Home  > PRODUCT  > Living Room Furniture  > Living room TV stand  >  Retractable solid wood TV stand
Retractable solid wood TV stand

Retractable solid wood TV stand

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Related Products




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product name

Retractable solid wood TV stand

Model no

CH 1701 TV stand

Frame material

Imported Zingana 

Color

Natural gold and black color

Feature

Retractable TV stand

Dimension

Max :  2700*440*460H (mm)
Min :  1780*440*460H (mm)

Max :  106*17.3*18.1H (mm)
Min :  70*17.3*18.1H (mm)

Loading qty

75 pcs / 20’GP , 180 pcs / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY




Product features


- Natural unique Ebony wood texture, shining gold and black mixed natural color.  
- Simple and elegant design,
- Retractable design, can change the length flexibly
- Strong wood frame structure





   PRODUCT  DETAILS
INDUSTRY


Ebony material
Glossy, straight texture, fine and uniform structure; hard wood, high strength
Design

Multi-capacity large drawer storage space design, multiple storage space, convenient to classify daily debris;

Scalable design, the length can be adjustable during daily use.

AkzoNobel painting

AkzoNobel painting is green painting, the advantage is that no poison, no pollution, no waste. Better protect your family member's health.

Color difference

Solid wood is spiritual, hierarchical, if the people look from different angle, it will show different visual aesthetics;

Due to the different light sources, the lamplight or the sunlight will affect the color of the wood;

Due to the wood's natural nature, after reprocessing, drying and polishing, the inconsistency of water absorption capacity will cause chromatic aberration

   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message
社媒暂无评论
Contact