Home  > PRODUCT  > Bedroom Furniture  > Bedroom bed  >  Restlay Modern Design Upholstered Faux Leather King/Queen Size Bed Frame With Solid Wood Slat
Restlay Modern Design Upholstered Faux Leather King/Queen Size Bed Frame With Solid Wood Slat

Restlay Modern Design Upholstered Faux Leather King/Queen Size Bed Frame With Solid Wood Slat

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product Name:

Restlay Bedroom Furniture Light Luxury Bed 1807

Style:

Modern Light Luxury Style

Item Number:

Bed: 1802A
Night Table: C801

Brand:

Restlay

Application:

Bedroom Furniture

Material:

Leather, Wooden, Sponge

Color:

Brown

Size:

Bed: 1500*1900 MM / 1800*2000 MM
Night Table:530*410*500 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


PU leather wrapped corner
A leather wrap at the bedside prevents bumps.

Night table 

The bedside table uses a circular inner button drawer, and the cabinet is three-dimensionally neat and more beautiful.

Backrest

The leather is tight, wear resistant, breathable and easy to maintain.

Fully relying on the bag
The bedside bag is filled with doll cotton, which fits the curve of the back of the human body and relies on comfort.
   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message
社媒暂无评论
Contact