A design brief that mentions a wall hung bidet usually arrives with three things missing: the fixing method, the drainage arrangement and the rest of the suite it has to sit beside. This article walks through how a specifier or purchaser turns that short line into a complete enquiry for our Wall Hung Bidet 1004F, Modern Ceramic Wall Mount Bidet for Bathroom, and what we need to hear back from you before a quotation is worth the paper it is printed on.
Start with the brief line, not the catalogue
Most enquiries we receive for ceramic sanitaryware begin as a single sentence in a schedule: "wall hung bidet, rectangular, white". That line tells us the shape and the mounting method, but it does not tell us whether the unit is going into one guest bathroom or forty identical hotel bathrooms, whether the waste is in the wall or the floor, or whether the pan, basin and accessories are being bought from the same supplier. Those answers change the specification, the packing list and the freight plan, so they belong in the enquiry rather than in a later email exchange.
The practical first step is to convert the brief line into a short checklist you can fill in while the drawings are still open on your screen. Everything below can be answered from a set of bathroom layouts and a fixture schedule, and it is the same information our project team works through with clients on villa and hospitality jobs.
What the 1004F actually is
The 1004F is a wall-hung vitreous ceramic bidet with a rectangular, softly rounded outline and a smooth glossy glaze. It is fixed to the wall through a back panel, which leaves the floor beneath it clear — a detail that matters more in daily housekeeping than it does on a rendering, because there is no pedestal base for dirt and standing water to collect against and the mop passes straight underneath. The rounded square form also avoids sharp corners at shin height in narrow bathrooms.
Recorded dimensions
545 × 360 × 410 mm, wall mounted and fixed with back panel. Confirm the figure against the current technical sheet for your order, along with waste and rough-in details, before setting out tiles and false walls.
Two properties of the body are worth writing into a project specification rather than leaving to chance. The first is the glaze: a dense glossy surface on vitreous ceramic resists staining and mineral deposits, which is why these pans clean with very little effort in hard-water locations and in high-turnover hotel use. The second is that the 1004F is a standalone hygiene fixture — it has no seat, no heated function and no electronic parts. If your brief actually calls for a shower toilet or an electronic bidet seat, say so at the start; it is a different product category and we would quote it separately.
Specify it as part of a suite
A bidet ordered on its own tends to look out of place once installed. The 1004F belongs to the 1004 sanitary family, so the visual language — glaze, radius, proportion — is already matched across the range. When you build the enquiry, group it with:
- The matching wall-hung basin from the same series, such as the Wall Hung Ceramic Basin 1004B, which shares the wall-fixed back-panel method and the same glaze.
- A pan in a compatible style, whether you are specifying from the 1004 range or taking a floating wall-hung WC from another series such as the Wall Hung Toilet 1051W.
- A floor-standing alternative for bathrooms where the waste drops to the slab instead of into the wall — the Floor Standing Bidet 1038F covers that case and can be quoted in the same shipment.
Grouping matters commercially as well as visually. Sanitaryware ordered as a coordinated set arrives on one packing list, clears customs on one set of documents and lands on site in one delivery window instead of three. For villa and hospitality projects where the same bathroom detail repeats across several rooms, that single delivery also means one inspection rather than several, and one spare-parts reference for the maintenance team after handover.
Send us these six items with your enquiry
We can price a single sample pan from a product code alone. We cannot responsibly price a project without the following, and enquiries that include them usually come back as a firm quotation in one pass:
- Quantity and room count. How many bathrooms repeat this detail, and how many spares you want held on site.
- Drainage arrangement. Wall waste or floor waste, and the rough-in you are working to. This decides whether a wall-hung or floor-standing bidet is the correct item.
- Wall build-up. Whether the pan fixes to masonry or to a framed false wall, and what carrier or bracket system your installer is using.
- The rest of the suite. Basins, pans, taps and any vanity units you want quoted alongside, so glaze and finish match across the room.
- Destination and delivery terms. Port or site address, and whether you need door-to-door delivery arranged or are collecting through your own forwarder.
- Any customisation. Finish or branding changes fall under our Custom & OEM Service; tell us at enquiry stage, because bespoke finishes and quantities change production planning.
How the enquiry moves through production
Once the details above are settled, the order follows the same route as the rest of our project work: specification confirmed against drawings, then production and quality control, then packing and container loading with the paperwork your customs broker needs, then delivery and site coordination. Our Logistics & Door-to-Door Delivery service covers freight by sea, air or rail along with commercial invoices, packing lists and certificates of origin, so a sanitaryware order can travel with the cabinetry, lighting and flooring from the same project rather than as an isolated shipment.
For projects where the bathroom fit-out is only part of a wider package, that consolidation is usually where the real saving sits. Ceramic ware is heavy and breakable; consolidating it into a planned container load with the rest of the interior fixtures reduces handling, and fewer handling steps means fewer claims on site.
A note on what we do not promise in an article like this. Dimensions, trap type and rough-in figures for the 1004F should be checked against the current technical sheet before you set out tiles or frame a wall; local plumbing regulations and approval requirements differ by market, and your project's compliance sign-off remains with the local engineer. We supply the product data — we do not certify the installation.
Where the 1004F fits best
The wall-hung format earns its place in bathrooms where floor area is tight and the visual goal is a clean, floating line: guest WCs, villa main bathrooms, boutique hotel rooms and serviced apartments. Because the pan carries no floor-mounted base, the tile field continues underneath it, which lets the same floor run unbroken from the shower entry to the wall — one of the reasons this style keeps appearing in contemporary European-style bathroom schemes.
It is a weaker fit where the waste arrangement is fixed to an existing slab with no option to re-route, and where a maintenance regime prefers every fixture bolted to the floor. Both are normal project realities, which is exactly why we hold floor-standing options in the range and would rather flag the mismatch at quotation stage than after the container has been booked.
Send the enquiry
If you have a drawing, a fixture schedule or even just the one-line brief, send it over with the six items above and we will come back with a specification, a quantity breakdown and a delivery plan for your project. As a one-stop furniture and building materials supplier headquartered in China and working on villa, hospitality and office projects, we can quote the bidet as part of a coordinated bathroom suite or as part of the full project package.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Wall hung bidet · Ceramic sanitaryware · Bathroom fit-out enquiry