What about the plant size of ?
2019-01-24
Plant is competitive in China's italian leather bed industry. In the plant, there are different workshops constructed for different production step. In future, we will continue expanding the scale of the plant and will do the endeavor to build a complete supply chain, so as to be more competitive in the international market.

The unique advantage for Genal Furinture Industry Co.,Limited to dominate most part of market lies in its advanced technology and strict QC system. The dining furniture series is available in a wide range of types and specifications. Each piece from Genal Furniture is durable and practical. . modern dining room sets offered by are manufactured from best quality material and known for their less maintenance, easy operation, minimum power consumption and outstanding performance.  Varied innovation methods create more beautiful product design. Furniture from Genal strikes a perfect combination of wood and textile.

Modern living room furniture is a bridge for Genal to international market. Call!
Genal Array image43
Custom message
Contact