Why a Wall System Cannot Be Priced From a Photo Alone
A full-height storage wall is not a catalogue item that arrives in one standard size. It is a made-to-measure assembly of carcasses, doors, shelves, display niches and finishes built around one specific wall in one specific room. That is exactly why the product page for Santerson Full Height Storage Walls lists configurable material, finish and layout options instead of a single price, and why we always ask for project details before issuing a quotation.
The difference between a rough guess and an accurate number is the quality of the information you send us. Send room dimensions, a layout sketch, a finish reference and a delivery address, and one enquiry round is usually enough to produce a usable quotation. Send only a reference photograph, and the first reply will be a set of questions rather than a price. The checklist below is the same list our project team works from, so you can prepare your enquiry in one pass.
1. The Wall Itself: Dimensions and Site Conditions
Give us the physical envelope before anything else. For each wall we need the overall length and the floor-to-ceiling height, plus the position of every fixed obstruction. Skirting boards, architraves, radiator pipes, air-conditioning grilles, light switches, power outlets, thermostat panels and uneven plaster all change how a carcass is scribed, cut or notched on site.
- Overall run length and finished ceiling height, measured at several points along the wall rather than one spot.
- Floor finish build-up: whether the screed or flooring in front of the wall is already laid, and to what level.
- Obstruction schedule with heights from floor and from ceiling for outlets, switches, grilles and pipes.
- Wall construction (masonry, stud partition, concrete) so the fixing method can be specified and checked against the weight of a fully loaded tall unit.
- Room photographs from both ends of the run, plus one straight-on shot, taken in daylight.
If the wall is part of a new build, tell us which stage the shell has reached. Fit-out sequence matters: a wall built to a nominal dimension before plastering may finish several millimetres smaller, and that tolerance has to be designed in rather than corrected on site.
2. Layout: What Goes In, What Stays Open
Tell us how the wall will actually be used, room by room. Hanging clothes need a rail height; books need shelf spans set to the load they will carry; glassware needs shelving with adequate clearance; a television needs a recess with service space and a cable route behind it. Send a simple plan or elevation sketch with the zones marked, even a hand drawing scanned on a phone is enough to start.
Most projects mix open and closed storage rather than choosing one. A Santerson Mixed Open & Closed Storage wall keeps everyday items behind doors and leaves display shelving open, which is the usual answer in a living room or study. Where media equipment sits inside the wall, Santerson Integrated Media Storage covers that zone of the system, while Santerson Full Height Media Walls is the reference for a wall organised around the screen itself. For a purely decorative band of shelving, specify Santerson Open Display Niches with the niche widths and depths you want. In every case the layout, dimensions and finish are set to your space, so what you send us determines how closely the quotation matches the finished wall.
For each zone, note: item type, approximate quantity, the tallest and the deepest single item to be stored, and whether doors should hide it or leave it visible. Also state what must not go in the wall, such as tall luggage or a vacuum cleaner that has to stand on the floor beside it.
3. Materials, Finishes and Hardware
Our Custom & OEM Service covers bespoke finishes and textures as well as standard ones, so send the finish you are working to: a laminate or veneer code, a paint colour reference, a sample photograph, or a physical sample already on site. Where a wall must match existing joinery, say so explicitly and include a photograph of that joinery, because grain direction and sheen level have to be matched rather than approximated.
- Carcass material and the door front material separately; they are often specified differently.
- Edge treatment: matching edge banding, mitred wrap or a visible joint.
- Door style: hinged, sliding, pocket, folding or handleless, and which side the hinges should open on.
- Hardware you expect us to supply: soft-close hinges, drawer runners, push-to-open or integrated pull profiles. If hardware is sourced locally instead, tell us so the cutouts and clearances are prepared for it.
- Interior fittings: trouser pulls, pull-out baskets, adjustable shelving, lighting inside niches.
If you intend to light the interior of the wall, raise it at enquiry stage rather than after production. Recessed channels and cable routes are prepared during manufacture, so a Santerson Integrated Cabinet Lighting detail has to be coordinated with the carcass depth and shelf positions. Electrical specification, covering driver location, transformer access, local supply voltage and switching arrangement, belongs in the same drawing set as the joinery.
4. Drawings and Specification Clauses to Attach
Any documentation you already hold shortens the process. A dimensioned architectural plan or an interior designer's elevation for the room lets us check our layout against the rest of the fit-out instead of guessing. If your project specification declares performance requirements, such as fire behaviour, moisture resistance in a wet room or formaldehyde emission class for board, quote the wording as written. We then confirm which board and finish options answer that clause before pricing, rather than after production has started.
| Document | Why it matters for the quotation |
|---|---|
| Dimensioned floor plan and wall elevations | Confirms run lengths, ceiling heights and how the wall meets adjoining joinery and openings. |
| Finish schedule or sample reference | Fixes door and carcass colours so pricing is not reopened after approval. |
| Equipment list for media zones | Sizes the recess, sets the clearances needed around equipment and locates cable routes and sockets. |
| Project specification clauses | Identifies declared performance requirements, so board and hardware selection is settled before the price rather than after. |
| Photographs of the site | Reveals level deviations, skirting, cornices and other details drawings often omit. |
If you do not have drawings yet, our Interior Design Services cover space planning, furniture layouts and 3D renderings before production begins, so the layout can be developed and approved from your measurements and photographs.
5. Quantities, Site Access and Delivery
State how many walls are involved and whether they repeat. Identical units across apartments or guest rooms price differently from one-off bespoke runs, and repeating modules let us standardise carcass sizes instead of cutting each one to a unique dimension. Then give us the practical delivery picture: tall panels are constrained by the building, not by the truck.
- Service address, floor level, lift dimensions and stair width where the lift is too small for a full-height panel.
- Whether the wall arrives as one assembled unit or in sections that are joined on site.
- The delivery window your programme requires, and any site access restrictions or working-hour limits.
- Incoterms you want quoted, so freight, duties and local delivery responsibility are stated in the offer rather than assumed.
Our logistics scope covers freight forwarding by sea, air and rail, export paperwork, packaging and container loading through to door-to-door delivery. Tell us the destination port or address and we will quote the transport option alongside the joinery. If your team installs on site, say so and we will send assembly drawings with sequencing notes; if you need installation support, state that in the enquiry so it is included in the offer.
6. Common Gaps That Delay a Quotation
In practice, three omissions cause most of the back-and-forth. First, ceiling height given as a nominal figure instead of a measured one: full-height units are built to the low point of the room, not the design drawing. Second, finish specified by appearance ("matte grey") without a reference code, which produces a sample round that could have been avoided. Third, media or electrical requirements mentioned only after the layout is fixed, which forces a redraw.
A practical tip: send your measurements as a simple sketch with dimensions marked on three sides of the wall (length, then height at left, centre and right) and photograph any obstruction with a tape measure visible in the frame. That single step removes most follow-up questions.
A Short Enquiry Checklist
- Wall length and measured floor-to-ceiling heights at several points.
- Obstruction schedule: sockets, switches, grilles, pipes, skirting, cornices.
- Room photographs plus a rough zoning sketch of open and closed sections.
- Item types and quantities to be stored, including the tallest and the deepest single items.
- Carcass and door finishes with references or samples; edge and hardware preferences.
- Media equipment list, cable routes and any interior lighting requirement, including where the driver and switch will sit.
- Number of walls, whether they repeat, and the project stage.
- Delivery address, lift and stair access, required delivery window, preferred Incoterms.
Send Us What You Have
You do not need a complete technical package to start. A measured wall, a photograph of the room and a sentence about how the wall will be used are enough for us to propose a layout, indicate which configuration suits it and price it properly. As one source for joinery, kitchen cabinets, doors, wall panelling, lighting and flooring, we coordinate the storage wall with the rest of the fit-out so finishes, heights and reveals match across the project instead of being reconciled on site.
Send your dimensions, photographs and finish references to the SANTERSON project team, and we will come back with a layout proposal and an itemised quotation for your wall system.