A two tone sliding door wardrobe is one of the easier built-in items to specify and one of the easier ones to argue about later. The finish combination is visible every day, the doors move every day, and the unit usually arrives in panels that someone else assembles on site. Before you place an order, it is worth writing down what happens after the wardrobe leaves the factory.

Our Two Tone Sliding Door Wardrobes are made to measure, with the finish, layout and dimensions specified per project. That same flexibility is what makes the after-sales conversation matter: the questions below are the ones we answer in writing on every wardrobe order, and they are the ones a buyer should expect a supplier to answer clearly.

1. What exactly does the warranty cover, and for how long?

Wardrobe warranties are usually split into parts, and the split is where most confusion starts. Ask the supplier to state, separately:

  • the carcass and panels, including edge banding and the colour match between the two tones;
  • the sliding door system — track, hangers, rollers, buffers and any soft-close hardware;
  • mirrored or glass inserts, if the design includes them;
  • internal fittings such as drawers, rails, shelves and lighting.

For each item, get the coverage period, what counts as a manufacturing fault versus normal wear, and whether the clock starts at shipment, on arrival or at handover. Sliding hardware is the component most likely to be replaced later, so it deserves its own line in the agreement.

2. Which spare parts can you still order in three years?

Sliding doors depend on small, specific parts: a top hanger, a bottom guide wheel, a floor track, a door stop, a sealing brush. A wardrobe ordered for a villa or an apartment handover may need one of those parts long after the project team has moved on. Ask the supplier to confirm in writing:

  • which hardware items are held as stock spares and which are made to order;
  • how replacement panels are matched — batch, colour code and finish name, not a photograph;
  • how a spare part is shipped on its own, and what that costs you.

If the wardrobe was produced as part of a larger built-in furniture package, ask whether spares are available for the whole package under one reference number. That single detail saves months of searching when one door sits slightly out of line.

3. Who fits it on site, and who answers when the fit is not right?

Made-to-measure sliding wardrobes travel flat and are assembled in the room. Decide before production who does that work:

  • the supplier's own installation team, a local contractor you appoint, or the builder;
  • what guidance is supplied — assembly drawings, panel labelling, hardware layout, opening tolerances for skirting and cornices;
  • how defects are separated: a panel that arrived damaged, a door that will not sit parallel, or a floor that is out of level.

Out-of-level floors and uneven wall returns are the most common reason a sliding door binds after installation. Ask how the supplier wants these recorded before fitting — with measurements and photographs — so the remedy is not argued about afterwards. Our installation and after-sales support covers on-site fitting, inspection and snag lists, which is where those items get closed out.

4. How are faults reported, and by whom?

One named contact through the whole process matters more than a promise of speed. Ask for:

  • a single person or desk who handles after-sales for your order, with their email in writing;
  • the format they expect for a claim — photographs, order number, panel code, description;
  • what happens next: remote diagnosis, replacement part shipped, or an on-site visit.

For projects delivered across several rooms or units, ask whether faults are tracked per room. A snag list that refers to wardrobe panels by code is far easier to close than one written as "bedroom 2 door".

5. What happens if the site changes after production starts?

Two tone designs change most often at the detail stage: a handleless groove instead of a pull, a different track colour, a mirror panel swapped for a matte panel. Ask what is possible after sign-off and what it costs. Useful answers are specific — which changes can be made in production, which need a re-made panel, and how late a change can be made without re-cutting.

Ask before ordering: if the tone split or handle detail changes on site, what is the cut-off point, and what does a re-made door cost?

6. What paperwork arrives with the wardrobe?

The documents are what make a later claim straightforward. Confirm that you will receive:

  • a panel and hardware schedule keyed to the drawings;
  • the finish specification — board, surface material and colour reference for each of the two tones;
  • assembly drawings and a labelled packing list per room;
  • care and cleaning guidance for the door surfaces, particularly high gloss panels.

Questions worth putting in the purchase order

Ask aboutWhat a clear answer looks like
Warranty scopeCoverage stated separately for panels, sliding hardware, glass or mirror inserts and internal fittings
Spare partsNamed hardware items held as spares, plus how replacement panels are colour-matched
InstallationA named installer, with tolerances for floors and walls recorded before fitting
Fault reportingOne contact, a defined claim format, and a stated remedy route
Changes after sign-offThe production cut-off for finish and layout changes, with costs
DocumentationPanel schedule, finish specification and care instructions supplied with the delivery

A wardrobe order is easier to manage when these answers are on one page before production begins. If you are specifying sliding wardrobes together with other cabinetry for a home or an apartment handover, we produce them as part of custom and OEM manufacturing, so the finish specification, panel schedule and after-sales contact are handled under one order.

Send us the room dimensions, the two finishes you have in mind and your handover date, and we will confirm the layout, hardware set and the after-sales terms for that wardrobe before production starts.