Home  > PRODUCT  > Bedroom Furniture  > Bedroom Beside Table  >  Nightstand End Ttable Yellow Faux Leather Cover With One Drawer, Black Metal Leg
Nightstand End Ttable Yellow Faux Leather Cover With One Drawer, Black Metal Leg

Nightstand End Ttable Yellow Faux Leather Cover With One Drawer, Black Metal Leg

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product Name:

Restlay Bedroom Furniture Light Luxury Night Table C300

Style:

Modern Light Luxury Style

Item Number:

C300

Brand:

Restlay

Application:

Bedroom Furniture

Material:

Leather, Wooden, Sponge, Iron

Color:

Yellow,Brown

Size:

500*450*450 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


The corners of the bedside table are round and smooth, which protects the family and avoids the damage caused by collision.
The large capacity storage drawer design, selected from imported wood, has good moisture resistance, prevents cracking and longer life, and is more durable.
High-quality rails, drawers are smooth and comfortable, durable and durable.
The unique crease design is artistic and beautiful, making the bedside table more beautiful and eye-catching.
   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message
社媒暂无评论
Contact