A vanity mirror looks finished the moment its lights go on, and that is exactly where many bathroom budgets leak. The fitting you specify decides whether the person at the counter sees an even, usable face light or a shadowed one with glare bouncing off the glass. For contractors, designers and procurement teams ordering for villas, hotels and multi-unit residential work, vanity lighting is rarely bought on its own: it has to agree with the mirror, the cabinet, the countertop, the electrical rough-in and the switch plan. The checklist below follows the order we recommend our project clients work through, from fixture type at the start of the drawings to the documentation you need before a purchase order is raised.
1. Fixture type: where the light actually sits
Start with position, not style. The three arrangements behave very differently on a face:
- Sconces at mirror height, either side of the glass - light reaches the face from both sides, so shadows under the brows, nose and chin stay soft. This is the arrangement that works best for grooming and for hotel guest rooms where guests do not adjust anything.
- A horizontal bar or strip above the mirror - easier to coordinate with a wide mirror or a row of mirrors, but a high single source throws shadows downward unless the fitting directs light forward as well as up and down.
- Integrated lighting in the mirror or cabinet itself - a built-in such as our LED mirror cabinet puts the source exactly where the designer drew it, which removes one coordination step between trades.
On a long shared counter, two matching sconces usually read better than one wide fitting, and they let each basin have its own light. On a compact powder room, one well-aimed fitting above the glass is often enough. Decide this while the mirror position is still movable on the drawings, because the outlet boxes follow it.
2. Output, colour temperature and colour rendering
Three numbers do most of the work, and all three should be written into the specification rather than left to whatever the supplier has in stock:
| Item | What to write down | Why it matters at the counter |
|---|---|---|
| Lumen output per fitting | Total lumens for the fixture, and how many fittings share one mirror | Tells you whether the face is lit adequately without resorting to an over-bright single source |
| Colour temperature (K) | One value for the whole bathroom or floor, matched to the rest of the lighting scheme | Mixed temperatures across mirror, ceiling and cabinet lights make a new fit-out look piecemeal |
| Colour rendering (CRI) | A stated minimum in the specification | Skin tone, tile colour, grout and timber vanity finishes all read truer when rendering is high |
If a fitting is dimmable, confirm which driver and which control it is compatible with before the electrical package is issued. A dimming problem discovered on site usually means changing both the fitting and the switch plate.
3. Glare control and mirror reflection
A bright bare source reflected in the glass is the most common complaint after handover. Check for a shade, diffuser or lens that hides the light-emitting part from anyone standing at the counter, and check where the fitting falls relative to the mirror's top edge. Decorative pieces can solve this while adding character. The Modern Splash Mirror Wall Lamp surrounds a central mirror with a sculptural transparent frame and warm LED light, so the source is diffused rather than exposed, and the fitting becomes the feature rather than an accessory. For plainer schemes, the Modern Sculptural White Wall Lamp uses a wide cone shade that throws soft light up and down the wall, which keeps the mirror itself free of direct reflections.
4. Bathroom suitability and electrical details
This is the section most often left blank on a purchase order. For each fitting confirm with the supplier and with the project electrician:
- Where the fitting sits relative to the basin, bath and shower enclosure, and what protection rating that position calls for
- Voltage, driver location and whether the driver stays accessible for service
- Whether the circuit is switched at the wall, at the mirror or by a shared control
- Cable provision behind the vanity or cabinet if the fitting is wired to the cabinet rather than the wall
- Replacement route: are the light modules replaceable, and does the supplier stock spares?
Our bathroom wall sconce range is specified per project, so finish, layout and dimensions are set against the drawings and the electrical details are confirmed for each installation rather than assumed from a catalogue entry.
5. Finish, sizing and how it coordinates with the rest of the room
Vanity lighting sits next to taps, mirror frames, cabinet handles and sometimes a towel rail, so a finish that clashes shows up immediately. Put the fitting's finish against the hardware schedule you have already signed off, and check it under both daylight and artificial light before ordering for a whole floor. Where a room is being fitted out as one package, specifying the lights together with the vanity lighting, mirror cabinet and vanity unit means one production run, one finish reference and one set of dimensions to check.
Made-to-measure sizing matters more here than in most categories. A fitting supplied to the drawing width avoids the awkward gap at one end of a wide mirror, and cabinet lighting can be cut to the carcass run instead of being trimmed on site. Our integrated cabinet lighting is specified with the cabinetry, so the profile, layout and finish are fixed at the same time as the joinery.
6. Mounting, substrate and clearance
- Wall build-up: timber studs, steel framing, brick or a tiled substrate each need different fixings and back boxes; note which one the fitting is being fixed to.
- Clearance for doors and drawers: sconces beside a mirror must clear a cabinet door or a mirrored door that swings open.
- Vanity depth: on a deep countertop, a fitting set too low can glare into the eyes of someone leaning in.
- Mirror thickness and edge detail: integrated lighting has to suit the glass being used.
7. Procurement and lead-time questions
For a multi-bathroom job, buying per unit tends to create three problems: small finish differences between batches, three sets of delivery dates, and three sets of spares to track. Ordering the whole bathroom lighting package against one specification removes them. When you request a quotation, ask for:
- A sample or prototype fitting for sign-off before the full quantity is produced
- The finish reference in writing, not just a photograph
- Packaging suited to the shipping route and to site storage
- Spare fittings held with the order, typically a few percent of quantity for future replacement
- A single contact who handles production, freight and any snag list after installation
We supply these items as part of a wider bathroom package: vanities, mirror cabinets, ceramics, showers and lighting. They are ordered under custom and OEM service with door-to-door delivery, which is how the villa and hospitality projects we work on usually buy them. If your project needs several identical bathrooms, our bathroom sanitary fixtures range and lighting accessories can be specified together against one schedule.
8. Handover documentation
Before the final invoice, make sure the file for each fitting includes the specification sheet with lumen output, colour temperature and colour rendering as supplied; wiring and driver details; the finish reference; spare-part codes; and installation instructions. A facilities team replacing a fitting three years later works from that file, not from memory.
The checklist in one place
- Fixture position decided against the mirror layout on the drawings
- Lumens per fitting stated for the whole mirror run
- One colour temperature across the bathroom or floor
- Minimum colour rendering written into the specification
- Glare checked: shade, diffuser or lens hides the source from the user
- Suitability confirmed against the fitting's position relative to basin, bath and shower
- Driver type, dimming compatibility and control method confirmed with the electrician
- Finish matched to taps, mirror frame and cabinet hardware schedule
- Made-to-measure dimensions set for wide mirrors and cabinet runs where needed
- Substrate, fixings, door swing clearance and countertop depth checked
- Sample approved before the full quantity is produced
- Spares ordered with the main quantity
- Packaging and delivery route agreed for site conditions
- Specification sheets, wiring details and spare-part codes handed over at completion
Product dimensions, finishes, electrical ratings and suitability for a given bathroom zone are confirmed project by project. The figures and configuration options in this article are set against your drawings rather than fixed catalogue values, so treat the checklist as a specification routine and confirm each item with our team before ordering.
If you are specifying lighting for a villa, hotel or multi-unit job, send us the bathroom layout, the mirror elevations and your hardware schedule. We will quote the vanity lights, mirror cabinets and vanities as one package with made-to-measure sizing and matched finishes, and coordinate production, freight to site and installation support through the same contact.