packed for the site access you have described, with freight arranged by sea, air or rail and the shipping paperwork prepared. Confirm import terms, duties and delivery scope for your country with us in writing before dispatch.
  • Installation and after-sales. On-site installation support, inspection of snags, spare parts and maintenance guidance are available; agree the scope that applies to your project at contract stage rather than assuming a fixed service level.

Project references on our site include villa and apartment work in Willoughby, Perth, North Turramurra, Melbourne and Sydney. Scope and specification details for each case are available on request — we do not present any single project as a template for another.

8. A Practical Submission Checklist

Send the following in one enquiry and we can return a quotation with a drawing set rather than a price range:

  • Scaled plan of each kitchen, showing both legs of the L, openings and services.
  • Three-point measurements per wall and clear height readings.
  • Elevations marked with tall-unit positions and appliance types.
  • Storage brief by position, including corner-access preference.
  • Colour and finish allocation for every surface, plus the sheen you expect.
  • Lighting schedule for glass cabinets and integrated lighting.
  • Worktop and splashback material, thickness and edge detail.
  • Quantities per unit type, required delivery window and destination.

Where an input is genuinely unknown, say so on the drawing. We will propose a workable default and flag it for your confirmation instead of guessing silently — that single habit prevents most site problems on two-tone cabinetry.

Send us your drawings

Share your plan, measurements and finish direction and our team will return layouts and a quotation for review. Enquiries are answered within 24 hours during business days, Monday to Saturday, 8:00 AM to 6:00 PM GMT+8. Contact PHILLIP on +86-13928214007 (phone or WhatsApp), email santerson@qq.com, or use our contact page. Browse the wider range in kitchen cabinets and hotel appliances to see comparable layouts before you specify.

Frequently Asked Questions

What if my walls are not square?

Send the three readings per wall rather than a single average. We design the end units with a scribe allowance so the run lines up on site, and we tell you which leg carries the adjustment before production.

Can I order one L-shaped set for a single villa kitchen?

Yes. Single-unit residential kitchens and repeated apartment layouts are both handled as made-to-order work; the difference is how many drawings need approval and whether we standardise the carcass across units.

Do you supply the worktop and splashback with the cabinets?

Tell us what you intend for those surfaces at enquiry stage. We coordinate the support structure, upstand and joint detail around them, and can include stone or engineered surfaces in the package when the project calls for it.

What happens if site levels change after production starts?

Confirm finished floor and wall levels before we release the drawings to the factory. If a level changes later, tell us immediately: adjustable plinth legs absorb small movement, while a reduced clear length may need a revised end unit.