Tropical Resort Hotel Furnishing Project Scheme

This tropical resort hotel full furnishing solution combines solid wood carved decoration and natural rattan outdoor furniture, covering king room, twin bedroom, functional workstation and pool leisure public zone. All furniture adopts commercial durable materials, customized size, color and fabric to match resort hotel large-scale engineering projects.


1-260GQ61930193.png

King Size Deluxe Guest Room

Complete king bed suite with matching solid wood bedside cabinet, writing desk and leisure armchairs, classic tropical wood carved wall decoration.


1-260GQ6200O59.png

Hotel Workstation & Connecting Room

Integrated solid wood writing desk, full-length mirror and connecting guest room layout, meet business resort hotel functional demands.


1-260GQ62035430.png

Twin Bedroom Family Room

Multi twin bed layout for family tourists, unified wood trim & carpet matching the whole hotel interior design style.


1-260GQ621335B.png

Poolside Outdoor Leisure Lobby

Waterproof rattan sectional sofas & side tables for swimming pool public rest area, moisture-proof material suitable for tropical humid resort environment.



Our Resort Hotel Engineering Advantages

  1. Moisture-proof solid wood & anti-UV rattan material for tropical coastal resorts

  2. Mass stable production capacity for hotel batch procurement orders

  3. Unified whole hotel style matching & free layout 3D renderings for bidding

  4. Commercial stain-resistant fabric, fire-proof option available for hotel compliance

  5. Consolidated full container shipment & reinforced export packaging