Home  > PRODUCT  > Bedroom Furniture  > Bedroom bed  >  Restlay Classic Ebony Solid Wood Bed Frame With Upholstered High Headboard,King Size
Restlay Classic Ebony Solid Wood Bed Frame With Upholstered High Headboard,King Size

Restlay Classic Ebony Solid Wood Bed Frame With Upholstered High Headboard,King Size

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product name

Solid wood bed frame

Model no

CH 1701 bed frame

Frame material

Imported Zingana 

Headboard Material

Top grain cow leather + high resilience sponge

Slat material

Imported Finland pine wood

Color

Natural gold and black color

Feature

Eco-friendly Akzo nobel paint,

Dimension

2010*2150*1130H (mm)

79.1*84.6*44.5 inch

Loading qty

35 sets / 20’GP , 85 sets / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY




Product features


- Natural unique Ebony wood texture, shining gold and black mixed color
- Elegant bed design with simple lines
- Upholstered headboard with high quality top grain cow leather, comfortable touching
- Strong bed frame structure, can bear heavy weight. With full pine wood slat base.





   PRODUCT  DETAILS
INDUSTRY


Material
Glossy, straight texture, fine and uniform structure; hard wood, high strength; high quality top grain cow leather, durable,smooth feeling.
Design
Simple line design, no complicated, more suitable for people who want simple life.
AkzoNobel painting

AkzoNobel painting is green painting, the advantage is that no poison, no pollution, no waste. Better protect your family member's health. 

Color difference
  • Solid wood is spiritual, hierarchical, if the people look from different angle, it will show different visual aesthetics;

  • Due to the different light sources, the lamplight or the sunlight will affect the color of the wood.;

  • Due to the wood's natural nature, after reprocessing, drying and polishing, the inconsistency of water absorption capacity will cause chromatic aberration.

   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message
社媒暂无评论
Contact