A rendering looks convincing, a mood board sets the tone, and then the procurement sheet asks one blunt question: who is actually going to fabricate the feature screen behind reception? That is where most decorative metalwork enquiries stall. Below is the sequence we use to take a custom gold mirror stainless steel screen with rose gold decorative accents from a designer's brief all the way to a firm, reviewable enquiry — no guesswork on pattern, size or finish.
Start with the job the screen has to do
Before any drawing is exchanged, decide what the partition is being asked to achieve. A lobby screen that separates reception from a lounge corridor is a different product from an accent panel fixed against a feature wall, which is different again from a multi-panel divider spanning a wide opening in a villa living area. Note three things in writing before you request a quotation:
- Function: space divider, backdrop, or purely decorative insert. This drives panel thickness, fixing method and how the edges are finished.
- Setting: hotel lobby, clubhouse, resort reception, villa, or high-end residential interior. Indoor use changes what surface treatment is sensible.
- Openness: how much light and sight should pass through. A dense floral motif reads as a solid surface from a distance; an open laser-cut pattern throws shadow across floor and wall.
That statement of intent saves time later, because it decides which questions matter when the fabricator quotes.
Send drawings, photos or references — not adjectives
Words such as "luxurious" or "modern classic" cannot be fabricated. What we can fabricate is a dimensioned elevation, a scaled motif detail, or a photograph of the reference you are working from. For this product the standing instruction on the product page is exactly that: send a drawing, photo or reference, and the screen is made to exact dimensions.
A workable enquiry pack usually contains:
- An elevation or layout showing overall width and height, plus the position of any openings, doors or skirting returns.
- The motif at a legible scale — one repeat tile is enough if the pattern tiles cleanly across the panel.
- Panel division notes. A wide feature wall is nearly always split into panels for transport, handling and on-site assembly; state the number of panels you expect and where the joints may fall.
- Finish samples or finish names. Gold mirror is a reflective ground; rose gold is usually reserved for applied decorative elements such as floral accents, so the contrast reads at distance rather than turning into one flat metallic field.
- Substrate and fixing condition: what the screen sits against, and whether it is fixed, framed or standing free.
If you only have a photograph, send it. Reference images are a normal starting point on this product family, and the pattern gets redrawn for fabrication from whatever legible material you provide.
Confirm the four variables that change the price
On a bespoke metal screen, cost moves with four decisions. Settle them before you compare quotations, otherwise you will be comparing different products.
- Material and gauge. Stainless steel is the base material for this line; the grade and sheet thickness are confirmed per project rather than assumed, because they depend on panel size, span and how the panel is supported.
- Pattern complexity. Fine floral detail and applied rose gold accents take more fabrication time than a simple geometric cut. Where budget pressure appears, simplifying motif density is usually the first lever to pull without losing the design intent.
- Finish system. Gold mirror ground with rose gold decorative accents is the configuration this product page describes. Related finishes in the same family include brushed gold, matte black and antique bronze — see the laser-cut metal screen for hotel reception if a non-mirror surface suits the scheme better.
- Panel count and total area. Overall square metreage plus how many panels it breaks into drives both fabrication and packing. The bronze laser-cut partition is a useful comparison for wide, multi-panel feature walls.
Exact material grades, measurements, certifications and performance figures are confirmed at quotation stage for each project. Treat the specifications shown on a product page as configurable, not as a fixed standard.
What we do between enquiry and production
The route from an email to a shipped screen follows the same sequence our custom and OEM service describes: brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up.
In practice that means your reference is redrawn into a fabrication layout, panel joints and fixing details are agreed against your drawings, finishes are confirmed before cutting starts, and the finished panels go through production checks before packing. As a one-stop furniture and building materials supplier, we handle the screen alongside the other fixtures in the same fit-out — joinery, wall panelling, lighting, ceramics — which is where the coordination benefit shows up: one party accountable for dimensions that have to agree with each other on site.
Freight, customs paperwork and door-to-door delivery are arranged as part of the same project scope, so the screens arrive with the rest of the package rather than as an orphan shipment your site team has to chase separately.
Where this product normally specifies
- Hotel and resort lobbies: reception backdrops, lounge dividers, lift-lobby accents.
- Clubhouses and F&B outlets: screens that give tables privacy without blocking sightlines.
- Villas and penthouses: entry vestibules, living-room feature walls, dressing-area dividers.
- Commercial fit-out: showroom and office reception walls where brand colour is carried through the metal finish.
A short checklist before you send the enquiry
If you can answer these, the quotation that comes back will be directly comparable with your budget line:
- Overall opening width and height, in millimetres, with tolerance on the surrounding finishes.
- Number of panels and where joints are acceptable.
- Motif reference at a legible scale, plus whether accents such as rose gold florals are required or optional.
- Preferred finish family — mirror ground versus brushed or matte surface.
- Installation condition: who fixes on site, and what the screen is fixed to.
- Required delivery location and any site access limits that affect panel size.
Send the drawings or photographs you already have — an incomplete brief is a normal starting point, and the remaining gaps are usually closed in one round of clarification rather than several. Our contact page lists how to reach the project team; include your location, the room the screen sits in, and the programme date you are working to, and the reply comes back with the specification questions that actually affect cost.
SANTERSON fabricates decorative metal screens, partitions and interior fixtures for hotel, villa and commercial projects, with custom sizing, pattern and finish on request.