Genal  > 

AI - Page Sitemap

 > 

Top fabric sofa factory

Top fabric sofa factory

Top fabric sofa factory

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product Details
Genal pursues perfection in every detail of modernbedroomfurniture, so as to show quality excellence.Under the guidance of market, Genal constantly strives for innovation. modernbedroomfurniture has reliable quality, stable performance, good design, and great practicality.
Company Advantages
1. Genal buy sofa has gone through quality testing in a compulsory manner that is required for furniture. It is tested with the right testing machines that are well-calibrated to ensure the most reliable testing result.
2. The product is highly resistant to bacteria or mold. A kind of mold-proof and antiseptic agent is added to its raw materials by dipping method during its preliminary stage.
3. The product is not prone to rust. The presence of the stable film prevents corrosion by acting as a barrier that limits oxygen and water access to the underlying its surface.
4. Genal Home Furniture has gained brand reputation and brand loyalty over the years.


Top fabric sofa factory-1



   PRODUCT  & PARAMETERS
INDUSTRY


Top fabric sofa factory-2
Top fabric sofa factory-3


PARAMETERS

Product name

Luxury fabric armchair

Model no

CH 313

Frame material

Imported red beech

Material

Cotton and linen jacquard fabric, high density sponge

Color

Light Burl Walnut with gold paint

Feature

Eco-friendly Akzo nobel paint,

Dimension

750*810*1150H (mm)

29.5*31.9*45.3 inch

Loading qty

38 sets / 20’GP , 91 sets / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Top fabric sofa factory-4



Product features


- Elegant cambered wood frame
- High density cotton and linen jacquard fabric
-Imported red beech solid wood
- High density resilience sponge
- Hand made bronze nail stripe





   PRODUCT  DETAILS
INDUSTRY


Top fabric sofa factory-5
fabric
good quality cotton & linen fabric, smooth surface
Top fabric sofa factory-6
wood frame
Imported red beech solid wood, rare, precious,  with good impact resistance
Top fabric sofa factory-7
leg

3D carved pattern, pure hand made gold foil/leaf 

Top fabric sofa factory-8
armrest design
vortex armrest design, complex craftsmanship, full of luxury
   PACKING  & SERVICES
INDUSTRY


Top fabric sofa factory-9


Top fabric sofa factory-10
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Top fabric sofa factory-11
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Top fabric sofa factory-12
Personalized
Provide personalized service for customers according to the needs of different customers.
Top fabric sofa factory-13
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. In today's lifestyle driven market, Genal is unique in being able to quickly respond to fabric sofa .
2. We have recruited a group of talents. They are mainly R&D staff, designers and experienced production technicians. These staff all are well equipped with industry know-how and years of experience, they are capable of providing the most professional advice and product solution.
3. Genal will continue to give full play to the important role of culture in improving corporate management. Get price! Genal Furinture Industry Co.,Limited attaches great emphasis to cultivating its innovation capability. Get price! Genal Furinture Industry Co.,Limited is committed to integrating leather sofa set industry resources in China and abroad and re-engineering the value chain. Get price!
Packaging & Shipping

 * Packaging & Shipping : 

 
Product Description

 * Descriptions : 

Brand name:Rocky Blin
Item No. 
Description:Corner Sofa,Sectional Sofa
Meterials:Eucalyptus+high density foam+fabrics
Upholstery:High quality linen cotton blend fabric
Padding:High resilient foam. D40 for seat cushion;D35 for back cushion/armrest.
Packing:1: Standard exported packing: EPE+Dustproof Plastic Film+Corrugated Board+Plastic Knitting Bag
2: Carton packing is also available.,but extra cost will be added, or as per clients' requirements.
Payment:a) T/T; 30% Deposit,70% balance before loadingb) L/C at sightc) West Union
Warranty:a) Inner Frame warranty for 10 years. Upholstery for 3 years.
b) Lifetime consultation on problems occurred

 

Product Message
Contact