Three product families, one aluminium frame platform, one factory in Foshan. This guide walks overseas buyers through how to specify and order the extendable slat dining table, the matching wicker dining set and the bar table and stool set from SANTERSON as a single coordinated outdoor package.

Hospitality and villa projects rarely need one outdoor table. A resort restaurant wants a dining zone that grows on busy nights, a terrace needs a smaller set that still photographs well, and a pool bar or café frontage needs high seating. Ordering these three layouts separately is where mistakes creep in: the weave colours drift, the frame tones do not match, containers arrive at different times and three separate suppliers each answer for a piece of the same terrace.

The cleaner route is to source them as one family from a single custom furniture and interior products manufacturer, sharing frames, finishes and a production schedule. Here is how that process works in practice.

1. Start with the extendable slat dining table

The anchor of the package is the extendable aluminium slat dining table with matching wicker dining set and bar table stool set. The slat-top table extends to take in extra diners during peak season, then closes back down when the terrace is running at normal cover. For a resort restaurant or a seasonal venue, that single detail decides whether you need one table plus spares or two tables permanently occupying the deck.

When you send your enquiry for this piece, three numbers drive everything else:

  • Closed and opened length, matched to your clear circulation space and door swings, not just the room plan.
  • Seat count at each setting, so chair quantities are ordered once rather than topped up mid-project.
  • Slat direction and finish tone, which sets the reference for every other table in the package.

2. Match the wicker dining set to the same frame

The chairs in this series are woven rope on aluminium frames, chosen for a light textured look and good air permeability in warm, humid settings. Metal surfaces are powder coated, which is why the series is specified for coastal sites where salt spray shortens the life of untreated metal.

If your scheme leans more tropical than linear, the synthetic wicker outdoor dining sets use an open lattice wicker chair on an aluminium frame with two tabletop choices: a round teak-look slat top for a casual atmosphere, or a square sintered stone top where daily cleaning matters most. The same chair carries across both layouts, so one venue can run round tables inside and square tables outside without the seating looking like two different purchases.

3. Add the bar table and stool set for your mixed zones

The high bar table with stools in the same family covers pool bars, café frontages and lounge-to-dining transitions. Because it shares the woven chair language and frame tone of the dining pieces, the transition from seated dining to standing height reads as designed rather than improvised.

For projects that want natural timber detailing instead of a rope-forward look, the aluminium outdoor dining set and bar table stool set with teak accents pairs a sled-base aluminium frame with teak decorative details. The sled base gives stability on uneven paving, and the matching dining and bar pieces let a resort carry one design language from the restaurant terrace through to the infinity pool bar.

How the ordering process runs

StageWhat you sendWhat we return
Brief and specificationLayout drawings or photos, quantities, table sizes, seat counts, target finish tonesConfiguration advice, recommended series, indicative quotation
Sample and confirmationApproved wicker shade, rope colour, cushion fabric, frame tonePhysical samples or reference swatches for sign-off before production
ProductionSigned specification and purchase orderFactory production with quality checks against the approved sample
Packing and shippingDelivery address, port or site, Incoterms agreed in writingPacking list, container loading plan, freight arrangement to site
Arrival and supportSite readiness confirmationAssembly guidance, inspection support, spare parts on request

Table dimensions, frame tones, rope colours, wicker shades and cushion fabrics are all adjustable to your design scheme, which is where working directly with the custom and OEM service team saves time: one specification sheet covers the extendable table, the wicker dining chairs and the bar stools, so colour matching happens in one place.

What to confirm before you place an order

  • Frame and fixing details for your exposure. Ask which coating system is applied and request the sample you will actually approve, rather than accepting a catalogue description.
  • Cushion specification. Confirm fabric type, foam density and whether cushions are stored in place or removed nightly at your site.
  • Extension mechanism service access. Ask how the slat top opens and how replacement parts are supplied, so maintenance does not depend on shipping a whole table.
  • Container consolidation. Ordering all three layouts together lets them ship as one consignment with one packing list, which simplifies receiving and reduces damage claims.
  • Written scope of after-sales support, including what is covered, for how long and how replacements are handled from your country.
Performance wording on product pages — coating systems, weather and salt-spray resistance, cushion behaviour — reflects the manufacturer's stated specifications. Request written confirmation of the specification you intend to specify, and check local building and import requirements for your project before ordering.

Why buyers consolidate this with one supplier

SANTERSON has been manufacturing furniture and building materials in China since 2008, supplying hospitality, villa and office projects. Outdoor dining is only part of what a single purchase order can carry: the same project team also handles turnkey furniture and building materials packages covering interior fixtures, cabinetry, lighting, wall and ceiling finishes and flooring, coordinated from design through to door-to-door delivery.

For Australian buyers this matters most on the coordination side. Published project references include villas in Sydney, Melbourne, Perth, Willoughby and North Turramurra, where outdoor dining, interior joinery and finishes had to arrive on one programme rather than several. Consolidating your terrace furniture with the rest of the fit-out keeps colour matching, delivery windows and after-sales responsibility with a single accountable supplier.

Send us your outdoor dining layout

Share your plan, quantities and target finish tones and we will quote the extendable slat table, matching wicker chairs and bar set as one coordinated package. Contact PHILLIP on WhatsApp +86-13928214007, email santerson@qq.com, or use the contact page — enquiries receive a response within 24 hours.