A swim spa is one of the few site-supplied items in a villa or resort package that touches four disciplines at once: structure, waterproofing, mechanical plant and electrical. If the model reaches the site as a single line on a schedule of finishes, the coordination work simply moves to the builder, usually late and usually at someone else's cost. This note walks through how we write up Outdoor Swim Spa WS-125AⅢ in a procurement brief, and what we ask the buyer to confirm at each stage.
1. State the exact model code, not just "swim spa"
Within one shell size there can be several configurations that look identical in a brochure and behave differently on site. The WS-125AⅢ and the WS-125AⅢ-U share the same catalog envelope of 5500 × 2300 × 1350 mm, but the -U variant is shown with four water pumps and a higher total power figure instead of a swim training set. Specifying only "125 series" leaves that decision open, and it is the difference between two different supply schedules, isolator ratings and circuit layouts.
Write the full model code in the brief and in the purchase order line item, then attach the configuration sheet you were quoted against. If a variant substitution happens later, the change is visible on the document trail rather than discovered when the crate arrives.
2. Record catalog dimensions as a starting point for the opening
The published figure for this model is 5500 × 2300 × 1350 mm, and that number is what we use when checking whether the unit fits a terrace, a deck cut-out or a plant room. Treat it as the catalog shell dimension rather than a final site clearance dimension: the working opening also has to absorb insulation build-up, access steps where they are specified, service access to the control system, and whatever the local waterproofing detail adds around the perimeter.
In the brief we ask for two numbers from the design team — the maximum opening the structure allows, and the minimum clear dimension the architect will accept — and we check the selected model against both. Where a different length is genuinely needed, the range also covers long outdoor swim spas with a separate hydrotherapy and relaxation pool, so a longer channel is an option rather than a variation.
3. Split the equipment list into "included" and "optional"
The catalog entry for this model shows one control system, one swim training set, one water pump, one filter pump, twenty jets in total and three LED lights. Those are the features listed for that configuration; they are not a promise that every accessory in the catalogue ships with every unit. Options listed across the range include additional control systems, UV sterilisation, extra water pumps, heat pumps, sand filtration, insulation and steps — availability and compatibility vary by model.
| Item to state in the brief | Why it matters downstream |
|---|---|
| Control system quantity and location | Determines where the interface sits relative to the coping and how the electrician runs low-voltage cabling. |
| Swim training set — included or not | The main functional difference between the two 125 configurations, and it drives pump count and power draw. |
| Jet count and jet layout | Affects plumbing manifolds inside the cabinet and clearance for maintenance access. |
| LED fitting count and colour scheme | Ties into the landscape lighting schedule and any project-wide control requirement. |
| Heat pump, insulation, UV sterilisation, sand filtration, steps | Options that change both the electrical load and the delivery breakdown; they must be on the order, not assumed. |
We ask buyers to reproduce this as a two-column list in their own brief: included as quoted, and optional at stated cost. It removes the most common argument at handover.
4. Put the power figure in front of the electrical engineer early
The catalog total power shown for the WS-125AⅢ is 8.05 kW, and that value belongs with the electrical consultant from the first coordination meeting, not at rough-in stage. Power for this product family moves with configuration: a heat pump, additional pumps or a different swim system all shift the connected load, which in turn changes cable sizing, protection devices and whether a dedicated circuit can still be routed to the spa location.
For each project we ask the buyer to confirm three things before production is released: the supply voltage and phase available at the site; whether a heat pump is on the order; and who supplies the isolator, protection device and final circuit. Getting those answers in writing at brief stage is what keeps the electrical drawing from being redrawn after the unit is manufactured.
5. Name the site conditions you are designing to
Swim spas in this range sit outdoors on terraces, decks and garden settings, and each of those has its own coordination list. We use the brief to capture:
- Support and loading — who designs the slab, deck framing or plinth, and confirmation that the finished opening matches the agreed dimensions.
- Drainage and overflow route — where the discharge goes, and who owns that part of the works.
- Waterproofing and tile set-out around the coping — dimension tolerance is decided here, not later.
- Lifting and access path — crane or manual route from the delivery point to the final position, checked against overhead structures.
- Wind, salt and shade exposure at the position — relevant when a heat pump or control interface is sited on an exposed elevation.
Where the project needs a non-standard footprint rather than a catalog size, the range also includes customizable-shape outdoor spas for personalised hydrotherapy pools, which is usually the cleaner route for irregular terraces and internal courtyards.
6. Write the delivery and installation sequence into the brief
A swim spa arrives as a manufactured unit that must be positioned before surrounding finishes are closed up, so the procurement brief should carry the same stage order the project runs in: confirmed model and configuration, production, packing and container loading, freight and customs documentation, delivery to site, positioning, connection, then commissioning and handover.
Our service scope covers design consultation and space planning, product specification, manufacturing with quality control, project management and site coordination, and installation support through to handover; freight is arranged by sea, air or rail with the accompanying paperwork. Timing, Incoterms, duties and delivery scope are confirmed per project rather than quoted as a standing promise, so we record them in the brief as agreed conditions instead of assumed ones.
7. Fix the acceptance criteria before order placement
The last section of a good brief is short and testable. For this item we list: model code as quoted; configuration sheet attached and initialled; dimensions confirmed against the structural opening; electrical parameters confirmed by the site engineer; option list matched to the purchase order; commissioning items signed off at handover; and the warranty, spare-parts and maintenance terms stated in writing. Anything that cannot be written as a checkable line is not yet specified — it is still an assumption.
Quick pre-order checklist
- Full model code, including any -U or option suffix
- Catalog dimensions checked against the structural opening and service access
- Included versus optional equipment listed separately
- Total power and supply requirements issued to the electrical consultant
- Lifting route and site access confirmed with the builder
- Freight terms, delivery point and installation scope agreed in writing
- Commissioning sign-off sheet and after-sales terms attached to the order
If you are assembling a package that also covers outdoor furniture, bathroom ceramics, lighting, cabinetry or wall and ceiling finishes, the same discipline applies across every trade — which is exactly what our swimming pools and swim spas range is written up to support. Send us the model code you are working to and the site conditions, and we will return a configuration sheet with the equipment list, power requirement and delivery breakdown set out for your brief.