Home  > PRODUCT  > Bedroom Furniture  > Bedroom bed  >  Restlay Modern Geometric Pattern Upholstered Faux Leather Platform Bed With Black Steel Leg(yellow)
Restlay Modern Geometric Pattern Upholstered Faux Leather Platform Bed With Black Steel Leg(yellow)

Restlay Modern Geometric Pattern Upholstered Faux Leather Platform Bed With Black Steel Leg(yellow)

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product Name:

Restlay Bedroom Furniture Light Luxury Bed 1750

Style:

Modern Light Luxury Style

Item Number:

Bed:1750
Night Table:C300
Bed End Stool:C307

Brand:

Restlay

Application:

Bedroom Furniture

Material:

Leather, Wooden, Sponge, Iron

Color:

Yellow

Size:

Bed: 1500*1900 MM / 1800*2000 MM
Night Table:500*450*450 MM
Bed End Stool: 1570*1570*370 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


leather
The gloss is bright, the hand feels fine, the leather texture and fine pores are clearly visible, flexible and wear-resistant, and the four seasons are not stuffy.
Iron square tube, resistant to wear, high strength, not easy to deform.
Sewing

The needlework is fine and uniform, ensuring 1-2 stitches per mm and the gap is dense. 

Trapezoidal structure, more stable
In line with the mechanics principle, the structure is more stable and does not deform


More details show


                
                 
                 
                 
   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message
社媒暂无评论
Contact