A media unit with lighting built into the carcass is not one purchase, it is several: joinery, glazing or panelling, the lighting itself and the electrical work that feeds it. That is exactly why a supplier cannot price Santerson Integrated LED Media Units from a photograph and a room name. The information you send in the first message usually decides whether the quotation comes back quickly or after several rounds of drawings.
Below is the practical brief our project team works from for built-in media joinery, written so a buyer, builder or interior designer can assemble it once and reuse it across villas, apartments and hospitality rooms. Everything here follows what we actually publish on our product and service pages; where a specification has to be confirmed per project, we say so instead of quoting a number.
Why integrated lighting changes the enquiry
A standard cabinet is quoted as a box: panels, edges, hardware, finish. Once LED strips sit inside shelves, niches and reveal channels, the unit also carries a lighting layout, a driver location, cable routes and a switching point. Each of those has to be resolved before the carcass is drawn, because a channel cut for a strip in a standard shelf is not something you can correct after the panel has been machined.
That is why our product listing states that finish, layout and dimensions are specified to suit each space, and asks buyers to confirm lighting and electrical details for the selected design. It is not hedging — it is the honest sequence. The same applies across the wider range: Santerson Full Height Media Walls and Santerson Glass Front Media Units are listed the same way, because configurable systems are quoted from drawings, not from a catalogue code. The related Floating TV Units collection follows the same rule: made-to-measure sizing, material and finish options, and a layout tailored to the project.
The eight items a supplier needs before quoting
| Item | What to send | Why it moves the price |
|---|---|---|
| Room and wall dimensions | Width, height and depth of the wall; ceiling height; skirting or cornice detail; position of switches, sockets and radiators | Determines carcass size, whether the unit is floor-mounted, wall-hung or full-height, and how much packing to uneven walls is needed |
| Screen type and mounting | Screen size, weight where known, fixed or articulating bracket, cable drop position | Sets the reinforcement plate, bracket pocket and ventilation gap behind the panel |
| Layout of open and closed storage | How many shelves, drawers, doors, display niches; what you actually store there | Drawers and soft-close hardware cost more per unit than open shelving; the mix is the biggest single swing in the quote |
| Finish and material | Door face material, finish sheen, edge treatment, colour or veneer reference, matching items elsewhere in the property | Veneer, lacquer, acrylic and melamine follow different production routes, so the finishing cost differs with each |
| Glass and door specification | Glass type and thickness where glazing is used, frame colour, handle or handleless detail, safety requirements | Glass fronts, frames and hardware are quoted separately from the carcass; safety glazing is a project decision |
| Lighting layout | Which shelves and niches are lit, warm or cool white preference, dimming requirement, switch or sensor location, driver access point | Number of lit runs, drivers and control gear drive the lighting line item; access to a failed driver has to be designed in |
| Services and existing conditions | Where power and low-voltage feeds will come from, whether the wall is stud or masonry, site photographs | Determines chases, backing and whether on-site electrical work must be arranged before installation |
| Quantity, destination and access | Number of units, delivery address, floor and lift or stair access, preferred delivery window | Affects packing method, container loading, freight mode and the installation plan |
Send drawings if you have them; send photographs if you do not
A marked-up elevation with dimensions is enough to start. If there are no drawings yet, three clear photographs of the wall — straight on, from each side, and one showing the floor-to-ceiling condition — plus a tape measurement of width and height let us produce a first proposal and layout options for you to react to. Our interior design service covers space layout planning, furniture layouts and 3D visual renderings, so a scheme can be developed from that starting point rather than waiting for a full drawing set.
How the order actually runs
Our published cooperation steps are simple: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. On the service side we describe a six-stage workflow — consultation, design and planning, production, logistics, installation and after-sales. For buyers coordinating furniture sourcing for Australian projects, that same sequence applies whether the order is one media wall or a whole villa package.
The stage most buyers underestimate is detail confirmation. For an integrated LED media unit this is where the lighting circuit is drawn onto the elevation, where the driver is given a reachable position, and where the ventilation gap behind the screen is fixed on paper. Sign it off once and production runs cleanly; skip it and you are changing machined panels. Because these units are made to measure, the electrical specification forms part of that sign-off rather than an option added after the panels are cut.
What we handle in one package
Media joinery rarely travels alone. In a villa or apartment fit-out it sits beside wardrobes, kitchen cabinetry, vanities and wall panelling from the same schedule, and matching those finishes across rooms is where a single supplier earns their place. Our custom and OEM service covers bespoke material, finish and texture choices alongside custom furniture design and prototyping, so the media wall, the bedroom wardrobe next to it and the kitchen cabinetry down the hall can be specified from one finish schedule.
Freight is quoted with the joinery rather than bolted on later. Our logistics service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Transit times, duties and Incoterms differ by destination and change with freight markets, so we confirm those for your specific port and order size instead of publishing a rate that will be wrong next quarter.
Common reasons a quotation comes back wrong
- A height without a ceiling condition. A unit drawn to 2400 mm means something different under a flat plaster ceiling than under a raked ceiling or one with a cornice and cove light.
- "With lighting" but no layout. Two lit niches and eleven lit shelves are different products; the driver count follows the runs.
- No screen information. A 55-inch panel on a fixed bracket and an 85-inch panel on an articulating arm need different reinforcement and different clearance behind the panel.
- Finish named by feeling. "Matte grey" has no cost until it becomes a board material, a sheen and a reference we can match again for the second batch.
- Access not mentioned. A full-height unit that has to be carried up a narrow stair is packed and subdivided differently from one that goes straight into a ground-floor lobby.
A short checklist before you send the enquiry
- Wall width, height, depth of return; ceiling type and height
- Screen size, weight if known, bracket type, cable drop position
- Storage mix: open shelves, drawers, closed doors, display niches
- Door face material and finish reference, plus anything it must match
- Glass or panel type where used, frame colour, handle detail
- Lit zones, colour temperature, dimming, switch or sensor position, driver access
- Who supplies the mains feed and does the on-site electrical work
- Quantity, delivery address, floor and access route, target date on site
If you can send the wall dimensions, the screen size and one sentence about what you want stored there, we can come back with a layout and a first figure. Everything else we can settle together during detail confirmation.
Send your media wall brief to SANTERSON. We are a China-based manufacturer and one-stop supplier of furniture and building materials, working on villa, hospitality and office projects since 2008. Share dimensions, drawings or photographs and we will return a layout proposal with a quotation for the joinery, glazing and integrated lighting as one line item.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Enquiry page