A wall-hung vanity can make a villa bathroom feel lighter and easier to clean underneath, but it also moves decisions forward that a freestanding unit lets you postpone. Wall support, drainage position, basin choice and drawer layout all have to be settled before production starts. This guide walks through how we configure the Santerson Floating Vanity for villa work, what we need from your drawings, and where the practical limits sit.
What a floating vanity changes in a villa bathroom
A floating vanity is carried on the wall rather than resting on the floor. In practice that gives you three things a villa owner notices, and one thing the builder notices.
- Floor runs clear to the wall. Tiles continue under the unit, so there is no plinth to cut around and no shadow gap collecting dust at the skirting line. Cleaning is simpler, and the same tile field reads through guest bathrooms and main ensuites.
- The room looks less fitted out. Because the underside is open, a long vanity in a narrow ensuite reads shorter visually. That matters in villas where several bathrooms share a small footprint.
- Height becomes a design decision. You set the finished hanging height instead of accepting a floor-standing carcass dimension. For ensuites used by children or by older family members, that adjustment is worth having early.
- The wall has to do the work. The load path runs through the substrate and fixings, so solid backing behind the fixing line is not optional. This is the item most often discovered late on site.
Specification decisions we settle before production
Our vanities are made to order, so the choices below are locked into the drawings rather than picked from a fixed catalogue size. Each one affects price, packing and the sequence of wet trades on site.
1. Size and where it is allowed to project
Send us the clear wall width and the finished wall face, not the structural line. We then confirm the projection from that finished face, including the countertop edge, basin rim, tap spout reach and any drawer pull. A vanity that fits on a plan can still foul a door swing, a toilet cistern or a shower screen once taps and handles are added.
2. Carcass material and finish
Tell us how the bathroom is used before choosing a finish. A main family ensuite sees daily splashing and towels pressed against the fronts; a guest powder room does not. We work in wood, metals, engineered stone and laminates for bespoke finishes and textures, so the same layout can be dressed to match joinery elsewhere in the villa or kept deliberately plain.
3. Countertop and basin combination
The vanity is only half of the washhand station. Decide at the same time whether you want an integrated basin formed with the counter, a vessel basin above the counter, or an undermount basin set below it. Each answer changes the counter thickness we produce, the cutout, the tap hole positions and the clearance needed above the deck for the tap body.
4. Storage layout room by room
Drawers suit low, deep storage under a basin; open niches suit towels within reach of a shower; a plain closed front hides things that do not need to be seen. We split the internal layout per bathroom rather than repeating one module through the whole house. If you use our double vanity in the principal ensuite, we also confirm which side carries drawers and which stays clear for legroom.
5. Wall support and fixing method
Before we produce anything, your builder confirms the substrate behind the fixing line: solid backing or a framed wall with a reinforcement frame at the vanity height, set out to our dimension drawing. We work to that confirmed build-up rather than assuming one. Where the finished wall is stone or large-format tile, we agree whether the fixings pass through the finish or land on prepared timber, because that changes the setting-out.
6. Drainage and services
With the unit off the floor, the waste and any bottle trap sit in view unless they are set into the wall. Tell us early whether you want a wall outlet or a floor outlet inside the open zone, and where the tailwater and hot and cold outlets fall relative to the carcass. Those positions come from your side of the project; we design the cabinet around them.
7. Lighting and mirrors
Vanity lighting and the mirror are set out with the cabinet, not after it. Vanity lighting needs a supply position that clears the counter depth and the mirror, and a wall sconce beside the mirror needs to sit away from the splash zone of the basin. We mark these on the same drawing so electricians chase them in before the wall is closed.
Matching the vanity to the rest of the villa
A floating vanity rarely stands alone in a villa project. Because we manufacture furniture and building materials together, the fronts, drawer faces, wall panelling and doors can be produced in one run so the grain, sheen and edge detail match across rooms instead of being matched by eye from three suppliers.
Where a villa has an adjoining dressing area, we carry the same finish into open walk-in wardrobe fronts and combination modular wardrobes, so the bathroom joinery and the dressing room read as one set. For a shared family bathroom, our integrated countertop vanity is usually the better fit than a floating unit when you want maximum storage and a seamless counter-to-basin surface.
How the order actually runs
| Stage | What we need from you | What we produce |
|---|---|---|
| Brief and layout | Room drawings, who uses each bathroom, preferred style | Layout proposal and product specification for the vanities |
| Detail confirmation | Confirmed wall build-up, waste position, tap and basin choice, finish sample approval | Dimension drawings for sign-off, quotation with packing breakdown |
| Production | Signed drawings and approved samples | Cabinet, fronts, counter and basins to the signed specification |
| Delivery | Delivery address and access notes | Packed shipment with the paperwork your clearing agent needs |
| Installation and handover | Site ready: walls set out, services in place | Hanging, alignment, snag list and replacement parts support |
Our project services cover design coordination through to installation and after-sales support, and our custom and OEM service covers bespoke sizes, finishes and prototyping when a standard layout does not fit the room.
A pre-production checklist
Confirm all of these before you release the drawings for production
- Finished wall face dimension, not the structural wall line.
- Clearance from door swing, toilet, shower screen and any recess.
- Solid backing or reinforcement frame at the fixing height, built to our setting-out.
- Waste outlet position, trap type, and whether tailwater is exposed or in the wall.
- Basin type and counter material, with tap holes and spout reach marked.
- Drawer, niche and closed-front layout for each individual bathroom.
- Mirror and lighting supply positions on the same drawing as the cabinet.
- Finish sample signed off against the joinery used elsewhere in the villa.
Questions we are asked most often
Can one design be sized differently for each bathroom?
Yes. Each unit is made to the dimensions on your signed drawing, so a 1800 mm double station in the principal ensuite and a 600 mm single station in the powder room can share the same fronts and finish.
Is a floating vanity suitable for a small guest bathroom?
It is often the best choice, because the open floor under the unit keeps the room reading larger and the tile field continuous. Storage drops, so we usually trade depth for drawers rather than adding a tall cabinet.
Do you supply the counter and basin with the cabinet?
They can be supplied together as one specification, which is how we avoid mismatched cutouts. Basin, countertop and tapware are confirmed against the same drawing before production.
Who installs it?
Your builder sets out the backing and services to our drawing. We support hanging, alignment and snagging as part of our installation and after-sales service.
Getting a quotation for your villa
Send us the bathroom layouts with dimensions, the wall build-up you intend to build, and the basins and taps you have in mind. We will come back with a specification and dimension drawings for each vanity, so you can see the hanging height, projection and storage layout before anything enters production. Start from the floating vanity product page or use our contact page, and we will work through it with you room by room.
SANTERSON is a China-based furniture and building materials manufacturer supplying villa, hospitality and office projects. We do not publish fixed dimensions or load ratings for this product range; every floating vanity is engineered to the drawings of your specific project.