Every door line on our site is made to measure, with material and finish options selected per project. That flexibility is the point — and it is also where orders go wrong. The list below covers what we need in writing before a Santerson Decorative Interior Doors order enters production, so the drawing you approve is the door that arrives.
Why finish confirmation matters more on made-to-measure doors
Our Windows and Doors range — hinged, sliding, pocket, folding, French and concealed — is built to project-specific dimensions rather than stock sizes. A stocked door can be returned; a made-to-measure door with the wrong sheen, the wrong grain direction or the wrong hinge preparation becomes a site problem you cannot solve by reordering one unit.
The product pages describe this range in deliberately broad terms: made-to-measure sizing, material and finish options, layout tailored to the project. They do not carry a fixed specification sheet, because the specification is yours. Confirming it is a procurement step, not an afterthought.
1. The substrate behind the finish
Two doors can share a colour name and behave completely differently in use, because the surface layer is what you see and what wears. Tell us which of these you are specifying:
- Wood veneer — a real timber face, so grain figure and colour variation run through the elevation. Our veneer doors sit alongside our veneer wardrobes and cabinetry where a project repeats the same species across rooms.
- Lacquer — a painted finish in matte or high gloss. Gloss shows fingerprints and every flatness defect in the wall behind it; matte hides handling marks but is less reflective under low light.
- Melamine / laminated panel — consistent colour across a large order, with no grain variation to reconcile.
Glazed doors are a separate decision. Clear, frosted, bronze, smoked or ribbed glass, framed or frameless, is specified in the same way as a solid leaf: send us the glazing type and the frame finish you want, and confirm which face of the glass you want visible from each room.
For villa and hospitality work we normally match the door surface to the joinery already in the building. If your cabinetry comes from us, that matching happens inside one production run. If it does not, send us a physical sample of the cabinet front rather than a photograph — screen-calibrated colour is not a specification.
2. Sheen, texture and grain direction
Please confirm these details for every elevation:
| Detail | What to specify |
|---|---|
| Sheen level | Matte, satin or high gloss — and whether the same sheen applies to the frame and architrave as to the leaf. |
| Grain direction | Vertical or horizontal on veneer elevations; state it per opening so a run of doors reads as one composition. |
| Grain matching | Whether adjacent leaves in a pair should be book-matched, mirror-matched or run continuously. |
| Edge treatment | Wrapped, solid-matched or pencil-rounded edges on veneer leaves; edge banding is visible at close range. |
| Panel profile | Flat panel, shaker-style or decorative moulded panelling — and the depth of any routed detail. |
3. Flush, concealed and handleless details
The doors that look simplest carry the most coordination. A Santerson Flush Interior Doors elevation, a decorative concealed door or a handleless concealed door depends on the wall build as much as the leaf.
- Wall build-up and total thickness — send the section drawing. Concealed frames must sit at the right depth for the plasterboard, insulation and render you are building.
- Flush alignment side — which face of the door sits flush with which wall, on every opening.
- Opening direction and handing — left or right, inward or outward, per opening, marked on the plan.
- Handle strategy — recessed pull, edge pull, push mechanism or a handle specified by your designer. Handleless elevations need the pocket position agreed before the leaf is machined.
- Finish continuity into panelling — where a door disappears into a wall, we produce the adjacent panels in the same material and finish so the seam is the only break.
4. Hardware you expect us to supply, and hardware you are supplying
Confirm the split of responsibility early. For each opening, tell us:
- Hinges — brand, model, finish, and whether concealed or surface-mounted; weight rating for tall or wide leaves.
- Locks and latches — privacy, passage or utility cylinder preparation, plus the strike plate finish.
- Door closers, dampers or magnetic catches, if any.
- Sliding and pocket hardware — track type, load rating, whether the track is recessed into the floor or surface-mounted, and the wall cavity depth the pocket cassette requires.
- Anything you are sourcing locally — send us its datasheet so we machine to it rather than guess.
Where you have a preferred hardware brand for the project, send the technical sheet. We prepare hinges, lock bodies and closers to that datasheet, which avoids a joiner on site re-cutting a finished leaf.
5. Dimensions, thresholds and the openings they sit in
Send opening sizes as finished-floor-to-finished-ceiling and finished-wall-to-finished-wall, not structural shell dimensions. Note the floor covering thickness at each threshold, whether the door must clear a rug, a tile lip or a drainage channel, and any skirting or architrave that has to be returned around the frame.
Where a room uses several door types from the same range — hinged on one wall, sliding on another — confirm each opening separately. Our Santerson Flush Sliding Doors and standard hinged lines can share a finish, but they need completely different openings, tracks and clearance.
For tall openings, tell us the leaf height you want and we will confirm hinge configuration and any needed reinforcement for that size rather than assume a standard arrangement carries the weight.
6. How these doors reach site
Doors travel badly when they are an afterthought in a container plan, so we treat them as part of the same shipment as the rest of the fit-out. Our Furniture Logistics and Door-to-door Delivery service covers freight by sea, air and rail, packaging and container loading, customs paperwork and tracking to site.
For doors specifically, ask us to confirm before booking the container:
- Packaging method — flat-packed leaves with edge protection, or assembled frame-and-leaf units.
- Labeling against your door schedule, so each crate matches a marked opening on site.
- Delivery sequence — doors arriving after the wall build is complete but before flooring goes down.
7. Finish samples and installation
For multi-unit work we recommend an approved finish sample before the full run: a small panel in the selected material, sheen and grain direction, signed off against your joinery under site lighting. That single step removes most of the disputes described above.
Our Furniture Installation and After-sales Support service covers on-site installation, inspection and snag resolution, spare parts and ongoing maintenance. If your own crew is fitting the doors, request our fixing details and frame-setting tolerances for the selected system before the walls are closed up.
A short enquiry template that works
If you send these six items, we can price accurately and start production without a second round of questions:
- Door schedule: opening reference, size, handing, swing direction.
- Material and finish per line — substrate, colour or species, sheen, grain direction.
- Hardware list with datasheets, plus what you are supplying yourself.
- Wall section at each door type, including finished floor levels.
- Whether the door must match existing or planned joinery, with a physical sample if so.
- Site address, delivery sequence and who is installing.
Related ranges worth specifying together
Projects that order decorative doors from us usually specify the surrounding joinery in the same material at the same time. Santerson Wood Veneer Hinged Doors pair with veneer wardrobes and cabinetry; concealed doors pair with wall panelling so the opening disappears into the elevation; sliding and pocket doors let a bedroom or study close without consuming swing space. Ordering them as one package keeps material batches, finishes and delivery dates aligned.
Product pages state made-to-measure sizing with material and finish options; the exact materials, hardware systems, tolerances and finish samples available for your order are confirmed project by project. Please verify dimensions and selected specifications against your drawings before production begins.
Send us your door schedule
Share the opening list, finish references and hardware datasheets for your villa, hotel or apartment project. We will return a specification sheet, an approval sample plan and a quotation covering production, delivery to site and installation support.
Contact SANTERSON — Custom Furniture Materials and Finishes — Windows and Doors range