GENAL fashion designed TV stand can be perfectly combined with the cabinet that has the function of furnish and decorate. The material we use is solid wood, and the surface of the TV stand is smooth. Definitely, the surface should be very easy to clean, and touch feeling is smooth to comfortable. 

Total: 1 page
Contact