Home  > PRODUCT  > Bedroom Furniture  > Bedroom bed  >  Restlay Modern Design Upholstered Faux Leather King/Queen Size Bed Frame
Restlay Modern Design Upholstered Faux Leather King/Queen Size Bed Frame

Restlay Modern Design Upholstered Faux Leather King/Queen Size Bed Frame

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product Name:

Restlay Bedroom Furniture Light Luxury Bed 1747

Style:

Modern Light Luxury Style

Item Number:

Bed: 1747
Bed End Stool:C305

Brand:

Restlay

Application:

Bedroom Furniture

Material:

Leather, Wooden, Sponge

Color:

Brown

Size:

Bed: 1500*1900 MM / 1800*2000 MM
Bed End Stool: 1570*450*370 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


Comfortable backrest
It is not easy to be tired for a long time. Compared with ordinary sponge cushions, the comfort is improved by 60%. It is not easy to collapse and it is not easy to be tired for a long time, giving you long-lasting comfort.
Streamline design
The bedside on both sides of the bed is designed with a streamlined body and a streamlined rhythm, embellishing the bedroom.
High bed feet, easy to clean

High-foot design, clean no dead ends.

Iron square tube, resistant to wear, high strength, not easy to deform.
   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message
社媒暂无评论
Contact