An outdoor swim spa is not an off-the-shelf purchase. Before we can price Outdoor Swim Spa WS-S08CT, we need to know where it will sit, what it will be used for and which equipment you want fitted. The information below is exactly what our engineering team works from when a quotation is prepared, so sending it in one message usually shortens the first round of correspondence to a single exchange.

Start with the site conditions

Tell us whether the spa will sit on an existing slab, a raised deck, a sunken pit or a rooftop terrace, and give us the clear opening dimensions available. WS-S08CT is listed in our catalogue at 8000 × 2400 × 1420 mm, so the question is rarely whether the shell fits; it is how the unit reaches the position. Stair widths, turning radii, gate openings and whether a crane or a hiab will be needed all change the delivery cost, and on tight residential sites they can decide between a one-piece shell and a sectional build.

Please also send photographs of the prepared area and a simple sketch with measurements. For resort, clubhouse and multi-villa schemes, a plan drawing showing several units is enough for us to comment on siting, plant locations and access routes.

Confirm the equipment you want

The catalogue specification for this model records one control system, one swim training system, one water pump, one filter pump, 35 jets, six LED lights and a total power figure of 8.35 kW, with water jets, temperature setting, LED lighting, ozone and a swim training system shown as features. Treat that list as the starting point rather than the final build. Our catalogue also lists optional accessories for this range, including additional control systems, UV sterilisation, extra water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each item against the configuration you select.

Shell size on catalogue8000 × 2400 × 1420 mm
Control system1 set
Swim training system1 set
Water pump / filter pump1 pc / 1 pc
Jets35 pcs
LED lighting6 lights
Total power8.35 kW
Features shownWater jets, temperature setting, LED lighting, ozone, swim training system
Electrical supply is the item most often left out of early enquiries. Please tell us the available supply at site: phase, voltage, frequency and the main breaker rating. We will confirm the included equipment and the electrical requirements for your configuration before production begins.

Tell us how the spa will be used

The intended use decides which options are worth specifying. A household that swims laps against the current each morning needs the swim training system and a heat pump sized for year-round water temperature. A hotel or villa rental that sells hydrotherapy sessions cares more about jet layout, ozone and UV sterilisation, and about how quickly staff can maintain the water between guests. A wellness or rehabilitation facility usually asks for seating depth, entry steps and handrail positions to be settled at drawing stage. Send us the usage pattern and the expected daily bather load, and we will specify accordingly.

What else to include with your enquiry

  • Project location and the delivery address, including whether it is a private residence or a commercial site with loading restrictions.
  • Quantity. A single unit and a batch for several villas are quoted and shipped differently.
  • Preferred finish: cabinet cladding colour, shell colour, cover type and step configuration.
  • Whether you want the spa as a standalone item or coordinated with other outdoor works such as decking, pergolas and poolside furniture from our outdoor furniture range.
  • Any drawings, mood boards or specification sheets you are working from.

How the quotation is prepared and delivered

WS-S08CT is one model within our wider swimming pools and swim spas range, so if the site conditions or budget point elsewhere we will say so and recommend a closer fit rather than force the original choice. Because we supply furniture and building materials for the same project, many clients ask us to handle the swim spa alongside cabinetry, sanitary fixtures, lighting and outdoor furnishings under one programme; our one-stop solution page describes how that coordination works, from material selection through to site handover.

Once the specification is fixed we issue an itemised quotation showing the shell, the fitted equipment, the options selected and the packing arrangement. Freight is then quoted separately for your port or door address; our logistics and door-to-door delivery service covers sea, air and rail forwarding with the associated paperwork. Installation support and after-sales arrangements are set out on a separate page so you can see what is included before you commit.

Send your enquiry. Include site photographs, clear opening dimensions, the available electrical supply, intended use and quantity, and we will return an itemised quotation for WS-S08CT or a more suitable model from the range.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com  |  Contact page

Enquiries are answered Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).