A wardrobe quotation is rarely one number. The price of a built-in wardrobe follows from the wall it sits in, the height it reaches, the door system you choose and the way the inside is divided. That is why a supplier who receives only a room name usually replies with questions instead of a price. This guide lists what we need to quote Textured Melamine Wardrobes, and what happens at each step once that information is in place.

1. The opening, the wall and the ceiling condition

Send the internal dimensions of the space the wardrobe has to fill: width, depth and floor-to-ceiling height, measured at a few points rather than one. Old buildings rarely give you the same measurement twice, and out-of-square walls change how the carcass is scribed and packed on site. Tell us what the wall is made of — masonry, stud partition, plasterboard over battens — because that decides the fixing method and whether a batten or service wall has to be built first.

Also mention anything in the way: skirting boards, architraves, radiators, pipework, light switches, air-conditioning grilles, ceiling cornices or a sloping soffit. Even a few centimetres of variation across a run of three doors is enough to change the whole elevation.

2. Drawings, even rough ones

A floor plan with the wardrobe position marked is useful; a set of elevations is better. If you have architectural drawings, send them in PDF or DWG. If you do not, hand-drawn elevations with dimensions, plus photographs of the wall from straight on and from each end, let us check sight lines, door swings and where returns meet adjacent joinery. For villa and apartment work that includes other built-in items — wardrobes, vanities, media walls, kitchen cabinetry — send them together so the finishes and shadow gaps are coordinated across rooms instead of decided room by room.

3. Size, layout and how the inside is used

Our built-in furniture is made to measure, so there is no standard size to fit to. What we need is a short description of how the wardrobe will be used, which then converts into an internal layout:

  • Hanging areas: long-hang for coats and dresses, single-hang or double-hang for shirts and folded stacks.
  • Shelf count and shelf spacing, including whether shelves need to be adjustable.
  • Drawers, pull-out trays, laundry hampers, trouser racks, shoe shelving, jewellery trays.
  • Open display sections, niches or glass-fronted bays versus fully closed doors.
  • Lighting: door-activated interior lights, recessed strips in open bays, or wiring left for the electrician.
  • End panels, pediments, pelmets and whether the unit is flush with the wall or framed.

Tell us which rooms the units are for. A guest-room wardrobe and a main bedroom used every day justify different internal spend, and a shared laundry or utility cupboard needs different fittings again.

4. Door type and opening clearance

The door system has a large effect on price and on the usable depth of the wardrobe, so it needs to be settled before we quote.

Door systemWhat we need from you
Sliding doorsClear run length, ceiling height, and confirmation that a 100 mm track zone and the overlap of the panels are acceptable. Sliding doors save floor space but reduce accessible depth.
Hinged doorsApproach distance in front of the wardrobe, position of beds and furniture, handle or push-open preference, and whether the doors meet a corner or another wall.
Folding doorsOpening width and track support requirements.
Open or partially openWhich bays stay open, frame profile and finish for the exposed edges.

If you are weighing melamine against other wardrobe finishes, send the comparison you are working from. We also produce Matte Lacquer Wardrobes and Glass Sliding Door Wardrobes, so the same room can be quoted with more than one front and compared line by line.

5. Finish, texture and edge detail

"Textured" covers a wide range of surfaces, so please be specific about what you want the panel to look and feel like. A sample reference helps more than an adjective: send a colour code, a photograph of a board you like, or a physical sample if one exists in your project library. Useful details are the grain direction, the level of sheen, whether the texture wraps around the edges, and how the edge banding should read — flush, slightly rounded, or a visible contrast line.

Also confirm what the finish has to sit next to: flooring, wall panelling, curtains, ironmongery and lighting. Our Wood Grain Melamine Wardrobes are frequently specified where a wardrobe has to match flooring or door joinery, and Solid Color Melamine Wardrobes where the unit is meant to disappear into a painted wall. Send the flooring and paint references you are working with and we can match or deliberately contrast.

6. Substrate, hardware and any project requirement

For each unit we confirm the board make-up behind the decorative face, the drawer and hinge hardware to be used, and the load rating for shelves that will carry heavy items. If the specification names particular brands or hardware systems, list them; if it is silent, tell us the expected level of use and budget band and we will propose a build.

For hotels, serviced apartments and multi-unit residential work, add the project documentation that shapes production: room schedules with unit counts per type, any fire or performance requirement written into the specification, branding or signage requirements, and whether units need to be identical across repeated rooms. Repeated room types are produced from one approved layout, which is where the cost control sits.

7. Site access, delivery and installation

Tell us where the finished units have to travel: lift dimensions, stair widths, corridor turns, floor level, parking restrictions, and whether work has to happen outside resident hours. Large one-piece side panels are often the reason a wardrobe is built in sections instead, so this information belongs in the enquiry rather than in a later email.

State who installs. We handle installation and after-sales support as part of project delivery, including inspection and handover, but some contracts place installation with a local contractor — in that case we send units packed to a sequence that matches the room schedule, with fixing details and assembly information for the fitter.

8. Programme and delivery destination

Give us the date the wardrobe must be in place, working backwards from handover, plus the delivery address and the terms you want quoted: port or door-to-door, and who acts as importer of record. Site programmes for fit-out trades are tight, so we schedule production against your installation window rather than an assumed one.

9. What you receive back, and the approval step

With the above in hand, a first reply contains an itemised quotation by room or unit type, with the build specification stated on each line — panel make-up, door system, hardware, finishes and any extras such as internal lighting. Where drawings exist we return marked elevations so you can see what each priced line refers to.

Before production we ask for a signed-off drawing set and a finish approval, and for made-to-measure work a site re-check of the openings. That confirmation step is where dimensions and selected specifications are locked; changes after it are the single most common cause of delay, so review the elevations with the trades that touch the same wall — electricians, plasterers, flooring.

Quick enquiry checklist: internal dimensions at several points · wall construction · drawings or photographs of the wall · room-by-room internal layout · door system and clearance in front · finish reference and edge detail · substrate and hardware requirements · project documents for multi-unit work · site access route · installation responsibility · required on-site date, delivery address and Incoterms.

Send what you already have — even an unfinished plan and a few photographs — and we will tell you which gaps still block a firm price. Starting the enquiry with the wall condition, the door system and the finish reference is usually enough to turn a first reply into a quotation rather than another round of questions.