SANTERSON
  • HOME
  • Turnkey Solutions
    Villa Project
    Hospitality Project
    Office Project
  • Interior Design Services
  • Products
    Furniture Series Loose Furniture Built-in furniture Outdoor furniture Customized Furniture
    Building & Construction Materials Wall Flooring Ceiling Windows & Doors Decorative Profiles (Aluminum/Stainless Steel) Elevators Swimming pool
    Interior Fixtures Lights Carpet Sanitary Fixtures / Bathrooms Home / Kitchen / Hotel Appliances
  • About us
  • News
    Company News
    Industry News
    Blog
  • Our Services
    One-stop Solution Custom & OEM Service Logistics & Door-to-Door Delivery Installation & After-sales Support
  • Project Cases
  • Contact us
  • HOME
  • Turnkey Solutions
  • Villa Project
  • Hospitality Project
  • Office Project
  • Interior Design Services
  • Products
  • Furniture Series
  • Building & Construction Materials
  • Interior Fixtures
  • About us
  • News
  • Company News
  • Industry News
  • Blog
  • Our Services
  • One-stop Solution
  • Custom & OEM Service
  • Logistics & Door-to-Door Delivery
  • Installation & After-sales Support
  • Project Cases
  • Contact us

Blog

  • How Can Classic Folding Doors Fit into a Coordinated Fit-Out Package?
    How Can Classic Folding Doors Fit into a Coordinated Fit-Out Package?
    A classic folding door is easy to specify on its own and hard to coordinate on site. The panel, the frame, the track, th...
    2026-11-13
  • How to Review Finish Samples for Neutral Tone Lacquer Wardrobes Before Production
    How to Review Finish Samples for Neutral Tone Lacquer Wardrobes Before Production
    A colour chip on a screen and a lacquered wardrobe door in your hand are two different things. Neutral tones in particul...
    2026-11-13
  • How to Brief a Manufacturer About Custom Black Minimalist Cabinets
    How to Brief a Manufacturer About Custom Black Minimalist Cabinets
    Black minimalist cabinets look simple on a drawing and quietly difficult on site. Flat fronts, tight reveals, no visible...
    2026-11-13
  • How to Specify Glass Corner Wardrobes in a Project Procurement Brief
    How to Specify Glass Corner Wardrobes in a Project Procurement Brief
    A glass corner wardrobe usually appears late in a project — in the bedroom schedule, in a joinery drawing, sometimes onl...
    2026-11-13
  • What Should You Prepare Before Contacting a Supplier About Custom Bronze Stainless Steel Laser Cut D
    What Should You Prepare Before Contacting a Supplier About Custom Bronze Stainless Steel Laser Cut D
    A laser-cut bronze stainless steel screen is one of those elements that can define a hotel lobby or a villa entryway, bu...
    2026-11-13
  • What Should Be Included in a European Oak Engineered Wood Flooring (2207) Product Submittal?
    What Should Be Included in a European Oak Engineered Wood Flooring (2207) Product Submittal?
    A submittal package for European Oak Engineered Wood Flooring (2207) has one job: let the architect, the main contractor...
    2026-11-13
  • What Information Does a Supplier Need to Quote Santerson Glass Sliding Panels?
    What Information Does a Supplier Need to Quote Santerson Glass Sliding Panels?
    Glass sliding panels look simple on a drawing: two or three sheets of glass on a track, sliding neatly across an opening...
    2026-11-13
  • How to Compare Suppliers of European Oak Engineered Parquet Flooring for Commercial Projects
    How to Compare Suppliers of European Oak Engineered Parquet Flooring for Commercial Projects
    European oak parquet has become a default floor specification for hotels, serviced apartments, showrooms and office fit-...
    2026-11-13
  • What Should You Prepare Before Contacting a Supplier About Santerson Corner Storage?
    What Should You Prepare Before Contacting a Supplier About Santerson Corner Storage?
    A corner unit in a bathroom rarely gets the attention it deserves. The angle is awkward, the depth changes halfway down,...
    2026-11-13
  • How to Plan Procurement of Custom Minimalist Bedroom Wardrobe - Modern Storage Solutions for a Hospi
    How to Plan Procurement of Custom Minimalist Bedroom Wardrobe - Modern Storage Solutions for a Hospi
    Wardrobes rarely win a design presentation on their own, yet in a hospitality project they decide how usable a guest roo...
    2026-11-13
  • 7
  • 8
  • 9
  • 10
  • 11
  • SANTERSON

    We operate a 3,0000m² factory with 200+ employees, exporting 92% of our products globally.

    We specialize in turnkey solutions for hotels, villas and office projects - from design and production to door-to-door delivery.

    +86-13928214007

    Contact: PHILLIP

    Whatsapp: +86-13928214007

    Email: santerson@qq.com

    Address:

    China: 1st Floor, 2nd Building, District 1, Wanyang Zhongchuang Zone Phase II, No.8, 2nd Road West District, Baochong Industrial Zone, Longjiang, Shunde, Foshan 528318, China

    Vietnam Office: 319 Lý Thường Kiệt, Phường Phú Thọ (P15, Q11) A4 Khu nhà ở thương mại Thuận Vietnam

    Singapore Office: 111 North Bridge Rd #07-22 PeninsulaPlaza, Singapore179098.

    South African Office: R550 Road, Johannesburg, Gauteng, South Africa

    GET A QUOTE

    Copyright @ 2026 SANTERSON(CHINA) INDUSTRY CO.,LIMITED AIIl rights reserved.