An outdoor swim spa is not a shelf item you simply pick a model number for and pay. Before we can put a real number on paper for the 8-metre unit, we need to know how it will be sited, powered, heated and maintained. Below is the exact information pack that lets us turn an enquiry about Outdoor Swim Spa WS-PC08ST into a firm, comparable quotation rather than a rough estimate.
Start with the site: dimensions, access and structure
The catalogue entry for this model lists a shell of 8000 × 2400 × 1470 mm. Send us a plan or sketch of the terrace, rooftop, garden deck or plant room where it will sit, with the finished level marked, and tell us whether you want it fully above ground, partially recessed, or sunk into a deck with an overflow edge. Those three options need very different civil works, so the choice changes the quotation more than any accessory does.
We also need the delivery route: gate widths, turning space, overhead cables, stair or lift dimensions for rooftop jobs, and how close a truck can get. A unit of this length frequently needs a crane or a long-arm forklift on the second floor and above, and that line item is easy to miss until it becomes an emergency on site.
Confirm the model variant you are actually comparing
Within the same family the catalogue also lists WS-PC08ST-L, a longer version, plus WS-PC08T and WS-PC08U. If you are comparing several of these side by side, say so in the enquiry. We will quote on one consistent basis across the shortlist — same shell thickness, same insulation package, same pump set — so that the price differences reflect real specification differences instead of different assumptions.
For reference, here is what the catalogue page for this model shows. Treat it as a starting point, not as a fixed configuration:
| Model | WS-PC08ST |
| Catalogue dimensions | 8000 × 2400 × 1470 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Filter pump | 1 pc |
| Jet total | 6 pcs |
| LED lights | 4 |
| Total power shown in catalogue | 6.55 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
The water pump is not listed with a quantity on that page, and total power depends entirely on which heater and heat pump end up in the build. Please do not size your electrical supply from the catalogue figure alone — we will send a confirmed load schedule once the configuration is fixed.
Water treatment, heating and insulation choices
Ozone is shown as standard on this model. Tell us whether you also want UV sterilisation, sand filtration, a heat pump, or an additional water pump, because all of these are catalogue options whose availability differs between models. If the spa will run through a cold season, insulation and cover details matter for running cost, so mention your climate and how many months a year you expect to use it.
A useful shortcut: send us your target water temperature, the ambient winter minimum at the site, and whether the unit will be used daily or a few times a week. With those three answers we can recommend an insulation and heating package instead of quoting every option and letting you guess.
Power, plumbing and local requirements
Please state the supply available at the site: single or three phase, voltage, frequency, and the distance from the distribution board to the spa. Electrical work on a permanently installed swim spa normally sits with the local contractor, so we will confirm the load and let your electrician handle the connection and any permits. The same applies to drainage, overflow and any plant-room ventilation — tell us what your local installer is responsible for, and we will scope our side of the boundary clearly.
Project context, quantities and delivery
Quantity and project type change the paperwork as much as the price. A single villa unit and a hotel or resort block with several units are quoted and shipped differently. If you are furnishing a wider scheme — poolside loungers, cabana daybeds, outdoor dining sets, bathroom fit-out, cabinetry — we can group those into one turnkey package and coordinate them as a single delivery. As a China-based furniture and building materials manufacturer, we handle production, packing, container loading and freight through our own project team.
For the shipment itself, send us: destination port or site address, preferred Incoterms, target on-site date, and any import documentation your customs broker requires. Our logistics and door-to-door delivery service covers sea, air and rail freight with the commercial paperwork; we will confirm terms and transit for your specific destination rather than quoting a generic lead time.
Send these six items and we can quote properly
- Model or shortlist of models, with the intended use (villa, resort, fitness, therapy).
- Site plan or photos, plus installation style: above ground, semi-recessed or sunken.
- Delivery route details and access constraints for a unit roughly eight metres long.
- Electrical supply at site: phase, voltage, frequency, cable run length.
- Chosen options: heat pump, UV, sand filtration, extra pumps, insulation, steps, cover.
- Quantity, destination, Incoterms and target on-site date.
With that pack in hand we come back with an itemised quotation, a confirmed load schedule and a packing list, so you can compare us against other suppliers on the same basis. If you are still deciding between configurations, send what you have and we will mark the open questions for you — contact our project team to start.