A swim spa quote is rarely a single number. For a configured model such as our Outdoor Swim Spa WS-S08CT, the price depends on the shell size you can site, the equipment that actually goes into the cabinet, the options you want fitted, and how far the unit has to travel. The more of that you send in your first enquiry, the closer the first quotation will be to the final one.
Start with the shell and the space it has to fit
The catalogue footprint for this model is 8000 × 2400 × 1420 mm. Send us the length, width and depth of your terrace, deck, poolside pad or plant room, together with a photo or a simple dimensioned sketch, and note anything that restricts access: gates, stairs, turning radii, overhead beams or the width of the widest doorway the unit has to pass through. A swim spa that fits the finished location but cannot reach it is a very expensive problem, so access is part of the quotation, not an afterthought.
Tell us whether the unit will sit fully above ground, be partly recessed, or be installed into a deck structure. Recessed and semi-recessed work changes the access panel arrangement, the insulation package and the step detail, and each of those line items moves the price.
Confirm the equipment you are buying
The standard configuration shown for the Outdoor Swim Spa WS-S08CT covers the items a quotation has to price one by one:
- One control system
- One swim training system, which is what turns the shell into a lap-swim unit
- One water pump and one filter pump
- 35 jets in total
- Six LED lights
- Total power of 8.35 kW for the configuration shown in the catalogue
Alongside the list, tell us how you intend to use the water. Daily lap training, hydrotherapy and massage, children's play, or a resort or villa amenity that runs long hours all drive different choices on jet layout, the swim training unit and how hard the filtration cycle works. If you are matching an older machine or a designer's drawing, send the drawing; we would rather match it than guess.
Send your power supply before we quote energy
Total power for the specification above is 8.35 kW. That figure only becomes a workable quotation when we know what is on site: supply voltage, phase (single or three), available circuit capacity, the distance from the distribution board, and whether an electrician will run a dedicated circuit. Please also state the earthing and protection arrangements your local installer will provide. We build to the specification you confirm; we do not assume your local electrical rules, and your installer or engineer remains responsible for on-site compliance.
Tell us your running expectations as well. A spa used ten minutes a day and one used several hours a day in a cold climate need different answers on insulation and heating, and we will quote them differently.
Pick the options that belong in your build
Catalogue-listed options for this range include additional control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each option is a separate price and a separate lead time, so please mark what you want included in the first quotation and what you might add later. Heaters and insulation packages in particular are far cheaper to include in the factory build than to retrofit on site.
Delivery terms change the number more than buyers expect
An 8000 mm shell moves differently from a small spa. We arrange export packing, container loading, freight and documentation as part of our logistics and door-to-door delivery service, but we still need your destination port or site address, the delivery terms you want to buy on, and whether a crane, tail-lift or forklift is needed at the receiving end. Any site constraints for unloading should be in the first message, not discovered on delivery day.
Project buyers should add their programme: the date the water feature has to be operational, any handover milestones, and whether the swim spa is part of a wider package. Ordering it alongside the rest of your swimming pools and swim spas, outdoor furniture and interior fixtures lets us consolidate shipments and keep one specification, one production schedule and one point of contact.
What else to attach to the enquiry
- Quantity, and whether later phases will repeat the same unit
- Country and nearest port or delivery address
- Site photographs, level information and the deck or pad construction
- Your electrical supply details, as above
- The option list you want priced, and anything you want excluded
- Required on-site date and any brand or finish requirements
What you should get back
A quotation that can be compared line by line should show the configuration and option list in writing, the equipment breakdown, the packing and freight terms, the production lead time and the payment terms. If any of those are missing, ask for them before you compare suppliers. Where a catalogue figure and a finished build can differ, we state which applies to your configuration rather than quoting a rounded number that later needs revising.
Send your dimensions, site photos and power details to us and we will confirm the equipment, options and delivery cost for your project.