A wall panel line rarely causes problems at the specification stage. It causes problems in the gaps between measurement, finish approval, subframe design and site handover. The checklist below follows the order a buyer actually works in, so each item can be closed out before the next one opens. Use it as a procurement record for Santerson Matte Lacquer Panels or any other panelled wall system on the project.
What the product page actually commits to
Before checking anything else, be clear about what is standard and what is configured per project. The Santerson Matte Lacquer Panels listing sits in the Paneling Systems collection and describes the range as made for wall system projects where finish, layout and dimensions are specified to suit each space. Configuration covers made-to-measure sizing plus material and finish options, and the page asks that dimensions and specifications be confirmed for each project.
That wording sets the shape of the whole purchase. Nothing about a matte lacquer wall is fixed until you have issued drawings, a finish reference and a panel layout. A buyer who treats this as a catalogue item with a fixed size will end up with panels that arrive correctly made but wrongly sized.
Stage 1: scope, measurement and the substrate
Panel work fails early when the wall behind it is left out of the specification. Record these before any enquiry goes out:
- Room list and panelled areas per room, with the reason for panelling in each: acoustic separation, a concealed door, a head wall, a media wall or simply a finish.
- Dimensioned drawings of every wall face, including floor-to-ceiling heights at high and low points, not one nominal height for the whole job.
- Positions of sockets, switches, thermostats, TV brackets, air registers, sprinkler heads and light points that will land inside or on a panel.
- The existing substrate: masonry, plasterboard, framed stud wall or an uneven old surface. Note moisture risk on any wall sharing a bathroom, external face or wet climate.
- Whether the subframe and levelling packing are in your scope or the supplier's, and who supplies the fixings, trims and corner profiles.
A practical test for this stage: could a second contractor price the same job from your documents alone? If not, the scope is still in your head.
Stage 2: finish, layout and the approval sample
Finish reference
Matte lacquer reads very differently under warm bathroom light and cool corridor light. Ask for a physical finish sample in the actual panel construction, not a colour chip, and view it against the room's lighting plan and adjacent finishes such as joinery fronts and matte lacquer wardrobes where both appear in the same interior. Sign off the sample with a reference number and keep the signed piece; it is your acceptance standard on delivery.
Layout and joints
- Panel widths and joint direction drawn to scale, with joints aligned to door reveals, bed centres and furniture lines rather than left to the fitter.
- Decision on open shadow-gap joints or closed flush joints, and the profile used at internal and external corners.
- Where a full-height run meets the ceiling and floor: reveal, trim, or a deliberate shadow gap.
- Any integrated element drawn into the same layout, for example integrated door and paneling, niche panelling, or a wall that also carries storage.
- Panel thickness and total built-out depth, checked against skirting lines, door swings and any reveal you need to keep.
Adjacent product families
Most projects do not buy one panel type. Where the same wall carries several surfaces, decide the combination before ordering so that finishes are specified together: Santerson Textured Panels against a flat matte field, or Santerson Stone & Marble Panels at a feature section. The wider Wall Panel Systems range covers the matching partition and panelling families, which keeps joint details consistent across rooms.
Stage 3: cutting list, tolerances and packaging
This is where a made-to-measure order either holds together or turns into a site problem. Close out each line in writing:
| Checklist item | What to confirm with the supplier |
|---|---|
| Panel schedule | One numbered line per panel: room, wall reference, finished size, thickness, finish code, edge detail and installation sequence. |
| Tolerance basis | Whether sizes are given as finished face sizes or cut sizes, and the permitted tolerance per panel and per joint. |
| Cut-outs | Factory-cut openings for sockets and light points, with positions dimensioned from a fixed edge of each numbered panel. |
| Fixing method | Clip, batten or adhesive fixing, the subframe material and spacing, and whether fixings ship with the panels. |
| Label system | Every panel labelled with its schedule number and wall reference on the back, plus a packing list that matches the schedule. |
| Spares and oversize | Agreed quantity of spare panels or offcuts held for future repairs in the same finish batch. |
| Protective packing | Edge protection and face protection suitable for the shipping mode chosen, plus panel orientation on the pallet. |
Rule of thumb: do not release production until the numbered panel schedule, the signed finish sample and the joint detail drawing all reference each other. Any one of the three missing is enough to cause a remake.
Stage 4: logistics, receipt and installation
For an overseas order, freight planning belongs in the same checklist as the product. Santerson's logistics and door-to-door delivery service covers freight forwarding by sea, air and rail together with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Confirm the delivery terms, the named delivery point and who lifts the panels to floor level for your site.
- Agree Incoterms, delivery address and receiving hours in writing before dispatch.
- Check the packing list against the panel schedule on arrival, then inspect faces and edges before signing; photograph any damage at the point of receipt.
- Store panels flat and acclimatised in the building where they will be installed, away from wet trades.
- Dry-lay one full wall bay first and confirm joint alignment, finish consistency and cut-out positions before fixing the rest.
- Record snags on completion, and keep the signed finish sample with the handover file for later repairs.
Stage 5: commercial terms worth locking down
- A quotation that itemises panels, trims, subframe components and fixings separately, so a variation in one does not reprice the whole order.
- Written confirmation of what is included for made-to-measure work, since sizing and finish options are configured per project.
- Lead time stated from the date drawings and the finish reference are approved, not from the date of the order.
- Payment stages tied to drawing approval, production release and dispatch.
- Warranty scope, spare-parts availability and after-sales response written into the purchase record rather than assumed. Santerson lists installation and after-sales support, including on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance; ask for the specific terms that apply to your order.
- If finishes or sizes are bespoke, confirm the custom route in writing. The custom and OEM service page covers bespoke material finishes and textures alongside custom design and prototyping.
Where panel buying fits in a whole-project order
Panelled walls rarely sit alone. When the same team is also ordering joinery, vanities, wardrobes and doors, joint details and finish codes need to be consistent across families, which is easier if everything is specified together under one one-stop furniture and building materials procurement. For villa and hospitality work, that coordination usually runs through turnkey interior project solutions, where design, production, logistics and installation are handled as one programme.
Product configuration details on this page reflect the published product listing. Materials, dimensions, finish options, tolerances, warranty terms and freight arrangements must be confirmed for your specific project before ordering.
Send us your room drawings and the wall faces you want panelled. We will return a panel schedule, finish references and a configuration proposal for Santerson Matte Lacquer Panels, with sizing and joint details confirmed before production starts. Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com.