Genal  > 

AI - Page Sitemap

 > 

Top solid wood dining table Suppliers

Top solid wood dining table Suppliers

Top solid wood dining table Suppliers

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Company Advantages
1. The manufacturing steps of Genal dining tables for small spaces involve several major parts. They are materials preparation, materials processing, and components processing. Genal home furniture's resistance to mechanical damage is remarkable
2. Safety of the product shall not be the concern. People are not subjected to electric dangers such as leakage, overcurrent, or electromagnetic radiation. Genal furniture is ergonomic and designed to trifles
3. The solid wood dining table thus produced has features like dining tables for small spaces. Furniture from Genal features attractive design
4. solid wood dining table is flexible which can be adjusted by different circumstances. Genal furniture combines functionality with aesthetics


Top solid wood dining table Suppliers-1



   PRODUCT  & PARAMETERS
INDUSTRY


Top solid wood dining table Suppliers-2
Top solid wood dining table Suppliers-3


PARAMETERS

Product name

Round shape solid wood dining table

Model no

CH 1703

Frame material

Imported Zingana 

Color

Natural gold and black color

Feature

Eco-friendly Akzo nobel paint,

Dimension

ф1350*760H (mm)

Ф53.1*29.9 inch

Loading qty

106 pcs / 20’GP , 268 pcs / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Top solid wood dining table Suppliers-4



Product features


- Natural unique Ebody wood texture, shining gold and black mixed color 

- Clear and natural wood frain, smooth and flat furface

- Round and large table base design,  make whole table feel more the table more stable
- Heavy load bearing for the table base





   PRODUCT  DETAILS
INDUSTRY


Top solid wood dining table Suppliers-5
 Material
Glossy, straight texture, fine and uniform structure; hard wood, high strength.
Top solid wood dining table Suppliers-6
Design
Round and large table base design,  make whole table feel more stable.
Top solid wood dining table Suppliers-7
AkzoNobel painting

AkzoNobel painting is green painting, the advantage is that no poison, no pollution, no waste. Better protect your family member's health. 

Top solid wood dining table Suppliers-8
Color difference
  • Solid wood is spiritual, hierarchical, if the people look from different angle, it will show different visual aesthetics;

  • Due to the different light sources, the lamplight or the sunlight will affect the color of the wood;

  • Due to the wood's natural nature, after reprocessing, drying and polishing, the inconsistency of water absorption capacity will cause chromatic aberration.

   PACKING  & SERVICES
INDUSTRY


Top solid wood dining table Suppliers-9


Top solid wood dining table Suppliers-10
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Top solid wood dining table Suppliers-11
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Top solid wood dining table Suppliers-12
Personalized
Provide personalized service for customers according to the needs of different customers.
Top solid wood dining table Suppliers-13
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. We have a professional project management team. Combining their years of experience, they take the time to get to know our customers' manufacturing needs, visiting their sites and understand their specific issues.
2. Good customer service is the base for Genal to develop in solid wood dining table industry. Call!
Product Message
Contact