Wooden sliding panels do a quiet job in a finished interior: they close off a closet, screen a work area, hide storage, or let one room be split into two without building a second wall. Because the panel is visible from both sides and moves every day, the details that decide whether it looks built-in or bought are all agreed before production starts. A wooden sliding panel supplied to a villa or apartment project is made to measure, so the specification conversation is where cost, appearance and function are actually settled. This guide lists what procurement teams, designers and builders should put on the table in that first discussion.

1. Dimensions: the opening decides everything else

Panel sizing is not a catalogue choice. Track length, panel height, overlap and the number of leaves all follow from the finished opening, measured after wall finishes, flooring and ceiling work are complete. Buyers should send the opening width and height, the floor-to-ceiling condition, and what sits above and beside it — a beam, a window head, a wardrobe return, or an integrated TV panel that the panel must pass in front of.

Three dimension questions are worth answering in writing:

  • What is the clear opening after finishes, and who measured it — the site contractor or the panel supplier?
  • How many panels, and how much travel does each leaf need to stack fully clear of the opening?
  • Is the headroom enough for the track assembly, or does the ceiling detail need to be lowered or boxed in?

If the panels also form storage — as with closet sliding panels — confirm internal depths and what has to fit behind the panel: hanging rails, shelves, drawers or an ironing recess. The interior layout changes the required clearance and should be fixed before the door schedule is drawn.

2. Track and hardware: surface or recessed, top or bottom rolling

Hardware determines how the system feels in use and how much building work it demands. The main decisions to raise are where the load is carried, whether a floor track is acceptable, and what duty rating the runners need for the panel weight. For high-use areas such as hotel rooms and shared apartments, ask specifically about runner and wheel specification rather than accepting a general "sliding system" description.

  • Load path: top-hung systems avoid a floor track and its trip hazard and dirt line; bottom-rolling systems trade that for a recessed track detail at floor level.
  • Stacking: single, bi-parting or multi-panel stacking changes the required side space and the number of track runs.
  • Panel-to-panel alignment: overlapping leaves need rebated edges or a staggered track; flush panels need an accurate wall plane.
  • Stops, soft close and handles: specify whether the panel stops by hardware or by a reveal in the wall, and whether handles are recessed so nothing protrudes into a circulation route.

For room-dividing applications, as with partition sliding systems, the discussion widens to track support. A long unsupported span needs structural backing above the ceiling line, and that belongs to the builder's scope, not the joiner's. Agree in advance who provides the supporting steel or blocking, and who is responsible once the panel is on site.

3. Material and finish: what the panel is made of and how it is finished

The visible face is where customisation has the widest range and the biggest effect on price. Santerson's Custom & OEM service covers bespoke finishes, textures and material selection, so buyers can specify rather than choose from a fixed list. The practical options to discuss are:

  • Core and substrate: solid timber, engineered board or laminated panel — the choice affects weight, stability across a tall leaf, and cost per square metre.
  • Surface: veneer, lacquer, laminate or textured face. Textured sliding panels suit feature walls and headboard-type applications where the panel is read as part of the wall lining.
  • Colour and grain matching: state which existing element the panel must match — wardrobe fronts, wooden sliding doors, skirting or flooring — and agree a physical sample, not a screen image.
  • Edge treatment: exposed edges on both faces need a finished edge detail; specify the radius or arris so leaves that meet do not chip.

Where panels continue into the general wall lining, discuss them together with wall panel systems and textured panels so the sliding section disappears into the same material. A single supplier handling both makes grain direction, sheen level and joint lines consistent.

4. Acoustic and privacy performance

A sliding panel is not a wall, and acoustic expectations need to be set honestly at the specification stage. Gaps at the meeting stile, at the head and at the floor are what let sound through, so the level of sealing required should be stated as a requirement rather than assumed. For conference rooms, media rooms and hotel suites, discuss whether an acoustic sliding panel is the correct product, what perimeter sealing is offered, and how seals are maintained after repeated use. Where visual privacy matters more than sound — a study alcove or a dressing area — full-height opaque panels with proper overlap are usually sufficient and less costly.

5. Lighting and integrated services

Panels that hide storage or a media position often need light behind them. Points to settle: whether interior lighting is switched from the panel, from the wall, or by a door-activated switch; where cable routes pass without being caught by a moving leaf; and how a driver or transformer remains accessible for maintenance. Santerson's service scope includes integrated cabinet lighting, so the wiring provision can be coordinated with the panel instead of being added on site.

6. Quantities, schedule and who installs

Sliding panels are usually one-off items per opening, which makes quantity and phasing important. Confirm how many openings share one specification so tooling and finishes repeat, and which rooms are on the critical path. Because these systems are made to measure for each project, buyers should plan for a site verification round after first fix, before final release for production.

Then agree responsibility for installation and handover. Santerson lists logistics with door-to-door delivery, plus installation and after-sales support as part of its service scope, so the discussion should cover: packaging and protection for transit, container loading sequence against site access, who fixes tracks to what substrate, snag inspection on completion, and which parts are held as spares for wheels and guides. For projects abroad, including Australian villa and hospitality work, confirm delivery terms, import paperwork and the installation arrangement in writing — these details vary project by project and should not be assumed from marketing material.

7. A short specification checklist for your next enquiry

  • Finished opening dimensions per opening, with drawings and photographs of the surrounding condition.
  • Application: closet, room divider, media screen or storage wall — this drives hardware choice.
  • Panel count, stacking direction and required side space.
  • Track type, load path, soft close, stops, handle style.
  • Face material, colour or grain reference, edge detail, sample approval route.
  • Privacy and acoustic requirement, stated as a need rather than assumed.
  • Internal layout behind the panel and lighting provision.
  • Quantities, phasing, site verification date, delivery terms and installer of record.

Buyers who bring these answers to the enquiry get an accurate quotation quickly and avoid a second production run. Send your opening sizes and finish references to SANTERSON's team, and the panel specification — from wooden sliding panels to storage walls and sliding storage panels — can be confirmed against your drawings before manufacturing starts.