Home  > PRODUCT  > Bedroom Furniture  > Bedroom bed  >  Restlay Luxury Modern Full Faux Leather Cover Bed Frame,King/Queen Size
Restlay Luxury Modern Full Faux Leather Cover Bed Frame,King/Queen Size

Restlay Luxury Modern Full Faux Leather Cover Bed Frame,King/Queen Size

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product Name:

Restlay Bedroom Furniture Light Luxury Bed 1542-1

Style:

Modern Light Luxury Style

Item Number:

1542-1

Brand:

Restlay

Application:

Bedroom Furniture

Material:

Leather, Wooden, Sponge

Color:

Gray

Size:

Bed: 1500*1900 MM / 1800*2000 MM
Night Table:500*400*450 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


Big name design
The soft and beautiful lines are designed with exquisite comfort and comfort, and it blends her stunning fashion aesthetics.
Close connection, docking and finishing
The bed is tightly connected and the butt joints are vertically and neatly displayed, which shows the originality of the original design of the home.
Comfortable chamfer

The edge of the bed frame is polished for a long time to produce a 45-degree chamfer. The rounded feel is like touching the jade. There are no sharp corners for you to fall asleep.

Packing design
The cabinet is tightly integrated and closed, and the integrated cabinet is more stable and the bearing capacity is stronger.
   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message
社媒暂无评论
Contact