Genal  > 

AI - Page Sitemap

 > 

Latest round dining table and chairs for business

Latest round dining table and chairs for business

Latest round dining table and chairs for business

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Enterprise Strength
  • With a complete service system, Genal is dedicated to providing consumers with comprehensive and thoughtful services.
Product Comparison
Genal pays great attention to integrity and business reputation. We strictly control the quality and production cost in the production. All these guarantee modernbedroomfurniture to be quality-reliable and price-favorable.Compared with same kind of products in the industry, modernbedroomfurniture has the following highlights due to the better technical capability.
Company Advantages
1. The design of Genal round dining table and chairs is governed by a set of principles which are emphasis, rhythm, unity, balance and scale, and proportion.
2. This product can maintain a hygienic surface. The material used does not easily harbor bacteria, germs, and other harmful microorganisms such as mold.
3. The product can stand up to extreme environments. Its edges and joints have minimal gaps, which makes it withstand the rigors of heat and moisture over a long period of time.
4. With its top quality fabrics, the product is able to withstand frequent use in the toughest environments such as heavy rain.
5. With this product, people will feel rejuvenated and more energetic. They will gain more alleviated stress, which equals a more restful sleep.


Latest round dining table and chairs for business-1



   PRODUCT  & PARAMETERS
INDUSTRY


Latest round dining table and chairs for business-2
Latest round dining table and chairs for business-3


PARAMETERS

Product name

Round shape solid wood dining table

Model no

CH 1703

Frame material

Imported Zingana 

Color

Natural gold and black color

Feature

Eco-friendly Akzo nobel paint,

Dimension

ф1350*760H (mm)

Ф53.1*29.9 inch

Loading qty

106 pcs / 20’GP , 268 pcs / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Latest round dining table and chairs for business-4



Product features


- Natural unique Ebody wood texture, shining gold and black mixed color 

- Clear and natural wood frain, smooth and flat furface

- Round and large table base design,  make whole table feel more the table more stable
- Heavy load bearing for the table base





   PRODUCT  DETAILS
INDUSTRY


Latest round dining table and chairs for business-5
 Material
Glossy, straight texture, fine and uniform structure; hard wood, high strength.
Latest round dining table and chairs for business-6
Design
Round and large table base design,  make whole table feel more stable.
Latest round dining table and chairs for business-7
AkzoNobel painting

AkzoNobel painting is green painting, the advantage is that no poison, no pollution, no waste. Better protect your family member's health. 

Latest round dining table and chairs for business-8
Color difference
  • Solid wood is spiritual, hierarchical, if the people look from different angle, it will show different visual aesthetics;

  • Due to the different light sources, the lamplight or the sunlight will affect the color of the wood;

  • Due to the wood's natural nature, after reprocessing, drying and polishing, the inconsistency of water absorption capacity will cause chromatic aberration.

   PACKING  & SERVICES
INDUSTRY


Latest round dining table and chairs for business-9


Latest round dining table and chairs for business-10
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Latest round dining table and chairs for business-11
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Latest round dining table and chairs for business-12
Personalized
Provide personalized service for customers according to the needs of different customers.
Latest round dining table and chairs for business-13
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. Genal Furinture Industry Co.,Limited applies decades of experience and expertise in designing and manufacturing dining tables for sale . We are broadly appraised by our customers.
2. Our factory has a full range of production facilities to support manufacturing tasks. These facilities have been built in with high-end technology, which ultimately improves and guarantees the overall product quality.
3. Genal expects customers to get comprehensive services here. Please contact us! Customer satisfaction is the driving force behind development. Please contact us! Based on a deep corporate culture, Genal has become a leading dining tables for small spaces supplier. Please contact us!
Our Services

  All of our hotel products offer superior design, craftsmanship, and years of extraordinary performance and offering the lower costs and extraordinarily competitive price points. From hotel furniture to all other hotel FF&E we always offer high quality supplies at very competitive pricing. No matter how large or small your hotel furniture requirements, we will always do everything we can to satisfy your needs. If you don't see a furniture style that suits your needs, please let us know and we will custom make your hotel furniture to match almost any style.

Packaging & Shipping

   Packed in project packing with four layers(Soft foam rapping, Corner protectors, Hard Foam, Carton Box with proper shipping marks).

Product Message
Contact