Industrial Co-Working Office Furnishing Turnkey Project Scheme

This industrial open co-working space furnishing set combines exposed ceiling, wood & dark metal matching, covering staff pantry leisure zone, soundproof meeting pod, glass private meeting room and multi-person long conference area. All bar counters, conference tables and partition furniture adopt scratch-resistant commercial panels, unified industrial tone design for shared office brand whole-floor fit-out projects.

Staff Pantry & Leisure Bar Area 

Integrated wood water bar counter with high bar stools, matched long shared dining table for staff rest, coffee break and casual communication. Custom wall storage cabinet with sink and water equipment reserved position, perfect for co-working shared staff leisure zone.


Meeting Pod, Private & Open Conference Zone

Soundproof single-person meeting pod for private call & small discussion; glass partition closed meeting room with double workstations; extra-long open conference table matched colorful ergonomic office chairs. Multi-size meeting furniture combination satisfies different co-working team meeting demands.



Co-Working Office Engineering Advantages

  1. Multi-functional matching: pantry bar, soundproof pod, multi-spec conference table one-stop supply

  2. Scratch, water & stain resistant panel for high-traffic shared co-working space

  3. Flexible layout customization to fit different co-working floor structure

  4. Mass stable production capacity for chain co-working brand renovation projects

  5. Free co-working space layout CAD & 3D furnishing renderings for bidding support