A quotation for glossy finish melamine wardrobes is only as accurate as the information supplied with the enquiry. Because these wardrobes are made to measure, a supplier cannot price a single unit from a photograph or a room name alone. The list below covers what we ask for on residential and project enquiries, why each item matters, and what you receive back at each stage.

Why the Request for Quotation Needs Drawings, Not Just Dimensions

Glossy finish melamine wardrobes sit in our Built-in furniture range. Each set is built to the dimensions of the opening it fills, so wall lengths, floor levels and ceiling heights are all measured against your actual site. Two rooms with the same floor area can need very different carcass sizes once skirting, architraves, cornices, beams or recessed niches are taken into account.

A dimension sketch is enough to start a conversation. A set of room drawings lets us produce a quotation you can compare against other trades, because it fixes the wardrobe footprint, door type and internal layout at the same time. If you have architectural or joinery drawings from your designer or builder, send those; if not, a hand-measured sketch with labelled wall lengths is acceptable.

The Core Details We Ask For

1. Room and opening dimensions

  • Length of each wall the wardrobe runs along, plus the depth available from wall to circulation line.
  • Floor-to-ceiling height, and whether the unit should reach the ceiling or stop below it.
  • Position of doors, windows, radiators, switches, power points and any pillar or bulkhead that cuts into the run.
  • Floor finish and its thickness if the wardrobe base needs to sit flush with tiling, timber or carpet.

2. Layout and door type

Tell us whether you want hinged doors, sliding doors, an open display arrangement or a walk-in plan, and how many sections the run should be divided into. Door type changes both hardware and clearance requirements, so it belongs in the first enquiry rather than at the production stage. If you are unsure, describe how the room is used and we will propose a layout.

3. Internal configuration

Send your hanging preferences: long hanging, double hanging rails, shelf heights, drawers, pull-out baskets, trouser racks, lighting inside the carcass, or space reserved for an ironing board or vacuum. Internal fittings are priced per item, so a room-by-room list produces a firm figure instead of an allowance.

4. Finish and panel specification

For this range, specify the surface you want on the doors and carcass. Glossy melamine is the starting point; the same collection also includes matte finish melamine wardrobes and wood grain melamine wardrobes, which is useful when bedrooms mix a high-shine front with warmer neutral panels. State the colour or pattern reference, and note whether edges, internal surfaces and any matching tall cabinet or sideboard should carry the same finish.

5. Quantity, site address and delivery terms

  • Number of wardrobe sets per unit, and the number of units or rooms in the project.
  • Delivery address and who receives the goods on site.
  • Whether you need door-to-door delivery to the site or collection at a port, so we can quote the right freight arrangement.

Information That Improves Accuracy for Multi-Unit Projects

For apartment blocks, villa developments and hospitality fit-outs, send the unit mix alongside the dimensions. A project with three repeating bedroom types needs one confirmed specification per type, not one averaged specification. Repeating layouts let us standardise carcass sizes across units, which is where cost control usually comes from.

For these enquiries it also helps to include the room schedule or fixture schedule from your design team, any finish palette already fixed for other joinery in the building, and the installation sequence you are working to. We supply wardrobes as part of wider fit-outs together with built-in furniture such as media walls, tall cabinets and vanities, so aligning specifications early avoids duplicated site measurements.

What a Complete Enquiry Produces at Each Stage

StageWhat we need from youWhat you receive
Indicative quotationApproximate run length, door type, number of sets, destinationA price range for budgeting, with the assumptions listed
Detailed quotationMeasured dimensions or drawings, internal layout list, finish referenceItemised pricing by set and by fitting, plus confirmed specifications
Production confirmationSigned-off drawings and specification sheetManufacturing order with locked sizes, finishes and quantities
Delivery and installationSite access details and receiving contactPackaged shipment with documentation, then on-site installation and inspection

Common Gaps That Delay a Quotation

  • A room name without measurements — "master bedroom" tells us nothing about the run length.
  • A finish described by mood rather than reference, such as "high gloss white", with no colour code to confirm against.
  • Internal fittings left open, which turns a firm price into an allowance that changes later.
  • Site conditions not mentioned: uneven floors, low ceilings, plasterboard that cannot carry a wall-hung rail, or restricted lift access for long panels.
  • Delivery expectations unclear, so freight is quoted on the wrong basis.
Where site conditions are uncertain, we ask for a set of photographs and a short video walk-through of the room before finalising sizes. This takes minutes on your side and removes most of the measurement questions that otherwise delay production.

A Checklist to Attach to Your Enquiry

  • Measured sketch or drawings for every wardrobe location
  • Door type and number of sections per run
  • Internal fitting list per set
  • Finish reference for doors, carcass and edges
  • Quantity of sets and units involved
  • Delivery address, receiving contact and delivery basis
  • Photographs of the room, including corners and ceiling line
  • Target programme date for delivery on site

Send what you have; we will confirm what is missing in writing rather than guess. As a China-based manufacturer of furniture and building materials operating since 2008, SANTERSON handles wardrobe production within the same project workflow as our other interior fixtures, under custom and OEM service for bespoke sizes, finishes and layouts. If your enquiry covers a whole villa or multi-unit development, we can coordinate wardrobes alongside the rest of the joinery and furniture and building materials on one specification.

Email your drawings, finish reference and quantities to santerson@qq.com, or contact PHILLIP on +86-13928214007 (phone and WhatsApp). We reply with the outstanding questions first, then a detailed quotation built on confirmed specifications.